Upload Button Icon Add office photos

Psp Projects

Compare button icon Compare button icon Compare

Filter interviews by

Psp Projects Deputy Manager Interview Questions and Answers

Updated 25 Aug 2023

Psp Projects Deputy Manager Interview Experiences

2 interviews found

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Normally every company asked
Round 3 - Technical 

(1 Question)

  • Q1. It's all about Aroject Management
Round 4 - Technical 

(1 Question)

  • Q1. All the process of Construction, Management and client dealing.
  • Ans. 

    The process involves overseeing construction projects, managing resources, and maintaining client relationships.

    • Overseeing construction projects from start to finish

    • Managing resources such as materials, labor, and equipment

    • Maintaining client relationships through effective communication and problem-solving

    • Ensuring projects are completed on time and within budget

    • Adhering to safety regulations and quality standards

    • Handli...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Scheduling to update in MSP.
  • Ans. 

    Scheduling to update in MSP involves inputting and adjusting project tasks and timelines in Microsoft Project.

    • Input new tasks and deadlines

    • Adjust existing tasks and timelines as needed

    • Ensure dependencies are accurately reflected

    • Regularly review and update the schedule

    • Communicate any changes to team members

  • Answered by AI
  • Q2. General procedure for structural concrete.
  • Ans. 

    General procedure for structural concrete involves mixing, pouring, and curing concrete to create a strong and durable structure.

    • Prepare the site by setting up formwork and ensuring proper reinforcement

    • Mix concrete ingredients in the correct proportions

    • Pour the concrete into the formwork and level it

    • Allow the concrete to cure and gain strength over time

    • Finish the surface as needed for the specific application

  • Answered by AI

Deputy Manager Interview Questions Asked at Other Companies

asked in HDFC Bank
Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with u ... read more
Q2. How would you sale our products to your existing clients?
asked in ICICI Bank
Q3. What are the important ratios you will check to sanction a loan t ... read more
Q4. What we do for shortage of material received?
Q5. What was your major master areas?

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. CBR requirement of soil.
  • Ans. 

    CBR requirement of soil is a measure of its strength and ability to support heavy loads.

    • CBR stands for California Bearing Ratio.

    • It is a measure of the strength of a soil to support loads applied to it.

    • Higher CBR values indicate stronger soil.

    • CBR values are used in designing pavement structures.

    • Different types of soil have different CBR requirements.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
-

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Telephonic Call 

(1 Question)

  • Q1. Roles and Responsibilities
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Family Background
  • Q2. Who is ur father etc…. Locality and all
  • Ans. 

    My father is a retired government official who served in the education department. We live in a peaceful neighborhood in the suburbs.

    • My father is a retired government official

    • He worked in the education department

    • We live in a peaceful neighborhood in the suburbs

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Do not join … No relieveing letter or experience letter after serving notice period …. Wrost company

I applied via Naukri.com

Interview Questionnaire 

1 Question

  • Q1. Technical

Interview Preparation Tips

Interview preparation tips for other job seekers - In mechanical interview, mainly u will be asked for the name of the eqpts and models u had dealt. Then questions will be asked about detail features of any eqpt. Fuel consumption is a must question. Again it will continue for other eqpts and plant. In plant mainly HMP and crusher will be asked.

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Cube Compressive achieving Percentage time periods?
  • Ans. 

    Cube compressive achieving percentage time periods

    • The question is asking about the percentage of time periods in which cube compressive strength is achieved

    • Cube compressive strength refers to the ability of a cube-shaped material to withstand compression

    • The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength

    • Examples of data points needed: time periods,

  • Answered by AI
  • Q2. M20 grade and M means and 20 means and unit
  • Q3. 1:1.5:3 ,M-Mix,20 -Compresive strength,N/mm²

Interview Preparation Tips

Interview preparation tips for other job seekers - Be face Bolt don't jerk anyone becoz they also Human
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

How to handle team. How you will give satisfactory response to clients

Round 2 - One-on-one 

(1 Question)

  • Q1. How to tackle clients?
  • Ans. 

    Tackling clients involves building relationships, understanding their needs, and providing excellent customer service.

    • Listen actively to clients to understand their needs and concerns

    • Communicate clearly and effectively to address any issues or questions

    • Provide personalized solutions and excellent customer service to build trust and loyalty

    • Follow up with clients to ensure satisfaction and address any further needs

    • Handle...

  • Answered by AI

Psp Projects Interview FAQs

How many rounds are there in Psp Projects Deputy Manager interview?
Psp Projects interview process usually has 3 rounds. The most common rounds in the Psp Projects interview process are Technical, Resume Shortlist and HR.
How to prepare for Psp Projects Deputy Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Psp Projects. The most common topics and skills that interviewers at Psp Projects expect are Bulk Hiring, Civil Engineering, Construction Projects, Contracts and Event Management.
What are the top questions asked in Psp Projects Deputy Manager interview?

Some of the top questions asked at the Psp Projects Deputy Manager interview -

  1. All the process of Construction, Management and client deali...read more
  2. General procedure for structural concre...read more
  3. Scheduling to update in M...read more

Tell us how to improve this page.

Psp Projects Deputy Manager Interview Process

based on 2 interviews

Interview experience

3
  
Average
View more
Psp Projects Deputy Manager Salary
based on 10 salaries
₹8.8 L/yr - ₹15.3 L/yr
6% more than the average Deputy Manager Salary in India
View more details

Psp Projects Deputy Manager Reviews and Ratings

based on 1 review

2.0/5

Rating in categories

2.0

Skill development

3.0

Work-life balance

3.0

Salary

2.0

Job security

2.0

Company culture

2.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Senior Engineer
153 salaries
unlock blur

₹2.7 L/yr - ₹9.5 L/yr

Assistant Engineer
148 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Junior Engineer
81 salaries
unlock blur

₹1 L/yr - ₹4.5 L/yr

Assistant Engineer - Civil
50 salaries
unlock blur

₹2.6 L/yr - ₹5.6 L/yr

Senior Civil Engineer
50 salaries
unlock blur

₹4 L/yr - ₹8.5 L/yr

Explore more salaries
Compare Psp Projects with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.9
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview