Round 1 - Technical 

(4 Questions)

  • Q1. What is the Steel margin
  • Ans. 

    Steel margin refers to the difference between the cost of producing steel and the selling price.

    • Steel margin is calculated by subtracting the cost of production (including raw materials, labor, and overhead) from the selling price of steel products.

    • It is important for companies to maintain a healthy steel margin to ensure profitability and sustainability.

    • Factors that can impact the steel margin include fluctuations in ...

  • Answered by AI
  • Q2. What is the persentage of Aggregate in Gradiation test
  • Ans. 

    The percentage of aggregate in gradation test varies depending on the specific requirements of the project.

    • The percentage of aggregate in gradation test is typically determined by the specifications provided for the project

    • It can range from 0% to 100% depending on the type of aggregate being used and the desired characteristics of the final mix

    • For example, in a concrete mix design, the percentage of coarse aggregate ma...

  • Answered by AI
  • Q3. Project manager role at site
  • Ans. 

    The project manager plays a crucial role in overseeing and coordinating all aspects of a project at the site.

    • Responsible for planning, organizing, and directing project activities

    • Ensuring project goals are met within budget and timeline

    • Managing resources and stakeholders effectively

    • Problem-solving and decision-making skills are essential

    • Strong communication and leadership skills are necessary

  • Answered by AI
  • Q4. What is the overall cost in project in role of RCC
  • Ans. 

    The overall cost in a project in the role of RCC refers to the total expenses incurred for the Reinforced Cement Concrete work.

    • Calculate the cost of materials such as cement, aggregates, and reinforcement bars.

    • Consider the cost of labor for construction and installation of RCC components.

    • Include any additional costs such as equipment rental, transportation, and overhead expenses.

    • Factor in the cost of quality control me...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Mot Satisfaction job
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Can you make bbs?
  • Ans. 

    Yes, I can make bbs.

    • I have experience in creating project schedules and budgets.

    • I am skilled in coordinating with team members and stakeholders.

    • I can effectively manage resources to ensure project success.

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Personal details
  • Q2. Any work experience which is memorable?
  • Ans. 

    Working on a high-profile construction project with tight deadlines and complex requirements.

    • Coordinating with multiple stakeholders to ensure project milestones were met

    • Managing a team of subcontractors and ensuring quality control

    • Problem-solving on the fly to address unexpected challenges

    • Presenting project updates to senior management and clients

  • Answered by AI

Assistant Project Manager Interview Questions Asked at Other Companies

asked in Uflex
Q1. What are the different phases in new product development?
asked in JLL
Q2. Q1- What Is 456 Q2- Type of beam section Q3- What is Factor of sa ... read more
Q3. What activities are performed in the testing and commissioning of ... read more
Q4. What are the new technologies in Utilities that you have worked w ... read more
Q5. In case of Incomer failure how will you restore Auxiliary Supply

Interview questions from similar companies

I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Overall experience till date and how will it be beneficial for executing type of projects being executed by L&T

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and honest, no exaggeration while answering.

I applied via Walk-in and was interviewed in Jul 2021. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. All civil work related questions asked me.
  • Q2. All civil work, quality, safety specification , technical method.
  • Q3. Planning ( msp), work scheduling.project target capture planned.

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview very fine.our confidential very true. Work period satisfaction .
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. What is the minimum compressive strength of M25 grade concrete?
  • Ans. 

    M25 grade concrete has a minimum compressive strength of 25 MPa (megapascals) at 28 days of curing.

    • M25 is a medium-grade concrete used in structural applications.

    • The compressive strength is determined through standard cube tests.

    • For M25, the standard cube size is typically 150mm x 150mm x 150mm.

    • It is commonly used in residential buildings, pavements, and precast elements.

    • M25 concrete mix typically consists of a ratio o

  • Answered by AI
  • Q2. What is the significance of the lapping zone in columns?
  • Ans. 

    The lapping zone in columns is crucial for structural integrity and load distribution in reinforced concrete structures.

    • Lapping zone refers to the area where two reinforcing bars overlap to ensure continuity.

    • It helps in transferring loads effectively between the bars, preventing weak points.

    • Proper lapping length is essential to avoid failure; typically, it is 40 times the diameter of the bar.

    • In seismic zones, adequate ...

  • Answered by AI
  • Q3. What is the slump test and its significance in construction?
  • Ans. 

    The slump test measures the consistency and workability of fresh concrete, crucial for construction quality.

    • The slump test involves filling a conical mold with concrete and measuring the vertical drop after removing the mold.

    • A higher slump indicates more workability, suitable for complex shapes; a lower slump indicates stiffer concrete, ideal for structural elements.

    • For example, a slump of 0-25 mm is typical for struct...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Stay calm and quiet at the moment.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Estimation of a small building.

Round 3 - Technical 

(4 Questions)

  • Q1. Ratio of block work motor and plastrimg motor.
  • Ans. 

    The ratio of block work motor to plastering motor is typically 1:3.

    • The ratio of block work motor to plastering motor is usually 1:3.

    • This means for every 1 part of block work motor, 3 parts of plastering motor are used.

    • The ratio may vary depending on the specific project requirements.

  • Answered by AI
  • Q2. Per day productivity of a labour
  • Ans. 

    The productivity of a laborer can be calculated by the amount of work completed in a day.

    • Productivity is measured by the amount of work completed in a specific time frame, in this case, per day.

    • Factors affecting productivity include skill level, motivation, tools/equipment available, and working conditions.

    • Example: A construction worker completing 10 tasks in a day is more productive than one completing only 5 tasks.

  • Answered by AI
  • Q3. Amount of binding wire to be used per tone of reinforcement
  • Ans. 

    Binding wire is typically used at a rate of 8-10 kg per ton of reinforcement.

    • Typically, 8-10 kg of binding wire is used per ton of reinforcement to secure the bars in place.

    • The amount of binding wire needed may vary based on the complexity of the reinforcement design and the spacing between bars.

    • Using too little binding wire can result in inadequate reinforcement stability, while using too much can be wasteful and incr

  • Answered by AI
  • Q4. Density of materials
  • Ans. 

    Density of materials is a measure of how much mass is contained in a given volume.

    • Density is typically measured in units such as grams per cubic centimeter (g/cm^3) or kilograms per liter (kg/L).

    • Materials with higher density have more mass packed into a given volume.

    • Common examples of materials with high density include metals like lead and gold.

    • Materials with low density include gases like helium and liquids like oil.

  • Answered by AI
Round 4 - HR 

(1 Question)

  • Q1. Salary discussed

Interview Preparation Tips

Interview preparation tips for other job seekers - Feel free to talk to the interviewer
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Bar Bending Schedule
  • Q2. Find out shuttering Area
  • Ans. 

    Shuttering area can be calculated by finding the total surface area of the formwork used for concrete construction.

    • Calculate the surface area of each individual formwork used for the concrete structure

    • Add up the surface areas of all formworks to get the total shuttering area

    • Consider any openings or gaps in the formwork when calculating the area

  • Answered by AI
  • Q3. Semi circle area formula
  • Ans. 

    The formula for the area of a semi-circle is (1/2) * pi * r^2, where r is the radius of the semi-circle.

    • The formula for the area of a semi-circle is (1/2) * pi * r^2

    • The radius (r) is half the diameter of the circle

    • Example: If the radius of a semi-circle is 5 cm, the area would be (1/2) * 3.14 * 5^2 = 39.25 cm^2

  • Answered by AI
Round 2 - HR 

(3 Questions)

  • Q1. Why u want to join this company ?
  • Q2. Why u want to quit Your present company
  • Q3. About my Salary
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
-

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - Telephonic Call 

(1 Question)

  • Q1. Roles and Responsibilities
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. CBR requirement of soil.
  • Ans. 

    CBR requirement of soil is a measure of its strength and ability to support heavy loads.

    • CBR stands for California Bearing Ratio.

    • It is a measure of the strength of a soil to support loads applied to it.

    • Higher CBR values indicate stronger soil.

    • CBR values are used in designing pavement structures.

    • Different types of soil have different CBR requirements.

  • Answered by AI

I applied via Naukri.com

Interview Questionnaire 

1 Question

  • Q1. Technical

Interview Preparation Tips

Interview preparation tips for other job seekers - In mechanical interview, mainly u will be asked for the name of the eqpts and models u had dealt. Then questions will be asked about detail features of any eqpt. Fuel consumption is a must question. Again it will continue for other eqpts and plant. In plant mainly HMP and crusher will be asked.

Psp Projects Interview FAQs

How many rounds are there in Psp Projects Assistant Project Manager interview?
Psp Projects interview process usually has 1-2 rounds. The most common rounds in the Psp Projects interview process are Technical and HR.
What are the top questions asked in Psp Projects Assistant Project Manager interview?

Some of the top questions asked at the Psp Projects Assistant Project Manager interview -

  1. What is the persentage of Aggregate in Gradiation t...read more
  2. What is the overall cost in project in role of ...read more
  3. What is the Steel mar...read more

Tell us how to improve this page.

Psp Projects Assistant Project Manager Interview Process

based on 4 interviews

Interview experience

3.8
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 117 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 60 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
View all

Psp Projects Assistant Project Manager Reviews and Ratings

based on 4 reviews

2.9/5

Rating in categories

3.4

Skill development

2.5

Work-life balance

3.4

Salary

3.1

Job security

3.0

Company culture

3.2

Promotions

3.0

Work satisfaction

Explore 4 Reviews and Ratings
Senior Engineer
154 salaries
unlock blur

₹2.7 L/yr - ₹10 L/yr

Assistant Engineer
152 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Junior Engineer
81 salaries
unlock blur

₹1 L/yr - ₹4.5 L/yr

Senior Civil Engineer
51 salaries
unlock blur

₹4 L/yr - ₹8.5 L/yr

Assistant Engineer - Civil
50 salaries
unlock blur

₹2.6 L/yr - ₹5.4 L/yr

Explore more salaries
Compare Psp Projects with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.9
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare