Updated 19 Jan 2021

L&T Energy Hydrocarbon Assistant Project Manager Interview Experiences

1 interview found

I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Overall experience till date and how will it be beneficial for executing type of projects being executed by L&T

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and honest, no exaggeration while answering.

Interview questions from similar companies

I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. None? better opportunities available?
  • Q2. Many. Mostly Guld country

Interview Preparation Tips

Interview preparation tips for other job seekers - Avoid the firm. Poor management trying to salvage the company by treating employees like merchandise to be used until broken.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical profile related questions working experience wise quality
Round 3 - HR 

(1 Question)

  • Q1. Document verification sallary bank statement sallary discussion
Round 4 - Behavioral 

(1 Question)

  • Q1. Know about you and work education femily and other
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Difference between Extra Dose and cable stay bridge.
  • Ans. 

    Extra Dose bridge has additional support structures while cable stay bridge uses cables to support the bridge deck.

    • Extra Dose bridge has additional piers or columns for support.

    • Cable stay bridge uses cables attached to towers to support the bridge deck.

    • Extra Dose bridge is more common for shorter spans while cable stay bridge is used for longer spans.

    • Cable stay bridges have a more modern and sleek appearance compared t

  • Answered by AI
  • Q2. Why u want to leave your current company
  • Q3. Types of contract.
  • Ans. 

    Types of contracts include express, implied, unilateral, bilateral, and voidable contracts.

    • Express contract: Clearly stated terms and conditions, either written or verbal.

    • Implied contract: Terms inferred from the actions or conduct of the parties involved.

    • Unilateral contract: One party makes a promise in exchange for the performance of an act by the other party.

    • Bilateral contract: Both parties exchange promises to perf...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Apco Infratech Assistant Manager interview:
  • Detail structure
  • Highways
  • SAP
  • Primavera
  • MSP
  • Client Billing
  • Sub Contractor Billing
Interview preparation tips for other job seekers - Overall APCO INFRASTRUCTURE is a good growing company. Slary is credited in time. Only staff welfare are not good.

I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Tell me about yourself.
Round 3 - Technical 

(1 Question)

  • Q1. What is consolidation of soil?
  • Ans. 

    Consolidation of soil is the process of gradual reduction in volume of soil due to expulsion of water from its voids under static load.

    • Consolidation occurs when a load is applied to a soil mass causing the soil particles to rearrange themselves and expel water from the voids.

    • This process is time-dependent and can take years to complete.

    • Consolidation can cause settlement and deformation of structures built on top of the...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarvee Associates Assistant Manager interview:
  • Soil Mechanics
Interview preparation tips for other job seekers - Prepare technically basic questions
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. What is COS and stages involved init
  • Ans. 

    COS stands for Cost of Sales, which refers to the direct costs associated with producing goods or services.

    • COS includes costs such as raw materials, labor, and manufacturing overhead.

    • Stages involved in COS include identifying direct costs, calculating total COS, and analyzing COS to determine profitability.

    • Example: If a company sells a product for $100 and the direct costs to produce that product are $60, the COS would...

  • Answered by AI
  • Q2. What do you mean by EOT
  • Ans. 

    EOT stands for End of Transmission. It is a signal used to indicate the end of a transmission of data.

    • EOT is commonly used in telecommunications and computer networking to signify the end of a message or data transmission.

    • It is represented by the ASCII control character with the code 04.

    • EOT is often used in conjunction with other control characters like SOH (Start of Header) and ETX (End of Text) in communication proto...

  • Answered by AI
  • Q3. What is a CLAIM
  • Ans. 

    A claim is a request made by an individual or entity for payment of benefits or services covered by an insurance policy.

    • A claim is typically submitted by a policyholder or healthcare provider to an insurance company.

    • It includes details such as the services provided, dates of service, and the amount billed.

    • The insurance company reviews the claim to determine if it meets the policy's coverage criteria.

    • Once approved, the ...

  • Answered by AI
  • Q4. What do you mean by RFI
  • Ans. 

    RFI stands for Request for Information, which is a formal process used to gather information from potential suppliers or vendors.

    • RFI is typically used in procurement processes to collect information about products, services, or suppliers before making a decision.

    • It helps organizations to understand the capabilities, pricing, and other details of potential suppliers.

    • RFIs are often used as a preliminary step before issui...

  • Answered by AI
  • Q5. How todo Estimates
  • Ans. 

    Estimates are calculated predictions of the cost, time, and resources required for a project.

    • Gather all relevant information and data related to the project

    • Break down the project into smaller tasks or components

    • Use historical data or industry benchmarks to estimate the time and cost for each task

    • Consider any potential risks or uncertainties that may impact the estimates

    • Document the estimates and communicate them clearl

  • Answered by AI

Skills evaluated in this interview

I applied via Company Website and was interviewed in Jun 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Why you left from your current company? What is your job profile? How to manage all things? To whom reported? How many employee in your current & previous company? What was the roll in previous company? Ho...
  • Q2. What is your current job location. What is the project cost? How much percentage hike my salary? What is the leave policy, HR Policies extra .

Interview Preparation Tips

Interview preparation tips for other job seekers - What is the achievements in previous companies.

I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality checking methods
  • Q2. Design reviews checking.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answers only technically.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. EHS Defination with explanation
  • Ans. 

    EHS stands for Environment, Health, and Safety. It refers to the laws, rules, standards, and programs that are designed to protect the health and safety of employees and the public as well as the environment.

    • EHS involves identifying and assessing risks in the workplace related to health, safety, and the environment.

    • It includes implementing measures to control and mitigate these risks, such as providing proper training,...

  • Answered by AI
  • Q2. BOCW Act with Factory Act

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(7 Questions)

  • Q1. Details of Procurement Process
  • Ans. 

    Procurement process involves identifying needs, selecting suppliers, negotiating contracts, and managing relationships.

    • Identify needs and requirements

    • Research and select potential suppliers

    • Negotiate terms and conditions

    • Create and sign contracts

    • Manage supplier relationships and performance

    • Monitor and evaluate procurement process effectiveness

  • Answered by AI
  • Q2. Understanding the material to be purchased
  • Q3. Suppliers database ans popular suppliers
  • Q4. Achievements in given project assignment
  • Q5. Supplier evaluation and selection process
  • Q6. Awareness of terms and conditions used in EPC projects
  • Q7. Integrity with internal stake holders
  • Ans. 

    Integrity with internal stakeholders is crucial for building trust and maintaining a positive work environment.

    • Communicate openly and honestly with colleagues and superiors

    • Respect confidentiality and avoid gossip or spreading rumors

    • Follow through on commitments and hold yourself accountable

    • Act with fairness and impartiality in decision-making

    • Admit mistakes and take responsibility for correcting them

    • Lead by example and

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - While attending the interview, keep your responses to the point.
Keep your involvement in your existing job and mark/ keep abreast on all such tiny issues, that will represent your strength for the required position.

L&T Energy Hydrocarbon Interview FAQs

How to prepare for L&T Energy Hydrocarbon Assistant Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at L&T Energy Hydrocarbon. The most common topics and skills that interviewers at L&T Energy Hydrocarbon expect are Aerospace, Customer Complaints, ERP, Interpersonal Skills and Management Systems.

Tell us how to improve this page.

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 117 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all
L&T Energy Hydrocarbon Assistant Project Manager Salary
based on 6 salaries
₹11 L/yr - ₹16.5 L/yr
50% more than the average Assistant Project Manager Salary in India
View more details

L&T Energy Hydrocarbon Assistant Project Manager Reviews and Ratings

based on 2 reviews

4.8/5

Rating in categories

4.0

Skill development

2.3

Work-life balance

3.7

Salary

3.9

Job security

3.0

Company culture

3.0

Promotions

3.9

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
827 salaries
unlock blur

₹4.9 L/yr - ₹19 L/yr

Manager
328 salaries
unlock blur

₹10.2 L/yr - ₹30 L/yr

Senior Engineer
276 salaries
unlock blur

₹4.3 L/yr - ₹12 L/yr

Piping Engineer
138 salaries
unlock blur

₹2.5 L/yr - ₹11 L/yr

Assistant General Manager
129 salaries
unlock blur

₹17 L/yr - ₹36 L/yr

Explore more salaries
Compare L&T Energy Hydrocarbon with

AECOM

4.2
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare

Aarvee Associates

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview