L&T Energy Hydrocarbon Assistant Project Manager Interview Questions and Answers

Updated 19 Jan 2021

L&T Energy Hydrocarbon Assistant Project Manager Interview Experiences

1 interview found

I applied via Referral and was interviewed in Dec 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Overall experience till date and how will it be beneficial for executing type of projects being executed by L&T

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and honest, no exaggeration while answering.

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. What is the Steel margin
  • Ans. 

    Steel margin refers to the difference between the cost of producing steel and the selling price.

    • Steel margin is calculated by subtracting the cost of production (including raw materials, labor, and overhead) from the selling price of steel products.

    • It is important for companies to maintain a healthy steel margin to ensure profitability and sustainability.

    • Factors that can impact the steel margin include fluctuations in ...

  • Answered by AI
  • Q2. What is the persentage of Aggregate in Gradiation test
  • Ans. 

    The percentage of aggregate in gradation test varies depending on the specific requirements of the project.

    • The percentage of aggregate in gradation test is typically determined by the specifications provided for the project

    • It can range from 0% to 100% depending on the type of aggregate being used and the desired characteristics of the final mix

    • For example, in a concrete mix design, the percentage of coarse aggregate ma...

  • Answered by AI
  • Q3. Project manager role at site
  • Ans. 

    The project manager plays a crucial role in overseeing and coordinating all aspects of a project at the site.

    • Responsible for planning, organizing, and directing project activities

    • Ensuring project goals are met within budget and timeline

    • Managing resources and stakeholders effectively

    • Problem-solving and decision-making skills are essential

    • Strong communication and leadership skills are necessary

  • Answered by AI
  • Q4. What is the overall cost in project in role of RCC
  • Ans. 

    The overall cost in a project in the role of RCC refers to the total expenses incurred for the Reinforced Cement Concrete work.

    • Calculate the cost of materials such as cement, aggregates, and reinforcement bars.

    • Consider the cost of labor for construction and installation of RCC components.

    • Include any additional costs such as equipment rental, transportation, and overhead expenses.

    • Factor in the cost of quality control me...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Mot Satisfaction job

I applied via Walk-in and was interviewed in Jul 2021. There were 5 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. All civil work related questions asked me.
  • Q2. All civil work, quality, safety specification , technical method.
  • Q3. Planning ( msp), work scheduling.project target capture planned.

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview very fine.our confidential very true. Work period satisfaction .
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

General aptitude of IQ

Round 2 - Technical 

(5 Questions)

  • Q1. QA and QC related
  • Q2. What is the criteria of acceptance of a concrete compressive strength
  • Ans. 

    Concrete compressive strength acceptance criteria is based on specified strength, testing frequency, and acceptance criteria.

    • Specified strength should be determined by the project requirements or standards.

    • Testing frequency should be established to ensure consistent quality control.

    • Acceptance criteria may include minimum strength requirements and statistical analysis.

    • Example: Specified strength of 28 MPa, testing every...

  • Answered by AI
  • Q3. What is project management
  • Ans. 

    Project management is the practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria.

    • Involves initiating, planning, executing, controlling, and closing a project

    • Focuses on achieving specific goals and meeting success criteria

    • Requires effective communication, coordination, and resource management

    • Utilizes tools and techniques such ...

  • Answered by AI
  • Q4. How to handle the contractor if he is not performing
  • Ans. 

    Address the issue directly with the contractor and set clear expectations for improvement.

    • Schedule a meeting with the contractor to discuss performance concerns

    • Clearly communicate the areas where the contractor is not meeting expectations

    • Set specific goals and deadlines for improvement

    • Offer support or resources to help the contractor improve

    • Consider consequences if performance does not improve, such as termination of c

  • Answered by AI
  • Q5. What do you mean By EPCcontractor
  • Ans. 

    EPC stands for Engineering, Procurement, and Construction. An EPC contractor is a company that provides all services required for a project from design to completion.

    • EPC stands for Engineering, Procurement, and Construction

    • EPC contractors are responsible for designing, procuring materials, and constructing projects

    • They are often hired for large-scale projects such as power plants, refineries, and infrastructure project

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It's good company to perform and show your ability
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Process of W. T. P
  • Ans. 

    The process of Water Treatment Plant (W.T.P) involves various stages to purify water for consumption.

    • 1. Coagulation: Adding chemicals to water to make particles clump together.

    • 2. Sedimentation: Allowing the clumped particles to settle at the bottom.

    • 3. Filtration: Passing water through filters to remove remaining particles.

    • 4. Disinfection: Adding chlorine or other chemicals to kill bacteria and viruses.

    • 5. Distribution: ...

  • Answered by AI
  • Q2. About safety precautions
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is SFRA test on power transformer?
  • Ans. 

    SFRA test is a diagnostic test performed on power transformers to assess their mechanical and electrical integrity.

    • SFRA stands for Sweep Frequency Response Analysis.

    • It is a non-intrusive test that measures the frequency response of a transformer to a swept sinusoidal input signal.

    • The test helps in identifying mechanical and electrical faults in the transformer windings.

    • SFRA test results can be compared with baseline me...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About the Projects
  • Q2. Project Planning

I applied via Company Website

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Hi this sudhir here a diploma holder in civil high rise building construction .I know the grade of concrete for building construction and finishing work knowledge also I have.

Round 3 - Technical 

(2 Questions)

  • Q1. Why we mix addmixture in concrete
  • Ans. 

    Admixtures are added to concrete to improve its properties and performance.

    • Admixtures enhance the workability and durability of concrete.

    • They can reduce the water content required for a given slump, making the concrete more cohesive.

    • Admixtures can accelerate or retard the setting time of concrete.

    • They improve the strength, durability, and resistance to chemical attack of concrete.

    • Examples of admixtures include water re...

  • Answered by AI
  • Q2. What is M25 cube strangth
  • Ans. 

    M25 cube strength refers to the compressive strength of concrete with a mix ratio of 1:1:2.

    • M25 cube strength is a measure of the ability of concrete to withstand compression.

    • It is denoted by the characteristic strength of a concrete cube tested at 28 days.

    • M25 grade concrete has a mix ratio of 1:1:2 (cement:sand:aggregate).

    • The cube strength of M25 concrete is typically around 25 MPa or 3625 psi.

    • It is important for struc...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work hard.complete. the projects as per company requirements and also give the positive input to the company .minimum loss for company complete the projects

I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.

Interview Questionnaire 

11 Questions

  • Q1. How many years of experience?
  • Q2. Total experience about Water Supply Project out of 13years
  • Q3. Do you work in Consultancy firm & ask about of company ?
  • Ans. Yes, like Wapcos Ltd, LN Malviya infra & and described my roll
  • Answered Anonymously
  • Q4. Asked about inspection that how to check quality of work ?
  • Ans. During inspection of work check quality of material like cement, sand, aggregate, bricks, tmt steel bar, etc. as per IS codes/spec. Quality in Struct
  • Answered Anonymously
  • Q5. If contractors not compliance spec. Then what do you want or take action against.
  • Ans. 

    Take appropriate action against contractors not complying with specifications.

    • Identify the specific non-compliance issues

    • Communicate the non-compliance to the contractors

    • Request corrective actions or modifications to meet the specifications

    • Monitor and document the progress of corrective actions

    • Consider penalties or contract termination if non-compliance persists

  • Answered by AI
  • Q6. Asked about NCR full form
  • Ans. Non conformance Report or Non conformity reports
  • Answered Anonymously
  • Q7. Asked describe about NCR
  • Ans. A non-conformance report, non-conformity report or NCR, is a design and construction-related document that addresses issues where there has been a deviation from the project specification or where work fails to meet agreed quality standards
  • Answered Anonymously
  • Q8. Asked about preparation of financial & physical progress
  • Ans. Financial progress is certified amount which is taken from certified RA Bills . Physical progress is in ongoing progress of the project work which is taken from certified RA Bills qty. & running or ongoing qty.
  • Answered Anonymously
  • Q9. What is your CURRENT CTC & expected? Asked by HR.
  • Ans. Replied my ctc & want 30%hike
  • Answered Anonymously
  • Q10. Asked about working location
  • Q11. Asked about corrent CTC & expected
  • Ans. CTC +30%hike.then finally I have selected.
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain about really experience which you have got & study about relevant IS codes & technical specifications.
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Say about your any great achievement during your previous constitution professional experience & what was affort made by you?
  • Q2. Why you think that you are suitable for this position?
  • Q3. Your further most carrier goals?
  • Ans. 

    My further most career goal is to become a director of project management.

    • To gain experience in managing large-scale projects

    • To develop leadership and communication skills

    • To build a strong network of industry professionals

    • To continuously learn and stay updated with industry trends

    • To achieve PMP certification

    • To work towards becoming a subject matter expert in project management

    • To mentor and train junior project managers

    • ...

  • Answered by AI

L&T Energy Hydrocarbon Interview FAQs

How to prepare for L&T Energy Hydrocarbon Assistant Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at L&T Energy Hydrocarbon. The most common topics and skills that interviewers at L&T Energy Hydrocarbon expect are Aerospace, Customer Complaints, ERP, Interpersonal Skills and Management Systems.

Tell us how to improve this page.

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 114 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
GAIL Interview Questions
4.5
 • 79 Interviews
TechnipFMC Interview Questions
4.0
 • 70 Interviews
Bechtel Interview Questions
4.0
 • 69 Interviews
View all
L&T Energy Hydrocarbon Assistant Project Manager Salary
based on 5 salaries
₹11 L/yr - ₹16.5 L/yr
50% more than the average Assistant Project Manager Salary in India
View more details

L&T Energy Hydrocarbon Assistant Project Manager Reviews and Ratings

based on 2 reviews

4.8/5

Rating in categories

4.0

Skill development

2.3

Work-life balance

3.7

Salary

3.9

Job security

3.0

Company culture

3.0

Promotions

3.9

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
841 salaries
unlock blur

₹5.1 L/yr - ₹19 L/yr

Manager
339 salaries
unlock blur

₹10.2 L/yr - ₹30 L/yr

Senior Engineer
256 salaries
unlock blur

₹3.5 L/yr - ₹13 L/yr

Piping Engineer
136 salaries
unlock blur

₹2.5 L/yr - ₹11 L/yr

Assistant General Manager
115 salaries
unlock blur

₹13.4 L/yr - ₹35 L/yr

Explore more salaries
Compare L&T Energy Hydrocarbon with

TechnipFMC

4.0
Compare

McDermott International

4.3
Compare

Saipem

4.1
Compare

Punj Lloyd

4.3
Compare
Did you find this page helpful?
Yes No
write
Share an Interview