I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.
Top trending discussions
I was interviewed in Dec 2024.
Lattice tower sub bracing design involves the structural support system for the tower.
Sub bracing design is crucial for maintaining the stability and strength of lattice towers.
The design should consider factors such as wind load, weight distribution, and material strength.
Examples of sub bracing design elements include diagonal bracing, horizontal bracing, and cross bracing.
Computer-aided design software is often used...
posted on 20 Feb 2024
I applied via campus placement at National Institute of Construction Management and Research, Pune and was interviewed before Feb 2023. There was 1 interview round.
There are various types of steel, each with different properties and uses.
Carbon Steel: Contains varying amounts of carbon, used in construction and manufacturing.
Alloy Steel: Contains additional elements like nickel or chromium for improved strength and durability.
Stainless Steel: Contains chromium for corrosion resistance, commonly used in kitchen appliances and medical instruments.
Tool Steel: Designed for making too...
I applied via Recruitment Consulltant and was interviewed before Jan 2022. There was 1 interview round.
The present salary is confidential and can be discussed during the negotiation process.
It is best to avoid disclosing your current salary during an interview.
Focus on discussing your skills, qualifications, and achievements instead.
If pressed for an answer, politely mention that you prefer to discuss salary expectations based on the responsibilities and requirements of the Assistant Manager role.
Provide examples of you...
To work in a metro city with an EPB machine, one must be familiar with its operation and maintenance.
Understand the operation of the EPB machine and follow safety protocols
Regularly maintain and inspect the EPB machine to ensure proper functioning
Coordinate with other team members and stakeholders for efficient project execution
Stay updated on the latest technology and advancements in EPB machines
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
Foundation work involves sinking wells. Challenges include tilt and shift of well. Rectification methods include bottom plugging and cassion methodology.
Foundation work involves sinking wells
Challenges faced include tilt and shift of well
Rectification methods include bottom plugging and cassion methodology
Bottom plugging involves filling the bottom of the well with concrete or other materials to stabilize it
Cassion met...
The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.
The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.
The raising main typically has gate valves, check valves, and air release valves.
The cooling lubrication system is responsib...
I am looking for new challenges and opportunities for growth.
Seeking new challenges and opportunities for growth
Wanting to expand my skill set and knowledge
Desire for a higher level of responsibility
Seeking a better work-life balance
Unsatisfied with the current work environment or company culture
I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.
I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.
I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...
posted on 10 Jan 2025
I applied via Naukri.com and was interviewed before Jan 2024. There was 1 interview round.
Developing an erection plan involves creating a detailed strategy for the construction process.
Identify project requirements and objectives
Create a timeline for completion
Allocate resources and manpower
Coordinate with subcontractors and suppliers
Ensure compliance with building codes and regulations
I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The productivity of plaster work and tiles is an important factor in construction projects.
Productivity in plaster work can be measured by the amount of plaster applied per hour or per day.
Factors that can affect plaster work productivity include the skill level of the workers, the quality of materials used, and the efficiency of the tools and equipment.
For example, experienced plasterers may be able to apply plaster m...
Centiler beam steel design is a method used to determine the appropriate size and shape of steel beams for structural support.
Centiler beam steel design involves calculating the load and span of the beam to determine the required section modulus.
The section modulus is then used to select the appropriate beam size from standard steel beam tables.
Factors such as the type of load, material properties, and safety factors a...
The density of steel is a measure of its mass per unit volume.
Density of steel is typically measured in units of grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).
The density of steel can vary depending on the specific type and composition of the steel.
For example, the density of carbon steel is around 7.85 g/cm³, while stainless steel has a density of about 8 g/cm³.
The density of steel is an impo...
AAC blocks are a type of lightweight concrete blocks used in construction. They come in various sizes and prices.
AAC blocks are made from autoclaved aerated concrete, which is a mixture of cement, lime, sand, water, and an expanding agent.
The size of AAC blocks can vary, but common sizes include 600mm x 200mm x 100mm and 600mm x 200mm x 150mm.
The prices of AAC blocks depend on factors such as the brand, quality, and qu...
based on 3 reviews
Rating in categories
Field Engineer
259
salaries
| ₹1.7 L/yr - ₹4.8 L/yr |
Civil Engineer
50
salaries
| ₹2.8 L/yr - ₹9 L/yr |
Assistant Resident Engineer
45
salaries
| ₹4.4 L/yr - ₹12 L/yr |
Resident Engineer
42
salaries
| ₹4.5 L/yr - ₹18.2 L/yr |
Deputy General Manager
39
salaries
| ₹12.1 L/yr - ₹28 L/yr |
AECOM
Jacobs Engineering Group
WSP
TCE