i
Egis India Consulting Engineers
Filter interviews by
I applied via Approached by Company and was interviewed before Nov 2021. There were 2 interview rounds.
I applied via Referral and was interviewed in Aug 2020. There were 3 interview rounds.
Top trending discussions
posted on 1 Jan 2025
The column vertical bar is placed inside the floor beam bar.
Column vertical bar is positioned inside the floor beam bar for structural support.
This configuration is commonly used in construction to enhance the strength and stability of the building.
Example: Reinforcing steel bars are placed inside the concrete floor beam to provide additional support.
posted on 2 Sep 2023
I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.
What is your past experience
I applied via Referral and was interviewed in Nov 2021. There were 5 interview rounds.
based on 7 reviews
Rating in categories
Field Engineer
259
salaries
| ₹1.7 L/yr - ₹4.8 L/yr |
Civil Engineer
50
salaries
| ₹2.8 L/yr - ₹9 L/yr |
Assistant Resident Engineer
45
salaries
| ₹4.4 L/yr - ₹12 L/yr |
Resident Engineer
42
salaries
| ₹4.5 L/yr - ₹18.2 L/yr |
Deputy General Manager
39
salaries
| ₹12.1 L/yr - ₹28 L/yr |
AECOM
Jacobs Engineering Group
WSP
TCE