Filter interviews by
I applied via Recruitment Consultant
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The question is about mechanical piping execution, equipment used in refinery sector, alignment and installation, pump operation, ASME standards, and fabrication and erection procedures.
Mechanical piping execution involves the installation and maintenance of piping systems in industrial settings.
Equipment used in refinery sector includes pumps, compressors, heat exchangers, and boilers.
Alignment and installation of pip...
Top trending discussions
I applied via Company Website
I applied via Walk-in and was interviewed in Jun 2023. There were 2 interview rounds.
The process of making a minor bridge involves planning, design, construction, and inspection.
1. Planning phase involves determining the location, size, and type of bridge needed.
2. Design phase includes creating detailed drawings and calculations for the bridge structure.
3. Construction phase involves building the foundation, supports, and deck of the bridge.
4. Inspection phase ensures the bridge meets safety and quali...
Piling point can be assured by conducting thorough soil investigation, using appropriate piling equipment, and monitoring the piling process.
Conduct soil investigation to determine soil conditions and suitability for piling.
Select appropriate piling equipment based on soil conditions and project requirements.
Monitor the piling process to ensure proper installation and alignment of piles.
Perform load tests on completed
The execution of an elevated viaduct involves various tasks such as pile foundation, pier construction, post-tensioning girders, and bridge structures.
Tasks include pile foundation construction for the viaduct, pier construction for support, post-tensioning of girders for strength, and bridge structure assembly.
Activities also involve conducting load tests, NDT tests, deflection tests, and steel reconciliation for qual...
I applied via Walk-in and was interviewed in Mar 2021. There were 5 interview rounds.
posted on 11 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
based on 1 interview
Interview experience
based on 30 reviews
Rating in categories
Assistant Manager
726
salaries
| ₹4.9 L/yr - ₹19 L/yr |
Manager
328
salaries
| ₹10.2 L/yr - ₹30 L/yr |
Senior Engineer
253
salaries
| ₹4.3 L/yr - ₹12 L/yr |
Piping Engineer
138
salaries
| ₹2.5 L/yr - ₹11 L/yr |
Assistant General Manager
118
salaries
| ₹17 L/yr - ₹35 L/yr |
AECOM
Apco Infratech
Saipem
Aarvee Associates