Filter interviews by
Loading according to UG-22 refers to the applied forces and moments on static equipment as per the ASME Boiler and Pressure Vessel Code.
UG-22 of the ASME Code provides guidelines for determining the loading conditions on static equipment such as pressure vessels and heat exchangers.
Loading includes both internal and external forces and moments that act on the equipment.
Internal loading includes pressure, temperature, a...
S&T heat exchangers include shell and tube, plate and frame, and spiral heat exchangers.
Shell and tube heat exchangers are the most common type.
Plate and frame heat exchangers are compact and efficient.
Spiral heat exchangers are used for high-viscosity fluids.
Other types include double pipe, finned tube, and air-cooled heat exchangers.
I applied via Recruitment Consulltant
Column deflection is the bending or deformation of a column under load. It can be avoided by using appropriate materials, increasing column size, and providing additional support.
Column deflection refers to the bending or deformation of a column when subjected to a load.
It is caused by the compressive forces acting on the column, which can lead to buckling or bending.
To avoid column deflection, engineers can use materi...
Top trending discussions
I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
posted on 11 Oct 2021
I applied via Company Website and was interviewed in Sep 2021. There was 1 interview round.
Assistant Manager
726
salaries
| ₹4.9 L/yr - ₹19 L/yr |
Manager
328
salaries
| ₹10.2 L/yr - ₹30 L/yr |
Senior Engineer
253
salaries
| ₹4.3 L/yr - ₹12 L/yr |
Piping Engineer
138
salaries
| ₹2.5 L/yr - ₹11 L/yr |
Assistant General Manager
118
salaries
| ₹17 L/yr - ₹35 L/yr |
AECOM
Apco Infratech
Saipem
Aarvee Associates