Filter interviews by
I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Sep 2021. There were 3 interview rounds.
I expect a competitive salary based on my experience and the responsibilities of the role.
Research the average salary range for Senior Billing Engineers in your area
Consider your years of experience and any specialized skills you bring to the role
Factor in the responsibilities and expectations outlined in the job description
Be prepared to negotiate and discuss benefits and other compensation packages
I worked as a Senior Billing Engineer at XYZ Company.
Managed billing processes and systems for multiple clients
Developed and implemented billing strategies to optimize revenue
Collaborated with cross-functional teams to resolve billing issues
Analyzed billing data and generated reports for management
Implemented automation solutions to streamline billing operations
I am an experienced Senior Billing Engineer with a strong background in billing systems and processes.
Over 10 years of experience in billing engineering
Expertise in designing and implementing billing systems
Proficient in analyzing and optimizing billing processes
Strong knowledge of billing software and tools
Proven track record of improving billing accuracy and efficiency
Excellent problem-solving and communication skill
The candidate should politely decline to provide their salary slip.
Politely decline to provide the salary slip
Explain that sharing salary information is confidential and against company policy
Offer to provide other relevant documents or information to demonstrate qualifications
I have worked on multiple government projects related to billing and invoicing.
Developed billing software for a government agency to automate their invoicing process
Managed billing and invoicing for a government healthcare program
Implemented cost tracking system for a government construction project
Collaborated with government officials to ensure compliance with regulations and policies
EPC pattern billing is a method of billing used in engineering, procurement, and construction projects. Item wise billing is a detailed billing method that lists each item separately.
EPC pattern billing is used in large-scale projects where the scope of work is extensive and complex.
It involves breaking down the project into various stages and billing for each stage separately.
Item wise billing is a detailed billing me...
MEP items billing refers to the process of invoicing for mechanical, electrical, and plumbing items used in construction projects.
MEP items include HVAC systems, electrical wiring, plumbing fixtures, and more
Billing is based on the quantity and cost of materials used, as well as labor and overhead expenses
Accurate tracking of MEP items is essential for proper billing and project management
Software such as Bluebeam Revu...
Finishing items billing refers to the process of invoicing for the final stages of a project or service.
Includes billing for any remaining work or materials needed to complete the project
May involve calculating and billing for change orders or additional work
Requires close collaboration with project managers and clients to ensure accuracy
Examples include billing for final touches on a construction project or last-minut...
I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.
There is no specific IS code for billing. Extra items, deduction rules for plaster, built-up area, and escalation vary based on project specifications.
There is no IS code for billing, as it varies based on project specifications
Extra items included in billing also vary based on project specifications
Deduction rules for plaster also vary based on project specifications
Built-up area is calculated based on the total area ...
Psp Projects interview questions for designations
Top trending discussions
posted on 6 Sep 2024
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
Rate analysis involves calculating the cost of different items in a project.
Rate analysis involves breaking down the cost of each item in a project
It helps in determining the cost of materials, labor, and equipment for each item
Rate analysis is essential for accurate budgeting and cost estimation in construction projects
Escalation is the process of increasing the level of urgency or severity of a situation.
Escalation is commonly used in project management to address issues that require immediate attention.
It involves raising a concern to higher levels of authority when it cannot be resolved at the current level.
Escalation can also refer to increasing the intensity of a conflict or dispute.
Examples include escalating a customer complai...
Types of indices include price index, quantity index, and composite index.
Price index measures changes in prices over time.
Quantity index measures changes in quantities of goods or services.
Composite index combines price and quantity indices to provide a comprehensive measure.
Examples: Consumer Price Index (CPI), Producer Price Index (PPI), and Dow Jones Industrial Average.
Wastage can be controlled by proper planning, monitoring, training, and implementing efficient processes.
Implementing proper inventory management to avoid overstocking and expiration of materials
Regular monitoring of material usage and identifying areas of high wastage
Training staff on proper handling and storage of materials to prevent damage and spoilage
Implementing lean construction practices to minimize material wa...
I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.
LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.
LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.
JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...
IS 1200
I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.
The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.
Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process
Discussed the importance of reconciliation in ensuring accurate billing and payment
Described the process of rate analysis and how ...
based on 1 interview
Interview experience
based on 12 reviews
Rating in categories
Assistant Engineer
145
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Senior Engineer
127
salaries
| ₹4 L/yr - ₹10 L/yr |
Junior Engineer
82
salaries
| ₹1 L/yr - ₹4.5 L/yr |
Assistant Engineer - Civil
48
salaries
| ₹2.6 L/yr - ₹5.4 L/yr |
Store Executive
47
salaries
| ₹2 L/yr - ₹4.5 L/yr |
Ahluwalia Contracts India
Nagarjuna Construction Company
Simplex Infrastructures
Larsen & Toubro Limited