Upload Button Icon Add office photos

Psp Projects

Compare button icon Compare button icon Compare

Filter interviews by

Psp Projects Senior Billing Engineer Interview Questions, Process, and Tips

Updated 18 Dec 2024

Top Psp Projects Senior Billing Engineer Interview Questions and Answers

  • Q1. Tell me About EPC pattern billing, item wise Billing etc.
  • Q2. What's the is code for Billing, What's the extra items, what's the deduction rules of plaster as per is code, What's the built up area, what's the escalation etc
  • Q3. Tell me about finishing items billing

Psp Projects Senior Billing Engineer Interview Experiences

4 interviews found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How to prepare bbs
  • Q2. How much amount billing you have completed.

I applied via Walk-in and was interviewed in Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. What are your salary expectations?
  • Ans. 

    I expect a competitive salary based on my experience and the responsibilities of the role.

    • Research the average salary range for Senior Billing Engineers in your area

    • Consider your years of experience and any specialized skills you bring to the role

    • Factor in the responsibilities and expectations outlined in the job description

    • Be prepared to negotiate and discuss benefits and other compensation packages

  • Answered by AI
  • Q2. Share details of your previous job.
  • Ans. 

    I worked as a Senior Billing Engineer at XYZ Company.

    • Managed billing processes and systems for multiple clients

    • Developed and implemented billing strategies to optimize revenue

    • Collaborated with cross-functional teams to resolve billing issues

    • Analyzed billing data and generated reports for management

    • Implemented automation solutions to streamline billing operations

  • Answered by AI
  • Q3. Tell me about yourself.
  • Ans. 

    I am an experienced Senior Billing Engineer with a strong background in billing systems and processes.

    • Over 10 years of experience in billing engineering

    • Expertise in designing and implementing billing systems

    • Proficient in analyzing and optimizing billing processes

    • Strong knowledge of billing software and tools

    • Proven track record of improving billing accuracy and efficiency

    • Excellent problem-solving and communication skill

  • Answered by AI
  • Q4. Send me your last six month salary slip
  • Ans. 

    The candidate should politely decline to provide their salary slip.

    • Politely decline to provide the salary slip

    • Explain that sharing salary information is confidential and against company policy

    • Offer to provide other relevant documents or information to demonstrate qualifications

  • Answered by AI
  • Q5. Send me Company offer latter
Round 3 - Technical 

(6 Questions)

  • Q1. Rate analysis, reconciliation of steel & cement , Technical questions, present designation, about experience etc.
  • Q2. Your govt project experience
  • Ans. 

    I have worked on multiple government projects related to billing and invoicing.

    • Developed billing software for a government agency to automate their invoicing process

    • Managed billing and invoicing for a government healthcare program

    • Implemented cost tracking system for a government construction project

    • Collaborated with government officials to ensure compliance with regulations and policies

  • Answered by AI
  • Q3. Tell me About EPC pattern billing, item wise Billing etc.
  • Ans. 

    EPC pattern billing is a method of billing used in engineering, procurement, and construction projects. Item wise billing is a detailed billing method that lists each item separately.

    • EPC pattern billing is used in large-scale projects where the scope of work is extensive and complex.

    • It involves breaking down the project into various stages and billing for each stage separately.

    • Item wise billing is a detailed billing me...

  • Answered by AI
  • Q4. Did you MEP & Finishing Billing
  • Q5. Tell me about MEP items billing
  • Ans. 

    MEP items billing refers to the process of invoicing for mechanical, electrical, and plumbing items used in construction projects.

    • MEP items include HVAC systems, electrical wiring, plumbing fixtures, and more

    • Billing is based on the quantity and cost of materials used, as well as labor and overhead expenses

    • Accurate tracking of MEP items is essential for proper billing and project management

    • Software such as Bluebeam Revu...

  • Answered by AI
  • Q6. Tell me about finishing items billing
  • Ans. 

    Finishing items billing refers to the process of invoicing for the final stages of a project or service.

    • Includes billing for any remaining work or materials needed to complete the project

    • May involve calculating and billing for change orders or additional work

    • Requires close collaboration with project managers and clients to ensure accuracy

    • Examples include billing for final touches on a construction project or last-minut...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Psp Projects Senior Billing Engineer interview:
  • Civil Engineering
  • Billing
Interview preparation tips for other job seekers - Firstly thanks Nokari.Com for give me this opportunity.
Becouse, I found this offer by nokri.com
PSP projects limited is a best company.
Firstly interview time , keep your self in confidence.
My interview went well.
He asked me many questions
When ,I couldn't answer some questions than I said sorry.

Senior Billing Engineer Interview Questions Asked at Other Companies

Q1. Are you familiar with Rate Analysis? Prepare a rate analysis for ... read more
Q2. Tell me About EPC pattern billing, item wise Billing etc.
Q3. What's the is code for Billing, What's the extra items, what's th ... read more
Q4. What do you mean by basic rate variation?
Q5. Difference between basic rate variation and rate escalation?

I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Working with IS specification and knowledge about project
  • Q2. Knowledge of measurement
Round 3 - HR 

(1 Question)

  • Q1. Salary and post releted

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare as described your job profile required to company.
There is more opportunities than you think.

I applied via Naukri.com and was interviewed in Jan 2022. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. What's ur current job and salary, ur expectations and about location for the job etc.
Round 2 - Technical 

(1 Question)

  • Q1. What's the is code for Billing, What's the extra items, what's the deduction rules of plaster as per is code, What's the built up area, what's the escalation etc
  • Ans. 

    There is no specific IS code for billing. Extra items, deduction rules for plaster, built-up area, and escalation vary based on project specifications.

    • There is no IS code for billing, as it varies based on project specifications

    • Extra items included in billing also vary based on project specifications

    • Deduction rules for plaster also vary based on project specifications

    • Built-up area is calculated based on the total area ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Thanks to Naukri.com for helping me to find the suitable job in a well reputed company

Psp Projects interview questions for designations

 Billing Engineer

 (2)

 Assistant Billing Engineer

 (1)

 Senior Civil Engineer

 (1)

 Senior MEP Engineer

 (1)

 Senior Surveyor

 (1)

 Construction Engineer

 (1)

 Civil Engineer

 (1)

 EHS Engineer

 (1)

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

About site experience

Round 2 - Technical 

(1 Question)

  • Q1. Site execution technical

I applied via Referral and was interviewed in Dec 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Cube Compressive achieving Percentage time periods?
  • Ans. 

    Cube compressive achieving percentage time periods

    • The question is asking about the percentage of time periods in which cube compressive strength is achieved

    • Cube compressive strength refers to the ability of a cube-shaped material to withstand compression

    • The answer may involve calculating the percentage of time periods in which the cube meets the required compressive strength

    • Examples of data points needed: time periods,

  • Answered by AI
  • Q2. M20 grade and M means and 20 means and unit
  • Q3. 1:1.5:3 ,M-Mix,20 -Compresive strength,N/mm²

Interview Preparation Tips

Interview preparation tips for other job seekers - Be face Bolt don't jerk anyone becoz they also Human
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Control valves on-off valves
Round 3 - Technical 

(1 Question)

  • Q1. PSV pressure regulators

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical study is important . Basics to be perfect
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Ammonia process
Round 3 - HR 

(2 Questions)

  • Q1. How much salary expectations?
  • Q2. Salary Negotiable

Interview Preparation Tips

Interview preparation tips for other job seekers - All the best
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. PAST EXPERIENCE QUESTIONS

Interview Preparation Tips

Topics to prepare for L&T Energy Hydrocarbon Senior Engineer interview:
  • Piping
Interview preparation tips for other job seekers - GET DETAILS OF CODES AND STANDARDS YOU USED IN WORK

Psp Projects Interview FAQs

How many rounds are there in Psp Projects Senior Billing Engineer interview?
Psp Projects interview process usually has 2-3 rounds. The most common rounds in the Psp Projects interview process are Technical, Resume Shortlist and HR.
How to prepare for Psp Projects Senior Billing Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Psp Projects. The most common topics and skills that interviewers at Psp Projects expect are Billing, Billing Engineering, Civil, Contractor Billing and Costing.
What are the top questions asked in Psp Projects Senior Billing Engineer interview?

Some of the top questions asked at the Psp Projects Senior Billing Engineer interview -

  1. Tell me About EPC pattern billing, item wise Billing e...read more
  2. What's the is code for Billing, What's the extra items, what's the deduction ru...read more
  3. Tell me about finishing items bill...read more

Tell us how to improve this page.

Psp Projects Senior Billing Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 117 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 60 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
View all
Psp Projects Senior Billing Engineer Salary
based on 36 salaries
₹4.8 L/yr - ₹9.6 L/yr
At par with the average Senior Billing Engineer Salary in India
View more details

Psp Projects Senior Billing Engineer Reviews and Ratings

based on 15 reviews

4.0/5

Rating in categories

3.7

Skill development

3.6

Work-life balance

3.3

Salary

3.2

Job security

3.6

Company culture

3.1

Promotions

3.8

Work satisfaction

Explore 15 Reviews and Ratings
Assistant Engineer
151 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Senior Engineer
137 salaries
unlock blur

₹3 L/yr - ₹10 L/yr

Junior Engineer
81 salaries
unlock blur

₹1 L/yr - ₹4.5 L/yr

Assistant Engineer - Civil
50 salaries
unlock blur

₹2.6 L/yr - ₹5.6 L/yr

Senior Civil Engineer
50 salaries
unlock blur

₹4 L/yr - ₹8.5 L/yr

Explore more salaries
Compare Psp Projects with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview