Q1. If you have to prepare a bill of a brick wall which was previously done by a portion and you have to prepare the final bill. wat procedure you will to take.
To prepare the final bill for a brick wall previously done by a portion, calculate the total quantity of bricks used and apply the appropriate rates.
Calculate the total quantity of bricks used in the wall
Determine the rate per brick based on the type and quality of bricks used
Multiply the total quantity of bricks by the rate per brick to get the total cost
Include any additional costs such as labor, transportation, and overhead expenses in the final bill
Present the final bill ...read more
Q2. Measurements done on site
Measurements on site are crucial for accurate billing and construction progress tracking.
Measurements include dimensions of structures, quantities of materials used, and levels of work completed.
Tools such as tape measures, laser levels, and total stations are commonly used for accurate measurements.
Accurate measurements help in calculating quantities for billing purposes and tracking progress against project timelines.
Q3. Experience in field
I have 3 years of experience working in the field as a Billing cum Site Engineer.
Managed billing processes for construction projects
Coordinated with site engineers and contractors
Ensured timely completion of projects within budget
Handled documentation and reporting tasks
Resolved any billing discrepancies or issues
Q4. Measurements done
Measurements are typically done to ensure accuracy and quality in construction projects.
Measurements are taken using various tools such as tape measures, laser levels, and surveying equipment.
Measurements are crucial for ensuring that structures are built according to specifications and plans.
Regular measurements are done to monitor progress and ensure that work is being done correctly.
Examples of measurements include checking dimensions of walls, levels of floors, and distan...read more
Q5. AMOUNT OF CONCRETE PER SQM
The amount of concrete per square meter varies depending on the project requirements and specifications.
The amount of concrete per square meter is determined by the thickness of the concrete slab.
For example, a 100mm thick concrete slab would require approximately 0.1 cubic meters of concrete per square meter.
The amount of concrete also depends on the reinforcement used, such as steel bars or mesh.
Other factors that can affect the amount of concrete per square meter include t...read more
Site & Billing Engineer Jobs
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month