Site & Billing Engineer

Site & Billing Engineer Interview Questions and Answers

Updated 9 Oct 2024

Popular Companies

search-icon

Q1. If you have to prepare a bill of a brick wall which was previously done by a portion and you have to prepare the final bill. wat procedure you will to take.

Ans.

To prepare the final bill for a brick wall previously done by a portion, calculate the total quantity of bricks used and apply the appropriate rates.

  • Calculate the total quantity of bricks used in the wall

  • Determine the rate per brick based on the type and quality of bricks used

  • Multiply the total quantity of bricks by the rate per brick to get the total cost

  • Include any additional costs such as labor, transportation, and overhead expenses in the final bill

  • Present the final bill ...read more

Q2. Measurements done on site

Ans.

Measurements on site are crucial for accurate billing and construction progress tracking.

  • Measurements include dimensions of structures, quantities of materials used, and levels of work completed.

  • Tools such as tape measures, laser levels, and total stations are commonly used for accurate measurements.

  • Accurate measurements help in calculating quantities for billing purposes and tracking progress against project timelines.

Q3. Experience in field

Ans.

I have 3 years of experience working in the field as a Billing cum Site Engineer.

  • Managed billing processes for construction projects

  • Coordinated with site engineers and contractors

  • Ensured timely completion of projects within budget

  • Handled documentation and reporting tasks

  • Resolved any billing discrepancies or issues

Q4. Measurements done

Ans.

Measurements are typically done to ensure accuracy and quality in construction projects.

  • Measurements are taken using various tools such as tape measures, laser levels, and surveying equipment.

  • Measurements are crucial for ensuring that structures are built according to specifications and plans.

  • Regular measurements are done to monitor progress and ensure that work is being done correctly.

  • Examples of measurements include checking dimensions of walls, levels of floors, and distan...read more

Are these interview questions helpful?

Q5. AMOUNT OF CONCRETE PER SQM

Ans.

The amount of concrete per square meter varies depending on the project requirements and specifications.

  • The amount of concrete per square meter is determined by the thickness of the concrete slab.

  • For example, a 100mm thick concrete slab would require approximately 0.1 cubic meters of concrete per square meter.

  • The amount of concrete also depends on the reinforcement used, such as steel bars or mesh.

  • Other factors that can affect the amount of concrete per square meter include t...read more

Site & Billing Engineer Jobs

Site Cum Billing Engineer 3-8 years
Scenic Developers
3.6
₹ 3 L/yr - ₹ 7 L/yr
Gurgaon / Gurugram
Site Billing Engineer 4-9 years
RC Project Consultancy
0.0
Ahmedabad
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Site & Billing Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter