Q1. 1. Which IS codes followed for Mode of Measurement ? 2. What is BOQ ? 3. What is Escalation ? 4. What is Extra Item ? 5. Document submitted with Client Bill ? 6. BBS Calculaion of a Stair Case.

Ans.

Answers to questions related to Estimation & Billing Engineer

  • 1. IS codes followed for Mode of Measurement are IS 1200, IS 456, IS 7272, etc.

  • 2. BOQ stands for Bill of Quantities, which is a document that lists all the items and quantities required for a construction project.

  • 3. Escalation refers to the increase in the cost of materials, labor, or other factors over time. It is usually accounted for in contracts to ensure fair compensation.

  • 4. An extra item is an additional work ...read more

Q2. 2. How to measure centering and shuttering after 3.5m slab level?

Ans.

Centering and shuttering can be measured after 3.5m slab level using various methods.

  • Use measuring tape to measure the distance between the slab level and the centering or shuttering

  • Check the alignment and levelness of the centering and shuttering using a spirit level

  • Inspect the quality of the materials used for centering and shuttering

  • Ensure proper bracing and support for the centering and shuttering

  • Consider any additional factors such as load-bearing capacity and safety mea...read more

Q3. What are basic modes of measurement.

Ans.

The basic modes of measurement are linear, area, volume, and count.

  • Linear measurement involves measuring the length of an object or distance between two points.

  • Area measurement involves measuring the surface area of an object or the space enclosed within a boundary.

  • Volume measurement involves measuring the amount of space occupied by an object or substance.

  • Count measurement involves quantifying the number of items or entities present.

Q4. 1. Which code follows for measurements as per cpwd specifications.?

Ans.

The code that follows for measurements as per CPWD specifications is CPWD-6.

  • CPWD-6 is the code used for measurements as per CPWD (Central Public Works Department) specifications.

  • It provides guidelines for measurement and billing of various construction activities.

  • CPWD-6 includes detailed instructions on how to measure and quantify different items of work in construction projects.

  • It helps in ensuring uniformity and standardization in measurement and billing processes.

  • For examp...read more

Are these interview questions helpful?

Q5. As per IS codes, current market rates.

Ans.

IS codes and current market rates are used for estimation and billing in construction projects.

  • IS codes provide guidelines for construction materials and methods.

  • Current market rates are used to estimate the cost of materials and labor.

  • Estimation and billing engineers use these factors to create accurate project budgets.

  • For example, IS codes specify the strength of concrete required for a particular structure, while current market rates help determine the cost of steel reinfo...read more

Q6. Bar bending shedule of any part of building

Ans.

A bar bending schedule is a document that provides details of reinforcement steel bars used in a building's structural elements.

  • Bar bending schedule is prepared by a structural engineer or a quantity surveyor.

  • It includes information about the type, size, quantity, and shape of reinforcement bars.

  • The schedule helps in estimating the required amount of steel and planning the construction process.

  • It ensures proper placement and bending of reinforcement bars as per design specifi...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. What is Rate analysis??

Ans.

Rate analysis is the process of determining the rates of various items of work involved in a construction project.

  • It involves the calculation of the cost of materials, labor, and equipment required for a particular task.

  • It helps in estimating the total cost of the project and preparing a budget.

  • It is essential for preparing accurate bills of quantities and invoices.

  • Example: Rate analysis for the construction of a building involves determining the cost of materials such as cem...read more

Q8. 3. Unit of granite measurements

Ans.

The unit of granite measurements is typically square feet or square meters.

  • The most common unit of measurement for granite is square feet.

  • In some countries, square meters may be used as the unit of measurement.

  • Granite slabs are often sold by the square foot or square meter.

  • When estimating or billing for granite, it is important to accurately measure the area to determine the quantity needed.

Estimation & Billing Engineer Jobs

Billing and Estimation Engineer (Civil)- 3-7 years
Gensys Technologies
3.0
₹ 3 L/yr - ₹ 7 L/yr
Pune
Estimation & Billing Engineer 3-8 years
Kotibhaskar Infrastructures
3.3
Pune
Required Senior & Junior Estimation & Billing Engineer 5-10 years
Rainbow Housing
2.9
₹ 5 L/yr - ₹ 11 L/yr
Pimpri-Chinchwad

Q9. Can you prepared bill?

Ans.

Yes, I can prepare bills accurately and efficiently.

  • I have experience in using billing software such as QuickBooks and FreshBooks.

  • I am familiar with creating invoices, purchase orders, and receipts.

  • I ensure that all billable items are included and that the calculations are correct.

  • I am also able to communicate effectively with clients regarding billing inquiries or discrepancies.

Q10. Type of piles in construction work

Ans.

Different types of piles used in construction work include driven piles, bored piles, and screw piles.

  • Driven piles are installed by driving them into the ground using impact hammers or vibratory hammers.

  • Bored piles are created by drilling a hole into the ground and then filling it with concrete.

  • Screw piles are twisted into the ground using machinery, providing a quick and efficient foundation solution.

  • Other types of piles include sheet piles, helical piles, and micropiles.

Q11. quantity calculation from drawing

Ans.

Quantity calculation from drawing involves measuring dimensions and quantities of materials shown in the drawing.

  • Identify the dimensions of each component shown in the drawing

  • Calculate the area, volume, or length of each component based on the dimensions

  • Multiply the calculated quantities by the number of components shown in the drawing

  • Sum up all the calculated quantities to get the total quantity needed

Q12. Conc quantity in pile

Ans.

Conc quantity in pile refers to the concrete quantity required to fill up a pile foundation.

  • Conc quantity in pile is calculated based on the dimensions of the pile and the required strength of the concrete.

  • Factors such as pile diameter, length, and reinforcement details are considered in determining the concrete quantity.

  • For example, a 1m diameter pile with a length of 10m and requiring a concrete strength of 25MPa would have a specific concrete quantity.

  • The calculation of co...read more

Q13. Bbs of shore pile

Ans.

Bbs of shore pile refers to the bar bending schedule of a pile used for shore protection.

  • Bbs includes details of reinforcement bars like diameter, spacing, length, etc.

  • It helps in estimating the quantity of steel required for the pile construction.

  • Example: Bbs for a shore pile may include details of vertical and horizontal reinforcement bars.

  • It is essential for accurate cost estimation and billing of the project.

Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Estimation & Billing Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter