Upload Button Icon Add office photos

Filter interviews by

Sj Contracts Interview Questions, Process, and Tips

Updated 30 Jun 2024

Top Sj Contracts Interview Questions and Answers

View all 14 questions

Sj Contracts Interview Experiences

Popular Designations

18 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What is Rolling margin.
  • Ans. 

    Rolling margin is a financial metric used to measure the profitability of a company over a specific period of time.

    • Rolling margin is calculated by dividing the rolling gross profit by the rolling revenue and expressing the result as a percentage.

    • It helps in analyzing the trend of profitability over time by considering a moving average of financial performance.

    • For example, a company may calculate its rolling margin for ...

  • Answered by AI
  • Q2. Rate analysis for steel, plaster
  • Ans. 

    Rate analysis involves calculating the cost of materials and labor for a specific project.

    • Rate analysis for steel involves calculating the cost of steel per unit weight or volume.

    • Rate analysis for plaster involves calculating the cost of plaster per unit area or volume.

    • Factors such as transportation costs, labor costs, and wastage should be considered in rate analysis.

    • Rate analysis helps in estimating the total cost of

  • Answered by AI
  • Q3. Quantity required for plaster.
  • Ans. 

    The quantity required for plaster is calculated based on the surface area to be covered and the thickness of the plaster.

    • Calculate the surface area to be covered by measuring the length and height of the walls or ceiling.

    • Determine the thickness of the plaster required, typically ranging from 10mm to 20mm.

    • Multiply the surface area by the thickness to get the volume of plaster needed.

    • Consider wastage and additional mater...

  • Answered by AI
  • Q4. Shuttering deductions.

Interview Preparation Tips

Topics to prepare for Sj Contracts Senior Billing Engineer interview:
  • Bbs
  • Qty Estimate
  • Shuttering
  • Contract Manual

Senior Billing Engineer Interview Questions asked at other Companies

Q1. Are you familiar with Rate Analysis? Prepare a rate analysis for blockwork
View answer (2)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. What is resource planning & logistic planning? And how to prepare it.
  • Ans. 

    Resource planning involves allocating resources efficiently for project execution, while logistic planning focuses on coordinating the movement of resources and materials.

    • Resource planning involves identifying and allocating resources such as manpower, equipment, materials, and budget for project activities.

    • Logistic planning involves coordinating the movement of resources and materials to ensure timely delivery and eff...

  • Answered by AI
  • Q2. Types of drawings used in construction.
  • Ans. 

    Types of drawings used in construction include architectural drawings, structural drawings, mechanical drawings, electrical drawings, and plumbing drawings.

    • Architectural drawings: show the layout, design, and details of a building's structure.

    • Structural drawings: focus on the framework and support of the building.

    • Mechanical drawings: depict HVAC systems, ductwork, and equipment layouts.

    • Electrical drawings: illustrate t...

  • Answered by AI
  • Q3. What is WBS explain in details.
  • Ans. 

    WBS stands for Work Breakdown Structure, a hierarchical decomposition of the total scope of work to be carried out by the project team.

    • WBS breaks down the project deliverables into smaller, more manageable components.

    • It helps in organizing and defining the total scope of the project.

    • Each level of the WBS represents a different level of detail.

    • It is a visual representation of the project scope.

    • Example: WBS for building ...

  • Answered by AI
  • Q4. What data required to prepare master schedule?
  • Ans. 

    Various data points are required to prepare a master schedule.

    • Project scope and deliverables

    • Resource availability and allocation

    • Dependencies between tasks

    • Duration estimates for each task

    • Constraints and milestones

    • Historical data from similar projects

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sj Contracts Planning Engineer interview:
  • Project Scheduling
Interview preparation tips for other job seekers - Most focus on scheduling & how to prepare it.

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)

HR Executive Interview Questions & Answers

user image Anonymous

posted on 3 Jun 2024

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. What is your Job responsibility?

Interview Preparation Tips

Interview preparation tips for other job seekers - Work experience. Confidence level.

HR Executive Interview Questions asked at other Companies

Q1. What do you know about Labor Law
View answer (6)
Interview experience
2
Poor
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Refresh and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(6 Questions)

  • Q1. Cube size150mm150mm150mm
  • Ans. 

    5day & 7day &28 day test

  • Answered Anonymously
  • Q2. RCC for concrete M40 PT
  • Ans. 

    RCC for concrete M40 PT is a reinforced concrete structure with a compressive strength of 40 MPa and post-tensioning reinforcement.

    • RCC stands for Reinforced Cement Concrete.

    • M40 is the grade of concrete with a compressive strength of 40 MPa.

    • PT stands for Post-Tensioning reinforcement.

    • Post-tensioning is a technique of reinforcing concrete using high-strength steel strands or bars.

    • It is used to increase the strength and d...

  • Answered by AI
  • Q3. Column &beam &slap for c
  • Q4. Civil engineer site work
  • Q5. Engineer for strict action
  • Q6. Morning time to explore for site
Round 3 - Technical 

(1 Question)

  • Q1. Engineer questions work

Interview Preparation Tips

Topics to prepare for Sj Contracts Junior Engineer Civil interview:
  • Civil Works
Interview preparation tips for other job seekers - For Reference Mr Ravi kate site incharge for bavdhan site

Junior Engineer Civil Interview Questions asked at other Companies

Q1. What is your name Where are you from Ratio of M 20 grade concrete. How to find the weight of steel bar used in reinforcement ? How to measurements the concrete volume? Standard size of brick. What is volume of cement bag 50 kg? How to calcu... read more
View answer (2)

Sj Contracts interview questions for popular designations

 Planning Engineer

 (4)

 Billing Engineer

 (3)

 Assistant Store Manager

 (1)

 EHS Supervisor

 (1)

 Estimation & Billing Engineer

 (1)

 HR Executive

 (1)

 Junior Engineer

 (1)

 Junior Engineer Civil

 (1)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All about planning requisites
Round 3 - HR 

(1 Question)

  • Q1. Relocation, last job

Interview Preparation Tips

Interview preparation tips for other job seekers - It is a demanding company, you need to be very active of you are joining this company.

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)

Billing Engineer Interview Questions & Answers

user image Ajinkya Avinash Nagdeote

posted on 28 Feb 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Focus on site knowledge
Round 2 - HR 

(1 Question)

  • Q1. They try to keep in budget as low as possible

Billing Engineer Interview Questions asked at other Companies

Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.
View answer (9)

Jobs at Sj Contracts

View all

I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Question asked on deduction for , shuttering,plaster,
  • Q2. BBS questions , bend diductions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for IS1200 questions. Also bbs questions and also shuttering work,

Billing Engineer Interview Questions asked at other Companies

Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.
View answer (9)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Concrete temperature
  • Q2. Mix design ratio
  • Ans. 

    Mix design ratio refers to the proportion of different materials used in a concrete mix.

    • Mix design ratio is crucial for achieving desired strength and durability of concrete.

    • Common ratios include 1:2:4 for M20 grade concrete, where 1 part cement is mixed with 2 parts sand and 4 parts aggregate.

    • Water-cement ratio is also an important factor in mix design, affecting workability and strength of concrete.

  • Answered by AI
  • Q3. Tests on concrete
Round 3 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Salary expectation

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (8)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General questions, education, qualification and skills
Round 3 - Technical 

(1 Question)

  • Q1. Detailed interview..all about msp and planning.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared as the person taking interview can be someone with good experience or else 60% of the time it's just plain easy.

Planning Engineer Interview Questions asked at other Companies

Q1. Prepare a small given example site schedule with sequencing and duration determine project duration in MSP/on Paper What is critical path method? How will you identify while making on paper rather than MSP? How would you track schedule-Proc... read more
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Jun 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Tell us about Experience ?
  • Q2. What is your core of expertise

Estimation & Billing Engineer Interview Questions asked at other Companies

Q1. 1. Which IS codes followed for Mode of Measurement ? 2. What is BOQ ? 3. What is Escalation ? 4. What is Extra Item ? 5. Document submitted with Client Bill ? 6. BBS Calculaion of a Stair Case.
View answer (3)

Sj Contracts Interview FAQs

How many rounds are there in Sj Contracts interview?
Sj Contracts interview process usually has 2-3 rounds. The most common rounds in the Sj Contracts interview process are Technical, Resume Shortlist and HR.
How to prepare for Sj Contracts interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Sj Contracts. The most common topics and skills that interviewers at Sj Contracts expect are MSP, Civil Engineering, EHS, Planning and Authoring.
What are the top questions asked in Sj Contracts interview?

Some of the top questions asked at the Sj Contracts interview -

  1. What is resource planning & logistic planning? And how to prepare ...read more
  2. What data required to prepare master schedu...read more
  3. Have you worked with Mivan shutter...read more
How long is the Sj Contracts interview process?

The duration of Sj Contracts interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Sj Contracts Interview Process

based on 29 interviews

Interview experience

3.7
  
Good
View more

Interview Questions from Similar Companies

Apco Infratech Interview Questions
3.7
 • 112 Interviews
AECOM Interview Questions
4.2
 • 111 Interviews
Bechtel Interview Questions
4.0
 • 67 Interviews
Samsung E&A Interview Questions
4.1
 • 60 Interviews
Wood Group Interview Questions
3.7
 • 57 Interviews
View all

Sj Contracts Reviews and Ratings

based on 259 reviews

4.3/5

Rating in categories

4.3

Skill development

3.8

Work-life balance

4.2

Salary

4.4

Job security

4.3

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 259 Reviews and Ratings
Assistant Manager (Talent Acquisition)

Pune

6-10 Yrs

Not Disclosed

EHS Supervisor

Pune

1-6 Yrs

Not Disclosed

Officer/ Sr. Officer- EHS

Pune

5-7 Yrs

Not Disclosed

Explore more jobs
Billing Engineer
74 salaries
unlock blur

₹2.8 L/yr - ₹7.8 L/yr

Senior Engineer
50 salaries
unlock blur

₹4.5 L/yr - ₹10.6 L/yr

Junior Engineer
50 salaries
unlock blur

₹1.5 L/yr - ₹5 L/yr

Planning Engineer
45 salaries
unlock blur

₹3.7 L/yr - ₹7.5 L/yr

Site Engineer
41 salaries
unlock blur

₹3.2 L/yr - ₹8 L/yr

Explore more salaries
Compare Sj Contracts with

L&T Energy Hydrocarbon

3.8
Compare

AECOM

4.2
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview