I applied via Company Website and was interviewed before May 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Jul 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
Current CTC is $60,000 and Expected CTC is $70,000.
Current CTC is the current annual salary of the candidate.
Expected CTC is the annual salary the candidate is expecting from the new job.
It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.
For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.
Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.
I prepare detailed estimates based on quantities of materials and labor required for a project.
I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.
I use software tools...
Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.
Check quantities mentioned in the bill against the actual work done on site.
Verify rates and unit prices for each item in the bill with the contract agreement.
Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.
Conduct site measurements to confirm the work completed matches the
Evidential documents required for scrutinizing the RA Bill
Contract documents
Measurement sheets
Bills of quantities
Variation orders
Payment certificates
Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.
Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.
Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...
Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.
Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.
Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.
Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...
I applied via Referral and was interviewed in Aug 2022. There were 3 interview rounds.
Question related previous company work
Designing beams and columns involves determining the size, material, and layout to support the required loads.
Consider the type of structure and the loads it will bear
Calculate the required dimensions and reinforcement based on structural analysis
Select appropriate materials such as steel or concrete
Ensure proper connections and detailing for stability and safety
Limit state of serviceability refers to the condition where a structure is still functioning properly without any excessive deflection or deformation.
Limit state of serviceability ensures that a structure remains usable and safe for occupants.
It involves checking factors like deflection, vibration, cracking, and durability.
For example, a bridge should not deflect excessively under the weight of traffic to maintain serv...
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Conductors are selected based on factors like material, size, insulation, and current carrying capacity.
Consider the material of the conductor (e.g. copper, aluminum)
Determine the size of the conductor based on the current it will carry
Choose the appropriate insulation for the conductor based on the environment it will be used in
Ensure the conductor has the required current carrying capacity for the application
I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.
Hazards of work at height include falls, falling objects, unstable surfaces, and weather conditions.
Falls from height can result in serious injuries or fatalities
Objects falling from height can cause harm to workers below
Unstable surfaces such as ladders or scaffolding can lead to slips or falls
Weather conditions like wind or rain can increase the risk of accidents
Improper use of safety equipment can also contribute to
Hazard Control Hierarchy is a system used to prioritize and implement control measures to reduce or eliminate workplace hazards.
Hierarchy of controls ranks control measures from most effective to least effective: Elimination, Substitution, Engineering Controls, Administrative Controls, Personal Protective Equipment (PPE)
The goal is to eliminate or reduce hazards at the source rather than relying on PPE
Example: Instead ...
I applied via Company Website and was interviewed before Jun 2021. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Billing Engineer
73
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
50
salaries
| ₹0 L/yr - ₹0 L/yr |
Planning Engineer
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
41
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem