Filter interviews by
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
Constitution industry is not a commonly known term. Please provide more context.
Please provide more information or context about the constitution industry.
Without additional information, it is difficult to provide a meaningful answer.
It is possible that the interviewer misspoke or meant to ask about a different industry.
It is important to clarify the question before attempting to answer it.
URC will be the best fit for me because of my skills and experience in HR, which align with URC's values and goals.
My experience in HR will allow me to contribute to URC's HR initiatives
I share URC's commitment to diversity and inclusion
I am excited about the opportunity to work with a global organization
My skills in talent acquisition and employee engagement will be valuable to URC
I applied via Walk-in and was interviewed in Dec 2022. There were 2 interview rounds.
IS Code of Concrete is IS 456:2000
IS 456:2000 is the Indian Standard code for Plain and Reinforced Concrete
It provides guidelines for the design and construction of concrete structures
The code covers various aspects such as materials, mix design, workmanship, and testing
It ensures the quality and durability of concrete structures
For example, IS 456:2000 specifies the minimum grade of concrete for different types of str
IS 456 is the Indian Standard code for the design and construction of reinforced concrete structures.
IS 456 provides guidelines for the use of reinforced concrete in construction.
It covers the general requirements for the design and construction of reinforced concrete structures.
The code includes provisions for materials, structural design, durability, and safety.
It also provides guidelines for testing and quality cont...
General aptitude questions
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
Material reconciliation is the process of comparing the actual materials used in a project with the estimated materials to ensure accuracy.
Involves comparing the actual quantity of materials used in a project with the estimated quantity
Helps in identifying any discrepancies or variances in material usage
Ensures that the project stays within budget and timelines
Can involve physical counting of materials on site or compa...
Rolling margin is the difference between the selling price and the cost of goods sold, expressed as a percentage.
Rolling margin helps in determining the profitability of a product or service.
It is calculated by subtracting the cost of goods sold from the selling price, dividing the result by the selling price, and then multiplying by 100.
For example, if a product is sold for $100 and the cost of goods sold is $60, the ...
Bend deduction of a ring in BBS is calculated by subtracting the sum of two bend allowances from the total length of the ring.
Calculate the bend allowance for each bend in the ring.
Add the bend allowances together to get the total bend allowance.
Subtract the total bend allowance from the total length of the ring to get the bend deduction.
Bend deduction for ring hook is the amount of material that is removed when bending a ring hook.
Bend deduction is calculated based on the material thickness and bend radius.
It is used to determine the flat pattern length of the material before bending.
For ring hooks, the bend deduction is typically around 1.5 times the material thickness.
The formula for calculating bend deduction is: Bend Deduction = (π/2) x Bend Radiu
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
Experienced Planning Engineer with a background in civil engineering and a proven track record of successfully managing projects.
Bachelor's degree in Civil Engineering
5+ years of experience in planning and managing construction projects
Proficient in project management software such as Primavera P6
Strong analytical and problem-solving skills
Excellent communication and teamwork abilities
In 5 years, I see myself as a senior Planning Engineer leading a team on major projects and contributing to the growth of the company.
Leading a team of planning engineers on major projects
Contributing to the growth and success of the company
Continuing to enhance my skills and knowledge in planning and project management
Possibly pursuing further certifications or advanced degrees in the field
I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.
LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.
LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.
JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...
posted on 30 Apr 2024
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
M4 in Planning refers to a milestone that marks the completion of a significant phase or deliverable in a project schedule.
M4 is typically used in project management to signify a key point in the project timeline.
It is often associated with the completion of a major task or the achievement of an important project milestone.
M4 can help track progress, identify potential delays, and ensure that the project stays on sched...
I will break down the 300 km laying project into smaller sections, assign resources, estimate durations, and create a detailed schedule.
Break down the project into manageable sections such as 10 km segments
Assign resources including equipment, manpower, and materials to each section
Estimate durations for each activity based on historical data or industry standards
Create a detailed schedule using a scheduling software l...
How will you provide schedule of WTP
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Billing Engineer
73
salaries
| ₹2.9 L/yr - ₹8 L/yr |
Senior Engineer
50
salaries
| ₹4.5 L/yr - ₹10.6 L/yr |
Junior Engineer
50
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Planning Engineer
45
salaries
| ₹3.7 L/yr - ₹7.5 L/yr |
Site Engineer
41
salaries
| ₹3.2 L/yr - ₹8 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem