Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Aarvee Associates Team. If you also belong to the team, you can get access from here

Aarvee Associates Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Aarvee Associates Billing Engineer Interview Questions and Answers

Updated 26 Aug 2023

Aarvee Associates Billing Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General Questions on yourself and previous organisation
Round 3 - Technical 

(2 Questions)

  • Q1. Question will be asked by you on your applied job profile, for eg if you are applying for billing engineer question will be on billing like what types of billing till you have done like milestone billing, ...
  • Q2. What is JMR. What is LD In terms of Billing. Software knowledge like excel MS word &. Power point
Round 4 - Document review 

(1 Question)

  • Q1. What is LD in billing, What is JMR, Mandatory document required for bill to be raised etc
  • Ans. 

    LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.

    • LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.

    • JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...

  • Answered by AI

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Precommissioning test of transformers
  • Ans. 

    Precommissioning tests of transformers ensure proper functioning and safety before energizing.

    • Visual inspection of transformer and its components

    • Measurement of insulation resistance

    • Measurement of winding resistance

    • Verification of transformer ratio and polarity

    • Verification of oil level and quality

    • Testing of protective devices

    • Verification of grounding

    • Functional testing of cooling system

    • Verification of nameplate data

  • Answered by AI
  • Q2. 11kv & 33kv overhead power line distribution
  • Ans. 

    11kv & 33kv overhead power line distribution

    • 11kv and 33kv are common voltage levels for overhead power lines

    • Overhead power lines are used to distribute electricity from power stations to consumers

    • The voltage level determines the distance the power can be transmitted and the size of the conductors needed

    • Proper insulation and grounding is important for safety

    • Maintenance and inspection of the lines is necessary to ensure

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - this interview was based on electrical basic concepts for practical site works.

Interview Questionnaire 

1 Question

  • Q1. Job requirements

Interview Questionnaire 

1 Question

  • Q1. He just asked how much will you take?

Interview Preparation Tips

Round: HR Interview
Experience: Nothing much, they are all concerned about money.
Tips: Just tell them as per company standard.

Interview Questionnaire 

1 Question

  • Q1. I am a civil engineer, and I want to join your company by heart. It is my dream company, I hope you will take me in your company. I'm very hard-working and focused on my work. Thanks,

Interview Preparation Tips

Interview preparation tips for other job seekers - I'm not adviser but the interview is only based on him/her confidence about carrer and company benefits.

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Asked me my work experience and my education.
Round 2 - HR 

(1 Question)

  • Q1. About My work experince and my education and my knowledge.
Round 3 - One-on-one 

(2 Questions)

  • Q1. About my work experience and my education and my knowledge.
  • Q2. My Interoduction and my

Interview Preparation Tips

Interview preparation tips for other job seekers - I am very honesty and hord working person.

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Execution department questions
  • Q2. Pipe laying questions
  • Q3. Joining questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Pile termination and pile related
  • Q2. What is the fludity time for bentonite?
  • Ans. 

    The fluidity time for bentonite varies depending on its composition and usage.

    • The fluidity time of bentonite is influenced by factors such as the concentration of bentonite in the mixture, temperature, and the presence of other additives.

    • Higher concentrations of bentonite generally result in shorter fluidity times.

    • The fluidity time can range from a few minutes to several hours.

    • For example, in drilling applications, ben...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Previous experience and projects
Round 4 - One-on-one 

(1 Question)

  • Q1. Regarding concrete

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare technically

Site Engineer Interview Questions & Answers

TCE user image sudipta biswas

posted on 25 Feb 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Ration of M25 grade concrete
  • Ans. 

    The ratio of M25 grade concrete is 1:1:2 (cement:sand:aggregate).

    • M25 grade concrete has a compressive strength of 25 MPa after 28 days.

    • The ratio of ingredients for M25 grade concrete is 1 part cement, 1 part sand, and 2 parts aggregate.

    • For example, to make 1 cubic meter of M25 grade concrete, you would need 350 kg of cement, 700 kg of sand, and 1400 kg of aggregate.

  • Answered by AI

Aarvee Associates Interview FAQs

How many rounds are there in Aarvee Associates Billing Engineer interview?
Aarvee Associates interview process usually has 4 rounds. The most common rounds in the Aarvee Associates interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Aarvee Associates Billing Engineer interview?

Some of the top questions asked at the Aarvee Associates Billing Engineer interview -

  1. What is LD in billing, What is JMR, Mandatory document required for bill to be ...read more
  2. What is JMR. What is LD In terms of Billing. Software knowledge like excel MS ...read more

Tell us how to improve this page.

Aarvee Associates Billing Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 753 Interviews
Tata Projects Interview Questions
4.2
 • 447 Interviews
TCE Interview Questions
3.7
 • 251 Interviews
AECOM Interview Questions
4.2
 • 117 Interviews
Apco Infratech Interview Questions
3.7
 • 116 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
View all
Aarvee Associates Billing Engineer Salary
based on 6 salaries
₹4.2 L/yr - ₹6.8 L/yr
At par with the average Billing Engineer Salary in India
View more details

Aarvee Associates Billing Engineer Reviews and Ratings

based on 3 reviews

2.8/5

Rating in categories

1.3

Skill development

2.6

Work-life balance

3.0

Salary

2.0

Job security

1.3

Company culture

1.6

Promotions

1.6

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
326 salaries
unlock blur

₹3.6 L/yr - ₹11 L/yr

Manager
119 salaries
unlock blur

₹6.5 L/yr - ₹19 L/yr

Field Engineer
119 salaries
unlock blur

₹1.6 L/yr - ₹4.2 L/yr

Site Engineer
93 salaries
unlock blur

₹2.7 L/yr - ₹6.6 L/yr

Civil Engineer
84 salaries
unlock blur

₹2.7 L/yr - ₹7.8 L/yr

Explore more salaries
Compare Aarvee Associates with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview