I applied via Company Website and was interviewed before Nov 2020. There were 3 interview rounds.
Top trending discussions
I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.
I am available for the project and can commit to the required time and effort.
I am currently not committed to any other projects
I have the necessary skills and experience to contribute effectively
I am willing to adjust my schedule if needed for the project
I am excited about the opportunity to work on this project
Components of bridges include abutments, piers, deck, superstructure, substructure, and foundation.
Abutments provide support at the ends of a bridge.
Piers support the bridge deck in the middle.
Deck is the surface that vehicles travel on.
Superstructure includes beams, girders, and trusses.
Substructure supports the superstructure and transfers loads to the foundation.
Foundation transfers the bridge loads to the ground.
Ex...
Bearings are structural components used to support and facilitate movement between two structural elements.
Types include roller bearings, ball bearings, plain bearings, and fluid bearings.
Roller bearings use cylindrical rollers to support heavy loads.
Ball bearings use balls to reduce friction between two surfaces.
Plain bearings have a sliding surface with no rolling elements.
Fluid bearings use a thin layer of liquid or
The major bridge I executed had a continuous span arrangement with multiple spans.
The major bridge had a continuous span arrangement with multiple spans
The span arrangement was designed to accommodate the required length and load capacity
The spans were connected seamlessly to ensure structural integrity and stability
posted on 27 Jan 2025
I was interviewed in Jul 2024.
posted on 15 Jun 2024
I applied via Company Website and was interviewed in Feb 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2023. There were 3 interview rounds.
Cement consumption of M20 concrete mix ratio is 360 kg/m3.
M20 concrete mix ratio is 1:1.5:3 (1 part cement, 1.5 parts sand, 3 parts aggregate)
Cement consumption for 1 m3 of M20 concrete is 360 kg
To calculate total cement consumption, multiply 360 kg by the volume of concrete needed
Extra items added in billing should be justified with proper documentation and approval.
Ensure that the extra item was actually used on the project
Check if the extra item was approved by the client or project manager
Document the reason for adding the extra item in the billing
Provide evidence such as photos or receipts to support the inclusion of the extra item
Rate analysis involves calculating the cost of various items in a construction project.
Rate analysis helps in determining the cost of materials, labor, and equipment for each item in a project.
It involves breaking down the total cost into components like material cost, labor cost, machinery cost, and overheads.
Rate analysis is essential for accurate budgeting and cost estimation in construction projects.
For example, in...
I was interviewed in Oct 2022.
I was interviewed before Oct 2022.
Yes, I am proficient in typing.
Yes, I am familiar with typing and can type accurately and efficiently.
I have experience using various typing software and tools.
I can type at a reasonable speed without errors.
For example, I have used Microsoft Word for typing reports and emails.
based on 19 reviews
Rating in categories
Assistant Manager
216
salaries
| ₹3 L/yr - ₹10.9 L/yr |
Manager
126
salaries
| ₹6.5 L/yr - ₹19 L/yr |
Field Engineer
124
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Site Engineer
93
salaries
| ₹2.1 L/yr - ₹6.6 L/yr |
Civil Engineer
83
salaries
| ₹2.2 L/yr - ₹7.8 L/yr |
Megha Engineering & Infrastructures
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company