A water supply scheme project involves designing and implementing a system to provide clean water to a community.
Identify the water source and assess its quality
Design a treatment system to remove impurities
Construct pipelines and storage tanks
Implement a distribution system to deliver water to households
Train community members on maintenance and operation of the system
I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.
Top trending discussions
I applied via Naukri.com and was interviewed before Mar 2020. There were 4 interview rounds.
HDD stands for Hard Disk Drive.
HDD is a data storage device used in computers and other electronic devices.
It uses magnetic storage to store and retrieve digital information.
HDDs are commonly used for long-term storage of files, programs, and operating systems.
They have spinning disks called platters that store data using read/write heads.
HDDs are slower than solid-state drives (SSDs) but offer larger storage capacitie
I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.
The rating of a transformer is in kVA and the current can be found using the formula: Current (A) = kVA / (1.732 x Voltage)
Transformer rating is in kVA (kilo-volt-ampere)
To find the current in a transformer, use the formula: Current (A) = kVA / (1.732 x Voltage)
For example, if a transformer has a rating of 100 kVA and operates at 480V, the current would be 100 / (1.732 x 480) = 120.7A
I applied via Campus Placement and was interviewed in May 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
Precommissioning tests of transformers ensure proper functioning and safety before energizing.
Visual inspection of transformer and its components
Measurement of insulation resistance
Measurement of winding resistance
Verification of transformer ratio and polarity
Verification of oil level and quality
Testing of protective devices
Verification of grounding
Functional testing of cooling system
Verification of nameplate data
11kv & 33kv overhead power line distribution
11kv and 33kv are common voltage levels for overhead power lines
Overhead power lines are used to distribute electricity from power stations to consumers
The voltage level determines the distance the power can be transmitted and the size of the conductors needed
Proper insulation and grounding is important for safety
Maintenance and inspection of the lines is necessary to ensure
based on 60 reviews
Rating in categories
Assistant Manager
326
salaries
| ₹3.6 L/yr - ₹11 L/yr |
Manager
119
salaries
| ₹6.5 L/yr - ₹19 L/yr |
Field Engineer
119
salaries
| ₹1.6 L/yr - ₹4.2 L/yr |
Site Engineer
93
salaries
| ₹2.7 L/yr - ₹6.6 L/yr |
Civil Engineer
84
salaries
| ₹2.7 L/yr - ₹7.8 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Kalpataru Projects International