I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.
Rolling margin is a financial metric used to measure the profitability of a company over a specific period of time.
Rolling margin is calculated by dividing the rolling gross profit by the rolling revenue and expressing the result as a percentage.
It helps in analyzing the trend of profitability over time by considering a moving average of financial performance.
For example, a company may calculate its rolling margin for ...
Rate analysis involves calculating the cost of materials and labor for a specific project.
Rate analysis for steel involves calculating the cost of steel per unit weight or volume.
Rate analysis for plaster involves calculating the cost of plaster per unit area or volume.
Factors such as transportation costs, labor costs, and wastage should be considered in rate analysis.
Rate analysis helps in estimating the total cost of
The quantity required for plaster is calculated based on the surface area to be covered and the thickness of the plaster.
Calculate the surface area to be covered by measuring the length and height of the walls or ceiling.
Determine the thickness of the plaster required, typically ranging from 10mm to 20mm.
Multiply the surface area by the thickness to get the volume of plaster needed.
Consider wastage and additional mater...
Top trending discussions
I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.
The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.
Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process
Discussed the importance of reconciliation in ensuring accurate billing and payment
Described the process of rate analysis and how ...
posted on 30 Apr 2024
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
M4 in Planning refers to a milestone that marks the completion of a significant phase or deliverable in a project schedule.
M4 is typically used in project management to signify a key point in the project timeline.
It is often associated with the completion of a major task or the achievement of an important project milestone.
M4 can help track progress, identify potential delays, and ensure that the project stays on sched...
I will break down the 300 km laying project into smaller sections, assign resources, estimate durations, and create a detailed schedule.
Break down the project into manageable sections such as 10 km segments
Assign resources including equipment, manpower, and materials to each section
Estimate durations for each activity based on historical data or industry standards
Create a detailed schedule using a scheduling software l...
How will you provide schedule of WTP
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
posted on 4 May 2024
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.
LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.
LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.
JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
Material reconciliation is the process of comparing the actual materials used in a project with the estimated materials to ensure accuracy.
Involves comparing the actual quantity of materials used in a project with the estimated quantity
Helps in identifying any discrepancies or variances in material usage
Ensures that the project stays within budget and timelines
Can involve physical counting of materials on site or compa...
Rolling margin is the difference between the selling price and the cost of goods sold, expressed as a percentage.
Rolling margin helps in determining the profitability of a product or service.
It is calculated by subtracting the cost of goods sold from the selling price, dividing the result by the selling price, and then multiplying by 100.
For example, if a product is sold for $100 and the cost of goods sold is $60, the ...
Bend deduction of a ring in BBS is calculated by subtracting the sum of two bend allowances from the total length of the ring.
Calculate the bend allowance for each bend in the ring.
Add the bend allowances together to get the total bend allowance.
Subtract the total bend allowance from the total length of the ring to get the bend deduction.
Bend deduction for ring hook is the amount of material that is removed when bending a ring hook.
Bend deduction is calculated based on the material thickness and bend radius.
It is used to determine the flat pattern length of the material before bending.
For ring hooks, the bend deduction is typically around 1.5 times the material thickness.
The formula for calculating bend deduction is: Bend Deduction = (π/2) x Bend Radiu
I applied via Walk-in and was interviewed in Dec 2022. There were 2 interview rounds.
IS Code of Concrete is IS 456:2000
IS 456:2000 is the Indian Standard code for Plain and Reinforced Concrete
It provides guidelines for the design and construction of concrete structures
The code covers various aspects such as materials, mix design, workmanship, and testing
It ensures the quality and durability of concrete structures
For example, IS 456:2000 specifies the minimum grade of concrete for different types of str
IS 456 is the Indian Standard code for the design and construction of reinforced concrete structures.
IS 456 provides guidelines for the use of reinforced concrete in construction.
It covers the general requirements for the design and construction of reinforced concrete structures.
The code includes provisions for materials, structural design, durability, and safety.
It also provides guidelines for testing and quality cont...
based on 2 interviews
Interview experience
based on 9 reviews
Rating in categories
Billing Engineer
73
salaries
| ₹2.9 L/yr - ₹8 L/yr |
Junior Engineer
51
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Senior Engineer
50
salaries
| ₹4.5 L/yr - ₹10.6 L/yr |
Planning Engineer
45
salaries
| ₹3.7 L/yr - ₹7.5 L/yr |
Site Engineer
41
salaries
| ₹3.2 L/yr - ₹8 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem