I applied via Referral and was interviewed before Mar 2022. There were 2 interview rounds.
I have conducted delay analysis for several earlier projects.
Used various delay analysis techniques such as As-Planned vs As-Built, Time Impact Analysis, Impacted As-Planned, etc.
Identified critical delays and their causes
Provided recommendations to mitigate delays in future projects
Examples: Delay analysis for construction of a hospital, delay analysis for a road project, delay analysis for a power plant project
Top trending discussions
I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.
The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.
Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process
Discussed the importance of reconciliation in ensuring accurate billing and payment
Described the process of rate analysis and how ...
Experienced Planning Engineer with a background in civil engineering and a proven track record of successfully managing projects.
Bachelor's degree in Civil Engineering
5+ years of experience in planning and managing construction projects
Proficient in project management software such as Primavera P6
Strong analytical and problem-solving skills
Excellent communication and teamwork abilities
In 5 years, I see myself as a senior Planning Engineer leading a team on major projects and contributing to the growth of the company.
Leading a team of planning engineers on major projects
Contributing to the growth and success of the company
Continuing to enhance my skills and knowledge in planning and project management
Possibly pursuing further certifications or advanced degrees in the field
I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.
LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.
LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.
JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...
posted on 4 May 2024
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
posted on 30 Apr 2024
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
M4 in Planning refers to a milestone that marks the completion of a significant phase or deliverable in a project schedule.
M4 is typically used in project management to signify a key point in the project timeline.
It is often associated with the completion of a major task or the achievement of an important project milestone.
M4 can help track progress, identify potential delays, and ensure that the project stays on sched...
I will break down the 300 km laying project into smaller sections, assign resources, estimate durations, and create a detailed schedule.
Break down the project into manageable sections such as 10 km segments
Assign resources including equipment, manpower, and materials to each section
Estimate durations for each activity based on historical data or industry standards
Create a detailed schedule using a scheduling software l...
How will you provide schedule of WTP
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
Material reconciliation is the process of comparing the actual materials used in a project with the estimated materials to ensure accuracy.
Involves comparing the actual quantity of materials used in a project with the estimated quantity
Helps in identifying any discrepancies or variances in material usage
Ensures that the project stays within budget and timelines
Can involve physical counting of materials on site or compa...
Rolling margin is the difference between the selling price and the cost of goods sold, expressed as a percentage.
Rolling margin helps in determining the profitability of a product or service.
It is calculated by subtracting the cost of goods sold from the selling price, dividing the result by the selling price, and then multiplying by 100.
For example, if a product is sold for $100 and the cost of goods sold is $60, the ...
Bend deduction of a ring in BBS is calculated by subtracting the sum of two bend allowances from the total length of the ring.
Calculate the bend allowance for each bend in the ring.
Add the bend allowances together to get the total bend allowance.
Subtract the total bend allowance from the total length of the ring to get the bend deduction.
Bend deduction for ring hook is the amount of material that is removed when bending a ring hook.
Bend deduction is calculated based on the material thickness and bend radius.
It is used to determine the flat pattern length of the material before bending.
For ring hooks, the bend deduction is typically around 1.5 times the material thickness.
The formula for calculating bend deduction is: Bend Deduction = (π/2) x Bend Radiu
General aptitude questions
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Billing Engineer
73
salaries
| ₹2.9 L/yr - ₹8 L/yr |
Junior Engineer
51
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Senior Engineer
50
salaries
| ₹4.5 L/yr - ₹10.6 L/yr |
Planning Engineer
45
salaries
| ₹3.7 L/yr - ₹7.5 L/yr |
Site Engineer
41
salaries
| ₹3.2 L/yr - ₹8 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem