I applied via Newspaper Ad and was interviewed before Feb 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Mar 2021. There was 1 interview round.
Top trending discussions
posted on 6 Sep 2024
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
Rate analysis involves calculating the cost of different items in a project.
Rate analysis involves breaking down the cost of each item in a project
It helps in determining the cost of materials, labor, and equipment for each item
Rate analysis is essential for accurate budgeting and cost estimation in construction projects
Escalation is the process of increasing the level of urgency or severity of a situation.
Escalation is commonly used in project management to address issues that require immediate attention.
It involves raising a concern to higher levels of authority when it cannot be resolved at the current level.
Escalation can also refer to increasing the intensity of a conflict or dispute.
Examples include escalating a customer complai...
Types of indices include price index, quantity index, and composite index.
Price index measures changes in prices over time.
Quantity index measures changes in quantities of goods or services.
Composite index combines price and quantity indices to provide a comprehensive measure.
Examples: Consumer Price Index (CPI), Producer Price Index (PPI), and Dow Jones Industrial Average.
Wastage can be controlled by proper planning, monitoring, training, and implementing efficient processes.
Implementing proper inventory management to avoid overstocking and expiration of materials
Regular monitoring of material usage and identifying areas of high wastage
Training staff on proper handling and storage of materials to prevent damage and spoilage
Implementing lean construction practices to minimize material wa...
I applied via Naukri.com and was interviewed in Feb 2023. There were 3 interview rounds.
Material reconciliation is the process of comparing the actual materials used in a project with the estimated materials to ensure accuracy.
Involves comparing the actual quantity of materials used in a project with the estimated quantity
Helps in identifying any discrepancies or variances in material usage
Ensures that the project stays within budget and timelines
Can involve physical counting of materials on site or compa...
Rolling margin is the difference between the selling price and the cost of goods sold, expressed as a percentage.
Rolling margin helps in determining the profitability of a product or service.
It is calculated by subtracting the cost of goods sold from the selling price, dividing the result by the selling price, and then multiplying by 100.
For example, if a product is sold for $100 and the cost of goods sold is $60, the ...
Bend deduction of a ring in BBS is calculated by subtracting the sum of two bend allowances from the total length of the ring.
Calculate the bend allowance for each bend in the ring.
Add the bend allowances together to get the total bend allowance.
Subtract the total bend allowance from the total length of the ring to get the bend deduction.
Bend deduction for ring hook is the amount of material that is removed when bending a ring hook.
Bend deduction is calculated based on the material thickness and bend radius.
It is used to determine the flat pattern length of the material before bending.
For ring hooks, the bend deduction is typically around 1.5 times the material thickness.
The formula for calculating bend deduction is: Bend Deduction = (π/2) x Bend Radiu
I applied via Walk-in and was interviewed in Feb 2023. There were 4 interview rounds.
LD in billing stands for Liquidated Damages, JMR stands for Joint Measurement Report, Mandatory documents include BOQ, drawings, work order, etc.
LD in billing refers to Liquidated Damages, which are penalties imposed on contractors for delays in project completion.
JMR stands for Joint Measurement Report, which is a document used to record measurements taken jointly by the client and contractor to verify quantities of w...
I applied via Company Website and was interviewed before Jun 2021. There was 1 interview round.
The interview covered topics such as rates of sub-contractors, billing process, reconciliation, rate analysis, previous project experience, and types of structures encountered.
Explained the process of obtaining rates from sub-contractors and how they are incorporated into the billing process
Discussed the importance of reconciliation in ensuring accurate billing and payment
Described the process of rate analysis and how ...
IS 1200
posted on 6 Sep 2024
I applied via Referral and was interviewed in Aug 2024. There was 1 interview round.
Rate analysis involves calculating the cost of different items in a project.
Rate analysis involves breaking down the cost of each item in a project
It helps in determining the cost of materials, labor, and equipment for each item
Rate analysis is essential for accurate budgeting and cost estimation in construction projects
Escalation is the process of increasing the level of urgency or severity of a situation.
Escalation is commonly used in project management to address issues that require immediate attention.
It involves raising a concern to higher levels of authority when it cannot be resolved at the current level.
Escalation can also refer to increasing the intensity of a conflict or dispute.
Examples include escalating a customer complai...
Types of indices include price index, quantity index, and composite index.
Price index measures changes in prices over time.
Quantity index measures changes in quantities of goods or services.
Composite index combines price and quantity indices to provide a comprehensive measure.
Examples: Consumer Price Index (CPI), Producer Price Index (PPI), and Dow Jones Industrial Average.
Wastage can be controlled by proper planning, monitoring, training, and implementing efficient processes.
Implementing proper inventory management to avoid overstocking and expiration of materials
Regular monitoring of material usage and identifying areas of high wastage
Training staff on proper handling and storage of materials to prevent damage and spoilage
Implementing lean construction practices to minimize material wa...
based on 1 interview
Interview experience
based on 20 reviews
Rating in categories
Billing Engineer
74
salaries
| ₹2.8 L/yr - ₹7.8 L/yr |
Senior Engineer
50
salaries
| ₹4.5 L/yr - ₹10.6 L/yr |
Junior Engineer
50
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Planning Engineer
45
salaries
| ₹3.7 L/yr - ₹7.5 L/yr |
Site Engineer
41
salaries
| ₹3.2 L/yr - ₹8 L/yr |
L&T Energy Hydrocarbon
AECOM
Apco Infratech
Saipem