I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.
Resource planning involves allocating resources efficiently for project execution, while logistic planning focuses on coordinating the movement of resources and materials.
Resource planning involves identifying and allocating resources such as manpower, equipment, materials, and budget for project activities.
Logistic planning involves coordinating the movement of resources and materials to ensure timely delivery and eff...
Types of drawings used in construction include architectural drawings, structural drawings, mechanical drawings, electrical drawings, and plumbing drawings.
Architectural drawings: show the layout, design, and details of a building's structure.
Structural drawings: focus on the framework and support of the building.
Mechanical drawings: depict HVAC systems, ductwork, and equipment layouts.
Electrical drawings: illustrate t...
WBS stands for Work Breakdown Structure, a hierarchical decomposition of the total scope of work to be carried out by the project team.
WBS breaks down the project deliverables into smaller, more manageable components.
It helps in organizing and defining the total scope of the project.
Each level of the WBS represents a different level of detail.
It is a visual representation of the project scope.
Example: WBS for building ...
Various data points are required to prepare a master schedule.
Project scope and deliverables
Resource availability and allocation
Dependencies between tasks
Duration estimates for each task
Constraints and milestones
Historical data from similar projects
I applied via Naukri.com
I applied via Naukri.com and was interviewed before Mar 2022. There were 3 interview rounds.
Yes, I have worked with Mivan shuttering.
I have experience in using Mivan shuttering for construction projects.
I am familiar with the process of assembling and disassembling Mivan formwork.
I have worked with Mivan shuttering for building walls, columns, and slabs.
I am aware of the advantages of using Mivan shuttering, such as faster construction time and better quality.
I have also trained other team members on how to u
Sj Contracts interview questions for designations
Top trending discussions
General aptitude questions
Experienced Planning Engineer with a background in civil engineering and a proven track record of successfully managing projects.
Bachelor's degree in Civil Engineering
5+ years of experience in planning and managing construction projects
Proficient in project management software such as Primavera P6
Strong analytical and problem-solving skills
Excellent communication and teamwork abilities
In 5 years, I see myself as a senior Planning Engineer leading a team on major projects and contributing to the growth of the company.
Leading a team of planning engineers on major projects
Contributing to the growth and success of the company
Continuing to enhance my skills and knowledge in planning and project management
Possibly pursuing further certifications or advanced degrees in the field
posted on 30 Apr 2024
I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.
M4 in Planning refers to a milestone that marks the completion of a significant phase or deliverable in a project schedule.
M4 is typically used in project management to signify a key point in the project timeline.
It is often associated with the completion of a major task or the achievement of an important project milestone.
M4 can help track progress, identify potential delays, and ensure that the project stays on sched...
I will break down the 300 km laying project into smaller sections, assign resources, estimate durations, and create a detailed schedule.
Break down the project into manageable sections such as 10 km segments
Assign resources including equipment, manpower, and materials to each section
Estimate durations for each activity based on historical data or industry standards
Create a detailed schedule using a scheduling software l...
How will you provide schedule of WTP
posted on 4 May 2024
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.
based on 8 reviews
Rating in categories
Billing Engineer
73
salaries
| ₹2.8 L/yr - ₹7.8 L/yr |
Senior Engineer
51
salaries
| ₹4.5 L/yr - ₹10.8 L/yr |
Junior Engineer
51
salaries
| ₹1.5 L/yr - ₹5 L/yr |
Planning Engineer
47
salaries
| ₹3.7 L/yr - ₹7.5 L/yr |
Site Engineer
41
salaries
| ₹3.2 L/yr - ₹8 L/yr |
L&T Energy Hydrocarbon
AECOM
Apco Infratech
Toyo Engineering