Aarvee Associates Quantity Surveyor Interview Questions, Process, and Tips

Updated 20 Oct 2023

Aarvee Associates Quantity Surveyor Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. How many years of experience do you have as a Quantity Surveyor?
  • Q2. What is the Current CTC & Expected CTC?
  • Ans. 

    Current CTC is $60,000 and Expected CTC is $70,000.

    • Current CTC is the current annual salary of the candidate.

    • Expected CTC is the annual salary the candidate is expecting from the new job.

    • It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.

    • For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.

  • Answered by AI
  • Q3. How much is the notice period in present company?
  • Q4. What is your family background?
  • Q5. Why you are planning to relocate?
  • Q6. Did you apply for any job previously with Aarvee Associates?
Round 3 - Technical 

(6 Questions)

  • Q1. Brief about yourself?
  • Q2. Do you involve in doing Cost Estimations and what type of Estimates you prepared?
  • Ans. 

    Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.

    • I prepare detailed estimates based on quantities of materials and labor required for a project.

    • I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.

    • I use software tools...

  • Answered by AI
  • Q3. How do you verify the bill which is submitted by the Contractor/Concessionaire?
  • Ans. 

    Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.

    • Check quantities mentioned in the bill against the actual work done on site.

    • Verify rates and unit prices for each item in the bill with the contract agreement.

    • Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.

    • Conduct site measurements to confirm the work completed matches the

  • Answered by AI
  • Q4. What are the evidential documents required to scrutiny the RA Bill?
  • Ans. 

    Evidential documents required for scrutinizing the RA Bill

    • Contract documents

    • Measurement sheets

    • Bills of quantities

    • Variation orders

    • Payment certificates

  • Answered by AI
  • Q5. How do you justify the change of scope works which are to be recommended to the authority?
  • Ans. 

    Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.

    • Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.

    • Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...

  • Answered by AI
  • Q6. What are the basic inputs for preparing the Bill of Quantities?
  • Ans. 

    Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.

    • Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.

    • Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.

    • Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarvee Associates Quantity Surveyor interview:
  • Bill of Quantities
  • Schedules in Contract Agreement
  • Rate Analysis methods
  • Bill Procedures
Interview preparation tips for other job seekers - Required minimum 5 years of experience as a Quantity Surveyor in a relevant field, then you will easily crack the interview.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Based on last project mentioned in resume
  • Q2. Piping support related questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Write in resume only things which you actually performed

Interview Questionnaire 

1 Question

  • Q1. I am a civil engineer, and I want to join your company by heart. It is my dream company, I hope you will take me in your company. I'm very hard-working and focused on my work. Thanks,

Interview Preparation Tips

Interview preparation tips for other job seekers - I'm not adviser but the interview is only based on him/her confidence about carrer and company benefits.

I appeared for an interview in Aug 2019.

Interview Questionnaire 

4 Questions

  • Q1. How many types of structure
  • Ans. 

    There are various types of structures, including buildings, bridges, dams, tunnels, and towers.

    • Structures can be classified based on their purpose, design, and materials used.

    • Buildings can be further classified into residential, commercial, and industrial structures.

    • Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.

    • Dams can be classified into gravity, arch, buttress, and embankment dams.

    • Tu...

  • Answered by AI
  • Q2. What is density
  • Ans. 

    Density is the measure of mass per unit volume of a substance.

    • It is a physical property of matter.

    • It is calculated by dividing the mass of a substance by its volume.

    • Units of density include kg/m³, g/cm³, and lb/ft³.

    • Density can be used to identify substances and determine their purity.

    • For example, gold has a density of 19.3 g/cm³, while aluminum has a density of 2.7 g/cm³.

  • Answered by AI
  • Q3. How many types of density construction
  • Ans. 

    There are two types of density construction: compacted and loose.

    • Compacted density construction involves compressing the material to increase its density, such as in road construction.

    • Loose density construction involves leaving the material in its natural state, such as in landscaping.

    • The type of density construction used depends on the intended use of the material and the desired level of compaction.

    • Other factors that...

  • Answered by AI
  • Q4. Which types of tests construction joint
  • Ans. 

    Tests for construction joints include visual inspection, water tightness test, and load transfer test.

    • Visual inspection to check for proper joint alignment and sealant application

    • Water tightness test to ensure no water leakage through the joint

    • Load transfer test to verify the joint can handle the intended load

    • Other tests may include pull-out test, shear test, and compression test

    • Testing frequency and methods may vary d...

  • Answered by AI

Skills evaluated in this interview

I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. What are the standards used for plant layout in refineries
  • Ans. 

    Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.

    • Plant layout should prioritize safety and minimize the risk of accidents.

    • Efficiency is also important, with consideration given to the flow of materials and equipment.

    • Regulations and industry standards must be followed, such as those set by OSHA and API.

    • Examples of layout considerations include spacing between equipment,...

  • Answered by AI
  • Q2. What is the frequency on visiting Vendor Shops for expediting
  • Ans. 

    The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.

    • The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.

    • It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...

  • Answered by AI
  • Q3. Have You worked in CDU-VDU unit?
  • Q4. What is DCU?
  • Ans. 

    DCU stands for Dublin City University, a university located in Dublin, Ireland.

    • DCU was established in 1980 and has over 17,000 students.

    • It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.

    • DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.

    • Some not...

  • Answered by AI
  • Q5. Why it is called delayed?
  • Ans. 

    Delayed is called so because it refers to something that is postponed or occurs after the expected time.

    • The term 'delayed' is used to describe situations where there is a time lag or postponement.

    • It implies that something is not happening immediately or as scheduled.

    • Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.

    • For example, a delayed flight refers to ...

  • Answered by AI
  • Q6. What happens at CDU-VDU?

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one technical interview and final negotiation with HR

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. He just asked how much will you take?

Interview Preparation Tips

Round: HR Interview
Experience: Nothing much, they are all concerned about money.
Tips: Just tell them as per company standard.

I applied via Naukri.com and was interviewed in May 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Basics and details of compressed air system, EOT cranes,
  • Q2. Basics of stacker reclaimer, bag filter, thickener

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident. Be thorough with the basics. You will clear the interview if you have really worked on the systems.

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Asked me my work experience and my education.
Round 2 - HR 

(1 Question)

  • Q1. About My work experince and my education and my knowledge.
Round 3 - One-on-one 

(2 Questions)

  • Q1. About my work experience and my education and my knowledge.
  • Q2. My Interoduction and my

Interview Preparation Tips

Interview preparation tips for other job seekers - I am very honesty and hord working person.

Site Engineer Interview Questions & Answers

AECOM user image Babalpreet singh

posted on 2 May 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. DAISCUSS ABOUT TECHNICAL ASPECTS OF CIVIL ENGINEERING AND SOFTWARE SKILLS
  • Q2. CODAL PROVISION OF CONCRETE AND COMMANDS OF SOFTWARE
  • Ans. 

    CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.

    • CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.

    • Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Work enviourment is very fabulous

I applied via Naukri.com and was interviewed in Mar 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Totally related on work experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice

Aarvee Associates Interview FAQs

How many rounds are there in Aarvee Associates Quantity Surveyor interview?
Aarvee Associates interview process usually has 3 rounds. The most common rounds in the Aarvee Associates interview process are Resume Shortlist, HR and Technical.
What are the top questions asked in Aarvee Associates Quantity Surveyor interview?

Some of the top questions asked at the Aarvee Associates Quantity Surveyor interview -

  1. What are the evidential documents required to scrutiny the RA Bi...read more
  2. What are the basic inputs for preparing the Bill of Quantiti...read more
  3. Do you involve in doing Cost Estimations and what type of Estimates you prepare...read more

Tell us how to improve this page.

Aarvee Associates Quantity Surveyor Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Aarvee Associates Quantity Surveyor Salary
based on 6 salaries
₹5.5 L/yr - ₹8 L/yr
11% more than the average Quantity Surveyor Salary in India
View more details

Aarvee Associates Quantity Surveyor Reviews and Ratings

based on 6 reviews

4.3/5

Rating in categories

4.9

Skill development

4.3

Work-life balance

4.3

Salary

4.3

Job security

4.6

Company culture

4.0

Promotions

4.6

Work satisfaction

Explore 6 Reviews and Ratings
Assistant Manager
334 salaries
unlock blur

₹3.6 L/yr - ₹11 L/yr

Manager
120 salaries
unlock blur

₹6.5 L/yr - ₹19 L/yr

Field Engineer
119 salaries
unlock blur

₹1.6 L/yr - ₹4.2 L/yr

Site Engineer
95 salaries
unlock blur

₹2.4 L/yr - ₹6.6 L/yr

Civil Engineer
83 salaries
unlock blur

₹2.7 L/yr - ₹7.8 L/yr

Explore more salaries
Compare Aarvee Associates with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview