I applied via Campus Placement and was interviewed before Dec 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Apr 2021. There were 2 interview rounds.
The daily progress rate of welders varies based on factors such as experience, type of welding, and complexity of the project.
Welders with more experience tend to have a higher daily progress rate.
The type of welding being done can also affect the daily progress rate. For example, TIG welding may take longer than MIG welding.
The complexity of the project can also impact the daily progress rate. A simple welding project...
Project delays can be caused by various constraints.
Project delays can be caused by resource constraints such as lack of manpower or budget constraints.
Technical constraints such as unexpected technical issues or changes in requirements can also cause delays.
External constraints such as weather conditions or delays in receiving materials can also impact project timelines.
Effective project management can help mitigate t
Tata Projects interview questions for designations
I applied via Naukri.com and was interviewed in Apr 2021. There were 6 interview rounds.
To raise funding, create a solid business plan and pitch to investors. To control spending, set a budget and track expenses.
Create a detailed business plan that outlines your goals, strategies, and financial projections.
Identify potential investors and pitch your business plan to them.
Consider alternative funding sources such as crowdfunding or small business loans.
Set a budget and track all expenses to ensure you are ...
Get interview-ready with Top Tata Projects Interview Questions
I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.
Plant layout should prioritize safety and minimize the risk of accidents.
Efficiency is also important, with consideration given to the flow of materials and equipment.
Regulations and industry standards must be followed, such as those set by OSHA and API.
Examples of layout considerations include spacing between equipment,...
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
What people are saying about Tata Projects
I applied via Recruitment Consultant and was interviewed in Oct 2019. There were 5 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
The El Signalling system is a railway signalling system used in Europe.
The system uses a combination of track circuits and signals to control train movements.
It was first introduced in the early 20th century and has since been updated and modernized.
The system is used in countries such as France, Spain, and Italy.
It allows for efficient and safe train operations on busy railway lines.
The system has faced some criticism
Indian Railways has a modern telecom system for efficient communication and safety.
Telecom system includes GSM-R, Wi-Fi, and CCTV surveillance.
GSM-R enables communication between train drivers and control centers.
Wi-Fi is available for passengers in select trains and stations.
CCTV surveillance ensures safety and security of passengers and railway property.
Indian Railways is also implementing a Train Collision Avoidance
I applied via Recruitment Consultant and was interviewed before Dec 2020. There were 3 interview rounds.
Load calculation of Transformer
Load calculation involves determining the amount of power required by the load
Transformer rating should be higher than the calculated load
Load calculation takes into account factors such as power factor, efficiency, and voltage regulation
Formula for load calculation: Load (kVA) = Voltage (V) x Current (A) x Power Factor
Example: If the load is 100 kW with a power factor of 0.8 and a voltag...
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There were 2 interview rounds.
Need to training for design software course.
based on 7 interviews
Interview experience
based on 90 reviews
Rating in categories
Deputy Manager
1.2k
salaries
| ₹5.8 L/yr - ₹17.5 L/yr |
Assistant Manager
723
salaries
| ₹4 L/yr - ₹14.8 L/yr |
Manager
416
salaries
| ₹8 L/yr - ₹22 L/yr |
Senior Engineer
391
salaries
| ₹3.5 L/yr - ₹12 L/yr |
Senior Manager
338
salaries
| ₹12 L/yr - ₹32.5 L/yr |
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company
KEC International