I applied via Recruitment Consultant and was interviewed in May 2019. There were 3 interview rounds.
Standards for plant layout in refineries ensure safety, efficiency, and compliance with regulations.
Plant layout should prioritize safety and minimize the risk of accidents.
Efficiency is also important, with consideration given to the flow of materials and equipment.
Regulations and industry standards must be followed, such as those set by OSHA and API.
Examples of layout considerations include spacing between equipment,...
The frequency of visiting vendor shops for expediting depends on various factors such as project timelines, vendor reliability, and urgency of the situation.
The frequency of visiting vendor shops for expediting can vary from daily visits to weekly or monthly visits.
It depends on the project timelines and the urgency of the situation. If a project is running behind schedule, more frequent visits may be required to ensur...
DCU stands for Dublin City University, a university located in Dublin, Ireland.
DCU was established in 1980 and has over 17,000 students.
It offers a wide range of undergraduate and postgraduate courses in various fields such as business, engineering, science, arts, and humanities.
DCU is known for its innovative approach to education and research, and has partnerships with many leading companies and institutions.
Some not...
Delayed is called so because it refers to something that is postponed or occurs after the expected time.
The term 'delayed' is used to describe situations where there is a time lag or postponement.
It implies that something is not happening immediately or as scheduled.
Delays can occur due to various reasons such as technical issues, logistical problems, or unforeseen circumstances.
For example, a delayed flight refers to ...
posted on 24 Jan 2025
Scaffolding codes are standards set by regulatory bodies to ensure safe construction practices.
Scaffolding codes vary by country and region, but generally include guidelines on materials, design, erection, use, and dismantling of scaffolds.
Common standards include OSHA regulations in the United States, BS EN 12811 in Europe, and AS/NZS 1576 in Australia.
Inspectors must ensure that scaffolding meets these codes to preve
Different types of scaffolding erection include supported scaffolding, suspended scaffolding, mobile scaffolding, and aerial lifts.
Supported scaffolding is the most common type and is supported by the ground.
Suspended scaffolding is hung from the top of a building or structure.
Mobile scaffolding is on wheels and can be easily moved around a worksite.
Aerial lifts are platforms that can be raised and lowered for access t
Safety purchase materials should be durable, high quality, and compliant with safety regulations.
Choose materials that are durable and can withstand heavy loads
Select high quality materials to ensure safety of workers
Ensure that the materials meet safety regulations and standards
Examples of safety purchase materials include high-strength steel, aluminum, and quality wood
Safe erection of scaffolding involves proper planning, training, supervision, and adherence to safety regulations.
Ensure all workers are properly trained in scaffolding erection and safety procedures.
Inspect all components of the scaffolding before erection to ensure they are in good condition.
Plan the erection process carefully, considering factors such as weight capacity, stability, and proximity to power lines.
Use p...
Identifying risks and hazards is crucial for ensuring safety in scaffolding work.
Inspecting scaffolding for stability and structural integrity
Identifying potential fall hazards such as unsecured planks or missing guardrails
Checking for electrical hazards near scaffolding
Assessing weather conditions that could impact scaffolding safety
Ensuring proper training and supervision of workers to prevent accidents
I was interviewed in Feb 2025.
Company Notice period
The size of a cube is determined by the length of its sides, measured in millimeters.
A cube has equal sides; if one side is 10mm, all sides are 10mm.
Volume can be calculated as side^3; for a 10mm cube, volume = 1000mm³.
Common sizes include 5mm, 10mm, 20mm, etc., depending on the application.
M20 concrete typically achieves about 70% of its strength in 7 days, approximately 15-17 kN/mm².
M20 grade concrete has a characteristic compressive strength of 20 MPa (20 N/mm²) at 28 days.
After 7 days, M20 concrete generally reaches about 65-70% of its 28-day strength.
This means the nominal strength after 7 days is approximately 13-14 N/mm², or 13-14 kN/mm².
Factors like curing conditions and temperature can affect the
NP2 and NP3 pipes differ in their pressure ratings and applications in construction and plumbing.
NP2 pipes have a lower pressure rating compared to NP3 pipes, making them suitable for less demanding applications.
NP3 pipes are designed for higher pressure applications, often used in water supply and drainage systems.
For example, NP2 pipes might be used for irrigation, while NP3 pipes are used in municipal water supply.
T...
To check anodized aluminum depth, use methods like thickness gauges or chemical tests for accurate measurement.
Use a micrometer or caliper to measure the thickness of the anodized layer directly.
Employ a portable anodizing thickness gauge, which uses eddy current or ultrasonic methods.
Conduct a chemical test using a specific anodizing depth measurement solution that reacts with the anodized layer.
Perform a scratch test...
A toilet bathroom pipeline should have a slope of 1/4 inch per foot for effective drainage.
A slope of 1/4 inch per foot is standard for toilet drain lines.
This slope ensures proper flow and prevents clogs.
For example, a 10-foot pipe should drop 2.5 inches from the toilet to the sewer line.
Too steep a slope can cause waste to flow too quickly, leading to blockages.
Tata Projects interview questions for popular designations
I was interviewed in Jan 2025.
Get interview-ready with Top Tata Projects Interview Questions
I was interviewed in Mar 2024.
I have 8 years of experience in the hospitality industry, including 4 years as a General Manager.
8 years of experience in the hospitality industry
4 years as a General Manager
Strong leadership and team management skills
Proven track record of increasing revenue and customer satisfaction
Experience in budgeting, forecasting, and strategic planning
I chose this company because of its strong reputation in the industry and its commitment to employee development.
Strong reputation in the industry
Commitment to employee development
Opportunities for growth and advancement
Positive company culture
I am looking for a competitive salary that reflects my experience and skills.
Research industry standards for Assistant General Manager salaries
Consider your level of experience and qualifications
Be prepared to negotiate based on the job responsibilities and benefits package
I was interviewed in Feb 2025.
I was interviewed in Aug 2024.
NPD Design review document preparation
Top trending discussions
The duration of Tata Projects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 549 interviews
Interview experience
based on 5.3k reviews
Rating in categories
Deputy Manager
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
719
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
407
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
387
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
366
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company