Premium Employer

i

This company page is being actively managed by Tata Projects Team. If you also belong to the team, you can get access from here

Tata Projects

Compare button icon Compare button icon Compare

Filter interviews by

Tata Projects Interview Questions, Process, and Tips

Updated 2 Mar 2025

Top Tata Projects Interview Questions and Answers

View all 297 questions

Tata Projects Interview Experiences

Popular Designations

426 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Finishing formen work for residential contraction
  • Q2. Tailing painting gypsum ceiling
Round 2 - HR 

(2 Questions)

  • Q1. Finishing sr executive contraction
  • Q2. All flat finishing and handover to customer

Interview Preparation Tips

Interview preparation tips for other job seekers - All resident comercial finishing work and flat ready and customer handover

Sun Pharmaceutical Industries

Join us and thrive in a company culture that inspires and empowers.

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Due to the information according to the works

Round 2 - Technical 

(3 Questions)

  • Q1. What is the function of oil in transformer.
  • Ans. 

    Oil in transformers functions as an insulating and cooling medium to prevent overheating and breakdown of electrical components.

    • Insulates electrical components to prevent short circuits

    • Cools the transformer by dissipating heat generated during operation

    • Protects against moisture and contaminants

    • Improves dielectric strength of the transformer oil

    • Examples: mineral oil, silicone oil, and synthetic esters

  • Answered by AI
  • Q2. How does the secondary voltage pass from the primary winding in a transformer.
  • Ans. 

    The secondary voltage passes from the primary winding in a transformer through electromagnetic induction.

    • When an alternating current flows through the primary winding, it creates a changing magnetic field around the winding.

    • This changing magnetic field induces a voltage in the secondary winding through electromagnetic induction.

    • The induced voltage in the secondary winding is proportional to the ratio of the number of t

  • Answered by AI
  • Q3. What would be the frequency in India
  • Ans. 

    The frequency in India typically refers to the frequency of electricity supply, which is 50 Hz.

    • The frequency of electricity supply in India is 50 Hz.

    • This frequency is standard for most of the country's power grid.

    • It is important for electrical equipment to be compatible with this frequency to function properly.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Tata Projects Senior MEP Engineer interview:
  • Electrical and electronics epart
Interview preparation tips for other job seekers - Great aim and hard work

Senior MEP Engineer Interview Questions asked at other Companies

Q1. How does the secondary voltage pass from the primary winding in a transformer.
View answer (1)
Tata Projects Interview Questions and Answers for Freshers
illustration image
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Assignment 

Assignment details can include the purpose of the assignment, the student's progress, and the maximum file size for a submission. [1, 2, 3]
Assignment purpose [4]

• Description: A brief summary of the assignment's topic, length, and genre [4]
• Goals: What the assignment is meant to achieve and how it fits into the course's larger goals [3]
• Grading rubric: A set of criteria for evaluating the assignment [5]

Student progress [1]

• Assigned to: A list of students who are working on the assignment
• Student information: Each student's name, IP address, and last session data
• Growth: A comparison of the student's current course level to their starting level
• Skills tested: A chart that shows the student's performance on the assignment
• Progress: A graph that shows the student's progress over time

Submission details [2]

• Maximum file size: The largest file size that students can submit [2]
• Format: Whether the assignment is to be submitted in handwriting or typed [6]
• Margins: The size of the margins to be left on the assignment [6]


Generative AI is experimental.

[1] -----assignment_details.htm[2] -----Assignment_details[3] -----Teaching_resources/TLPDC_teaching_resources/CreatingEffectiveAssignments.php[4] -----[5] -----[6] -----.pdf
Not all images can be exported from Search.

Interview Preparation Tips

Interview preparation tips for other job seekers - The Tata project company is the best company
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Stages in finishing activity
  • Q2. Types of tiles available in market

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on your question

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (22)

Tata Projects interview questions for popular designations

 Deputy Manager

 (21)

 Assistant Manager

 (12)

 Senior Engineer

 (10)

 Safety Officer

 (9)

 Safety Supervisor

 (8)

 Civil Engineer

 (7)

 Electrical Supervisor

 (7)

 Civil Site Engineer

 (7)

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Technical questions
  • Q2. Piping material code
Round 2 - Technical 

(2 Questions)

  • Q1. Technical questions
  • Q2. Piping erection fitup and material code
Round 3 - HR 

(2 Questions)

  • Q1. Technical questions
  • Q2. Piping welding related

Piping Engineer Interview Questions asked at other Companies

Q1. What is the basic difference between Pipe specification A106 Gr.A / Gr.B/ Gr.C.?
View answer (4)

Get interview-ready with Top Tata Projects Interview Questions

Interview Questions & Answers

user image AJIT SAHOO

posted on 15 Nov 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is EVM Analysis
  • Ans. 

    EVM Analysis is a project management technique used to measure project performance and progress by comparing planned vs actual costs and schedule.

    • EVM stands for Earned Value Management.

    • It involves analyzing the project's planned budget, actual costs, and work completed to determine if the project is on track.

    • Key metrics in EVM analysis include Cost Performance Index (CPI), Schedule Performance Index (SPI), and Variance...

  • Answered by AI
  • Q2. What is Planned Value

Interview Preparation Tips

Interview preparation tips for other job seekers - be focused on practical skills & Mentioned in the Resume.

Skills evaluated in this interview

Jobs at Tata Projects

View all
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Reheating furnace all operation or mechanical .
  • Ans. 

    The operation and mechanical aspects of a reheating furnace are crucial for production and quality control.

    • Ensure all components of the reheating furnace are functioning properly to maintain consistent heating temperatures.

    • Regularly inspect and maintain the mechanical parts of the furnace to prevent breakdowns and ensure efficiency.

    • Monitor the operation of the furnace to optimize heating processes and minimize energy c...

  • Answered by AI
  • Q2. Hot stirp mill rolling mill operation mechanical
  • Q3. My senior or junior member talking any questions
Round 2 - One-on-one 

(2 Questions)

  • Q1. All Questions to steel plant related
  • Q2. Some questions safety related
Round 3 - Aptitude Test 

My manner , junior member talking and other

Interview Preparation Tips

Interview preparation tips for other job seekers - No thanks 👍

Production & Quality Engineer Interview Questions asked at other Companies

Q1. 1)What is kaizen , 2)what is 8 D methodology, 3) what are the types of measuring instruments used in manufacturing industries.
View answer (2)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Group Discussion 

Electrical and instrumentation

Round 2 - Group Discussion 

11 Am calibration and breakdown

Round 3 - Technical 

(2 Questions)

  • Q1. Transformers IR
  • Q2. Transmitter calibration and fault

Electrical Manager and Engineer Interview Questions asked at other Companies

Q1. Why transformer rated kva insted of kWh
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company

Round 1 - Technical 

(3 Questions)

  • Q1. Electrical field
  • Q2. Site trouble shooting problem discussion
  • Q3. No not at all
Round 2 - Case Study 

For any case study related to field

Round 3 - Group Discussion 

For my technical field questions

Electrical Site Engineer Interview Questions asked at other Companies

Q1. What is the maximum range of voltage rating for belted cables are in used?
View answer (5)

Coating Inspector Interview Questions & Answers

user image HIMADRI SHEKHAR ROY

posted on 7 Feb 2025

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
6-8 weeks
Result
Selected Selected

I was interviewed in Aug 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. State the coating procedure
  • Ans. 

    The coating procedure involves surface preparation, application of primer, application of topcoat, and inspection for quality control.

    • Surface preparation involves cleaning, degreasing, and roughening the surface to ensure proper adhesion of the coating.

    • Primer is applied to enhance adhesion and corrosion resistance of the coating system.

    • Topcoat is applied for color, gloss, and additional protection.

    • Inspection is conduct...

  • Answered by AI
  • Q2. State the CODES of verious step of coating procedure
  • Ans. 

    Various codes are followed in different steps of the coating procedure to ensure quality and safety.

    • SSPC standards are commonly used in surface preparation (e.g. SSPC-SP1 for solvent cleaning)

    • ISO standards are followed for coating application (e.g. ISO 12944 for corrosion protection)

    • ASTM standards are referenced for testing and evaluation of coatings (e.g. ASTM D3359 for adhesion testing)

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Why you want to switch you job to TPL
  • Ans. 

    I am seeking new challenges and opportunities for growth in my career.

    • Seeking new challenges and opportunities for growth

    • Interested in the projects and work culture at TPL

    • Looking to expand my skills and knowledge in the coating industry

  • Answered by AI
  • Q2. What is you future plan
  • Ans. 

    My future plan is to continue gaining experience and certifications in the coating inspection field, with the goal of eventually becoming a senior coating inspector.

    • Continue taking relevant courses and certifications to enhance my knowledge and skills

    • Seek opportunities to work on a variety of projects to gain diverse experience

    • Network with industry professionals to learn from their expertise and insights

    • Set a goal to b...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Before interview, should be prepared

Coating Inspector Interview Questions asked at other Companies

Q1. What is surface cleanliness?? How do you relate it with surface profile?? Where do you find details about surface profile??
View answer (3)
Contribute & help others!
anonymous
You can choose to be anonymous

Tata Projects Interview FAQs

How many rounds are there in Tata Projects interview?
Tata Projects interview process usually has 2-3 rounds. The most common rounds in the Tata Projects interview process are Technical, Resume Shortlist and HR.
How to prepare for Tata Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Tata Projects. The most common topics and skills that interviewers at Tata Projects expect are EHS, High Rise Building, Project Management, Quality Assurance and HSE.
What are the top questions asked in Tata Projects interview?

Some of the top questions asked at the Tata Projects interview -

  1. What we do for shortage of material receiv...read more
  2. What is safety equipment. Use for si...read more
  3. Can we do correction in invoice? if ans is yes then what are the further ste...read more
How long is the Tata Projects interview process?

The duration of Tata Projects interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

REVIEWS

Virtusa Consulting Services

No Reviews

REVIEWS

North East Small Finance Bank

No Reviews

DESIGNATION

DESIGNATION

DESIGNATION

Tell us how to improve this page.

Tata Projects Interview Process

based on 535 interviews

Interview experience

4.4
  
Good
View more

HCLTech

There's no stopping you

Join Tata Projects Simplify. Create.

Tata Projects Reviews and Ratings

based on 5.3k reviews

4.2/5

Rating in categories

4.0

Skill development

4.0

Work-life balance

4.1

Salary

4.1

Job security

4.0

Company culture

3.6

Promotions

3.9

Work satisfaction

Explore 5.3k Reviews and Ratings
Facade Manager

Noida,

Thiruvananthapuram

8-13 Yrs

Not Disclosed

Sap Successfactors Consultant

Mumbai

7-12 Yrs

Not Disclosed

Explore more jobs
Deputy Manager
1.2k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
716 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
406 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
390 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Manager
365 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Tata Projects with

Larsen & Toubro Limited

4.0
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.0
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent