i
Tata Projects
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I was interviewed in Aug 2024.
Assignment details can include the purpose of the assignment, the student's progress, and the maximum file size for a submission. [1, 2, 3]
Assignment purpose [4]
• Description: A brief summary of the assignment's topic, length, and genre [4]
• Goals: What the assignment is meant to achieve and how it fits into the course's larger goals [3]
• Grading rubric: A set of criteria for evaluating the assignment [5]
Student progress [1]
• Assigned to: A list of students who are working on the assignment
• Student information: Each student's name, IP address, and last session data
• Growth: A comparison of the student's current course level to their starting level
• Skills tested: A chart that shows the student's performance on the assignment
• Progress: A graph that shows the student's progress over time
Submission details [2]
• Maximum file size: The largest file size that students can submit [2]
• Format: Whether the assignment is to be submitted in handwriting or typed [6]
• Margins: The size of the margins to be left on the assignment [6]
Generative AI is experimental.
[1] -----assignment_details.htm[2] -----Assignment_details[3] -----Teaching_resources/TLPDC_teaching_resources/CreatingEffectiveAssignments.php[4] -----[5] -----[6] -----.pdf
Not all images can be exported from Search.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 10 Sep 2017
I was interviewed before Sep 2016.
posted on 12 Oct 2020
I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.
posted on 18 Jan 2020
I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.
Maintain elevation of underground piping by using level instruments and proper installation techniques.
Use a level instrument to check the elevation of the piping during installation.
Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.
Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.
Consider using supports o...
In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.
Managed a team of employees and delegated tasks effectively
Handled customer complaints and resolved issues in a timely manner
Created and implemented strategies to improve efficiency and productivity
Collaborated with other departments to achieve company goals
Conducted performanc
Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.
Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.
Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.
Cast iron electrodes have a high nickel content to prevent cracking.
Aluminum electrodes have a special coating ...
posted on 12 May 2018
posted on 11 May 2018
I was interviewed before Mar 2020.
posted on 25 Mar 2022
I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.
posted on 23 Oct 2021
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
based on 1 interview
Interview experience
Deputy Manager
1.2k
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
718
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
406
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
388
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Manager
366
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Reliance Infrastructure
GMR Group
Hindustan Construction Company