Premium Employer

i

This company page is being actively managed by Tata Projects Team. If you also belong to the team, you can get access from here

Tata Projects Verified Tick

Compare button icon Compare button icon Compare

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Clear (1)

Tata Projects Production & Quality Engineer Interview Questions and Answers

Updated 20 Jul 2024

Tata Projects Production & Quality Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Reheating furnace all operation or mechanical .
  • Ans. 

    The operation and mechanical aspects of a reheating furnace are crucial for production and quality control.

    • Ensure all components of the reheating furnace are functioning properly to maintain consistent heating temperatures.

    • Regularly inspect and maintain the mechanical parts of the furnace to prevent breakdowns and ensure efficiency.

    • Monitor the operation of the furnace to optimize heating processes and minimize energy c...

  • Answered by AI
  • Q2. Hot stirp mill rolling mill operation mechanical
  • Q3. My senior or junior member talking any questions
Round 2 - One-on-one 

(2 Questions)

  • Q1. All Questions to steel plant related
  • Q2. Some questions safety related
Round 3 - Aptitude Test 

My manner , junior member talking and other

Interview Preparation Tips

Interview preparation tips for other job seekers - No thanks 👍

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Based on experience and problem faced in project site
  • Q2. Previous site experience and the benifits
  • Q3. Roles and responsibilities of self and the factors affecting company growth

Interview Preparation Tips

Interview preparation tips for other job seekers - don't join in this black hole it is just like company there are no projects for this company the culture is so worst.

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Details about your self.
Round 3 - Technical 

(1 Question)

  • Q1. Question from subject.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face interview with confidence. Interview process is very simple.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills

I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the roles and responsibilities of safety person as per the BOCW act
  • Ans. 

    The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.

    • Ensuring safety measures are in place at the worksite

    • Conducting safety inspections to identify potential hazards

    • Providing safety training to workers and management

    • Maintaining records of safety inspections and incidents

    • Ensuring compliance with safe...

  • Answered by AI
  • Q2. What are the roles and responsibilities of you in your current organization
Round 2 - HR 

(1 Question)

  • Q1. Salary expectation and other facilities required.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good organization feeling positive toward the company
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. What are the INDAS, you have worked on??
  • Ans. 

    I have worked on INDAS 115 and INDAS 116 in my previous role as a financial analyst.

    • Implemented INDAS 115 to recognize revenue from contracts with customers

    • Applied INDAS 116 to account for leases in financial statements

    • Ensured compliance with INDAS standards in financial reporting

    • Prepared financial statements following the guidelines of INDAS

  • Answered by AI
  • Q2. Indas -101,109 112
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Question about your current work and technical question of what they want in me
Round 2 - Technical 

(1 Question)

  • Q1. Case study like what action you take in this particular problem
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and document sharing
Contribute & help others!
anonymous
You can choose to be anonymous

Tata Projects Interview FAQs

How many rounds are there in Tata Projects Production & Quality Engineer interview?
Tata Projects interview process usually has 3 rounds. The most common rounds in the Tata Projects interview process are One-on-one Round, Aptitude Test and Technical.
What are the top questions asked in Tata Projects Production & Quality Engineer interview?

Some of the top questions asked at the Tata Projects Production & Quality Engineer interview -

  1. Reheating furnace all operation or mechanica...read more
  2. Hot stirp mill rolling mill operation mechani...read more
  3. My senior or junior member talking any questi...read more

Recently Viewed

REVIEWS

L&T Technology Services

No Reviews

INTERVIEWS

Ekart Logistics

No Interviews

REVIEWS

Virtusa Consulting Services

No Reviews

SALARIES

Bajaj Allianz Life Insurance

REVIEWS

L&T Technology Services

No Reviews

INTERVIEWS

Tata Projects

No Interviews

INTERVIEWS

Tata Projects

No Interviews

REVIEWS

Bajaj Allianz Life Insurance

No Reviews

REVIEWS

Virtusa Consulting Services

No Reviews

REVIEWS

L&T Technology Services

No Reviews

Tell us how to improve this page.

Tata Projects Production & Quality Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more
Join Tata Projects Simplify. Create.

Interview Questions from Similar Companies

KEC International Interview Questions
4.0
 • 300 Interviews
TCE Interview Questions
3.8
 • 248 Interviews
Saint-Gobain Interview Questions
4.0
 • 172 Interviews
Worley Interview Questions
4.1
 • 111 Interviews
View all
Deputy Manager
1.2k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
719 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
407 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
387 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Manager
367 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Tata Projects with

Larsen & Toubro Limited

4.0
Compare

Reliance Infrastructure

4.1
Compare

GMR Group

4.0
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent