Q1. How can we find unit weight of reinforcement bar?

Ans.

The unit weight of reinforcement bar can be found by calculating the weight per unit length.

  • The unit weight of reinforcement bar is calculated by dividing the weight of the bar by its length.

  • The weight of the bar can be determined by multiplying the cross-sectional area of the bar by the density of the material.

  • The length of the bar is measured in meters or feet, depending on the unit system used.

  • The density of the material can be obtained from reference tables or material sp...read more

Q2. Do you know how to calculate bar bending schedule?

Ans.

Yes, bar bending schedule is calculated by determining the number, length, and shape of bars required for a reinforced concrete structure.

  • Calculate the total length of bars required for each size and type

  • Determine the number of bars required for each size and type

  • Calculate the shape and bending details of each bar

  • Prepare a detailed schedule of all the bars required for the structure

  • Ensure compliance with design and construction standards

Q3. Unit weights of various building materials?

Ans.

Unit weights of building materials are important for quantity surveying.

  • Unit weight of concrete is around 2400 kg/m³

  • Unit weight of brick is around 1920 kg/m³

  • Unit weight of steel is around 7850 kg/m³

  • Unit weight of timber is around 500 kg/m³

  • Unit weight of glass is around 2500 kg/m³

Q4. What is procedure for billing?

Ans.

The procedure for billing involves preparing an invoice based on the work completed and submitting it to the client for payment.

  • Review the contract to ensure all work completed is billable

  • Prepare an invoice detailing the work completed and the corresponding costs

  • Submit the invoice to the client for payment within the agreed upon timeframe

  • Follow up with the client to ensure payment is received on time

Are these interview questions helpful?

Q5. Manpower productivity?

Ans.

Manpower productivity refers to the efficiency of workers in completing tasks within a given timeframe.

  • It is important to measure and track productivity to identify areas for improvement.

  • Factors that can affect productivity include training, equipment, and work environment.

  • Productivity can be improved through better planning, organization, and communication.

  • Examples of productivity measures include output per worker, time to complete tasks, and error rates.

  • Regular performance...read more

Q6. How to compute the BOQ.

Ans.

BOQ is computed by breaking down construction project into items, quantifying each item, and pricing them.

  • Break down the construction project into items based on drawings and specifications

  • Quantify each item by taking off quantities from drawings or using estimating software

  • Price each item by obtaining rates from suppliers or using historical data

  • Sum up the total cost of all items to get the Bill of Quantities

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. International Code of measurement

Ans.

The International Code of Measurement is a standard for measuring construction works globally.

  • The code provides guidelines for measuring and quantifying construction works.

  • It ensures consistency in measurement and helps avoid disputes.

  • It covers areas such as measurement of quantities, units of measurement, and presentation of measurements.

  • Examples of codes include SMM7, CESMM3, and POMI.

  • The code is used by quantity surveyors, contractors, and clients in the construction indus...read more

Q8. Any update survey

Ans.

An update survey is a follow-up survey conducted to gather new information or verify existing data.

  • Update surveys are typically conducted to assess changes in a project site or to verify previous survey data.

  • They may involve measuring new structures, boundaries, or features that were not included in the original survey.

  • Update surveys help ensure that project plans and estimates are accurate and up-to-date.

  • Examples of update surveys include checking for any new construction or...read more

Civil Quantity Surveyor Jobs

Civil Quantity Surveyor 3-5 years
WTP Cost Management
3.9
₹ 3 L/yr - ₹ 7 L/yr
Chennai
Civil Quantity Surveyor 5-7 years
WTP Cost Management
3.9
₹ 4 L/yr - ₹ 7 L/yr
Kolkata
Civil Quantity Surveyor 5-10 years
DPR Infra Projects Pvt. Ltd.
5.0
Hyderabad / Secunderabad
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

4.7
 • 3 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

Recently Viewed
LIST OF COMPANIES
Credit Bajaar
Overview
PHOTOS
InsuranceDekho
3 office photos
DESIGNATION
LIST OF COMPANIES
Bridgei2i Analytics Solutions
Overview
INTERVIEWS
GAVS Technologies
No Interviews
COMPANY BENEFITS
Bridgei2i Analytics Solutions
No Benefits
INTERVIEWS
Ecotech Software
No Interviews
INTERVIEWS
Hibiz Solutions
No Interviews
SALARIES
AVASO Technology Solutions
No Salaries
REVIEWS
Genpact
No Reviews
Civil Quantity Surveyor Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter