Filter interviews by
I applied via Company Website
The company is currently in a stable financial position with ongoing projects and a strong reputation in the industry.
Company has a strong financial position
Ongoing projects are in progress
Company has a good reputation in the industry
Employee growth refers to the development and advancement of an individual within their career.
Employee growth involves acquiring new skills and knowledge
It includes taking on more responsibilities and challenges
Career progression and promotions are indicators of employee growth
Action points at site level refer to specific tasks or activities that need to be completed on the construction site.
Action points are typically identified during site inspections or progress meetings.
They can include tasks such as resolving design issues, coordinating with subcontractors, or ensuring compliance with regulations.
Examples of action points could be revising drawings to address conflicts, obtaining necess...
I applied via LinkedIn and was interviewed in Jun 2024. There were 2 interview rounds.
Current CTC is $50,000 and expected CTC is $60,000.
Current CTC: $50,000
Expected CTC: $60,000
Reason for increase in expected CTC: Additional qualifications and experience gained since current CTC was set
I applied via Approached by Company and was interviewed in Jan 2024. There were 2 interview rounds.
The shape of project progress curve is typically an S-curve.
The project progress curve starts off slow as the project is initiated and planned.
It then accelerates as work is being executed and completed.
Finally, the curve levels off as the project nears completion and final tasks are finished.
The S-curve represents the typical pattern of project progress over time.
The expected salary for a Planning Manager position varies depending on factors such as location, company size, and level of experience.
Research typical salaries for Planning Managers in your area to determine a reasonable range
Consider your level of experience and qualifications when negotiating salary
Factor in benefits, bonuses, and other perks when evaluating a job offer
Yes, I have extensive experience using MS Project for project planning and management.
I have used MS Project to create project schedules, track progress, and allocate resources.
I am proficient in setting up dependencies, milestones, and critical paths in MS Project.
I have experience generating reports and analyzing data in MS Project.
I have used MS Project to collaborate with team members and stakeholders on project ti
posted on 9 Apr 2024
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
Currie & Brown interview questions for popular designations
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
A bank guarantee is a promise from a bank to cover a specific amount of debt or liability on behalf of a borrower.
It is a type of financial instrument used to mitigate risk in business transactions.
It is often required by parties engaging in international trade or construction projects.
The bank guarantee ensures that the beneficiary will receive payment if the borrower fails to fulfill their obligations.
Types of bank g...
The formula for duct areas is used to calculate the cross-sectional area of a duct.
The formula for rectangular ducts is A = l x w
The formula for circular ducts is A = πr²
The formula for oval ducts is A = πab/4
A represents the cross-sectional area of the duct
l represents the length of the duct
w represents the width of the duct
r represents the radius of the duct
a and b represent the major and minor axes of the oval duct
Rate analysis involves calculating the cost of different items in a construction project.
Rate analysis is used to estimate the cost of materials, labor, and equipment for each item in a project.
It involves breaking down the cost of each item into its components, such as the cost of materials, labor, and overhead.
Examples of items that require rate analysis include excavation, concrete work, electrical work, and plumbin...
Method of measurement and conversion factors are crucial for MEP Quantity Surveyor.
Understand the standard method of measurement for each product
Be aware of the conversion factors for different units of measurement
Use software tools to assist with calculations and conversions
Examples of units of measurement include square meters, cubic meters, and linear meters
I applied via Referral and was interviewed in May 2022. There were 3 interview rounds.
The International Code of Measurement is a standard for measuring construction works globally.
The code provides guidelines for measuring and quantifying construction works.
It ensures consistency in measurement and helps avoid disputes.
It covers areas such as measurement of quantities, units of measurement, and presentation of measurements.
Examples of codes include SMM7, CESMM3, and POMI.
The code is used by quantity sur...
I applied via Company Website and was interviewed in Jan 2021. There was 1 interview round.
Top trending discussions
I applied via LinkedIn and was interviewed in Nov 2024. There were 3 interview rounds.
Logic test and personality test
I am a sustainability consultant with a background in environmental science and experience in implementing sustainable practices.
Background in environmental science
Experience in implementing sustainable practices
Passionate about promoting sustainability in various industries
Passionate about promoting sustainable practices and making a positive impact on the environment.
Passionate about environmental conservation and sustainability
Believe in the importance of implementing sustainable practices in businesses
Excited about the opportunity to help organizations reduce their carbon footprint
Previous experience in sustainability projects or initiatives
I faced a challenge in my previous role when implementing a sustainability program for a large corporation.
Resistance from upper management to allocate resources for sustainability initiatives
Difficulty in engaging employees at all levels to participate in sustainability efforts
Lack of buy-in from stakeholders outside of the organization
Balancing short-term financial goals with long-term sustainability objectives
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.
It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.
Helps in estimating the quantity of steel required for construction.
Ensures proper placement and bending of reinforcement bars as per design specifications.
Used by contractors, engineers, and construction workers for re...
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.
28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing
It is important for assessing the quality of concrete and its ability to support structural loads
The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing
Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.
Mivan is faster and more efficient than conventional construction methods.
Mivan requires skilled labor for installation of aluminum formwork.
Conventional construction is more labor-intensive and time-consuming.
Mivan provides better quality finishes compared to conventional...
Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.
Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.
It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.
Self leveling concrete can be applied in thicknesses ranging from a featheredg...
The 1st Aluform mockup concreting typically takes 1-2 days to complete.
1-2 days is the usual timeframe for 1st Aluform mockup concreting
Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration
Proper planning and coordination can help expedite the process
based on 5 interviews
Interview experience
based on 67 reviews
Rating in categories
Quantity Surveyor
45
salaries
| ₹3.9 L/yr - ₹8 L/yr |
Senior Quantity Surveyor
40
salaries
| ₹5.4 L/yr - ₹10.5 L/yr |
Assistant Quantity Surveyor
21
salaries
| ₹2 L/yr - ₹5 L/yr |
MEP Quantity Surveyor
12
salaries
| ₹3.2 L/yr - ₹8 L/yr |
Associate
7
salaries
| ₹15.6 L/yr - ₹24.7 L/yr |
AECOM
ARCADIS
Gleeds
Hill International