The International Code of Measurement is a standard for measuring construction works globally.
The code provides guidelines for measuring and quantifying construction works.
It ensures consistency in measurement and helps avoid disputes.
It covers areas such as measurement of quantities, units of measurement, and presentation of measurements.
Examples of codes include SMM7, CESMM3, and POMI.
The code is used by quantity sur...
Top trending discussions
I was interviewed in Aug 2017.
I applied via Company Website and was interviewed before Feb 2021. There were 3 interview rounds.
posted on 8 Oct 2022
I was interviewed before Oct 2021.
PT slab refers to a post-tensioned slab, which is a type of reinforced concrete slab that uses high-strength steel tendons to provide additional strength and reduce cracking.
PT slab is a structural system commonly used in buildings and bridges.
It involves the use of steel tendons that are tensioned after the concrete has hardened.
The tendons are typically placed in a grid pattern and anchored at the ends of the slab.
Th...
Steel density is the measure of how much mass is contained in a given volume of steel.
Steel density is typically measured in kilograms per cubic meter (kg/m³).
The density of steel can vary depending on its composition and specific type.
For example, the density of carbon steel is around 7850 kg/m³.
Stainless steel, on the other hand, has a density of about 8000 kg/m³.
Density is an important property to consider in struct
Variation procedure involves documenting and managing changes to the scope of work in a construction project.
Variations should be documented in writing with clear details of the change.
Cost implications of variations should be assessed and agreed upon by all parties involved.
Variation procedure should be outlined in the contract to avoid disputes.
Regular communication and collaboration between the quantity surveyor, cl...
PC adjustment refers to the adjustment of the Preliminary Costs in a construction project.
PC adjustment involves reviewing and updating the initial cost estimates for items such as site preparation, temporary works, and design fees.
Changes in project scope, design modifications, or unforeseen site conditions may necessitate PC adjustments.
PC adjustments are typically made during the pre-construction phase to ensure acc...
I applied via Referral and was interviewed in Mar 2023. There were 2 interview rounds.
I am a quality engineer with experience in ensuring product quality and process improvement.
Experienced in implementing quality control measures
Proficient in statistical analysis and problem-solving
Skilled in conducting audits and inspections
Strong communication and interpersonal skills
Continuous learner and adaptable to change
I am currently working as a Quality Engineer at XYZ Company.
Responsible for ensuring product quality meets customer requirements and industry standards
Develop and implement quality control procedures and processes
Conduct audits and inspections to identify areas for improvement
Collaborate with cross-functional teams to resolve quality issues
Provide training and support to employees on quality-related topics
Bolt grade refers to the strength and hardness of a bolt. It is indicated by a number stamped on the head of the bolt.
Bolt grade is determined by the material and manufacturing process of the bolt.
Higher grade bolts are stronger and can withstand more stress.
Bolt grade is indicated by a number stamped on the head of the bolt, such as 8.8 or 10.9.
The first number indicates the ultimate tensile strength in MPa, while the...
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
Hydration is the process of providing adequate fluids to the body to maintain proper function.
Hydration is essential for overall health and well-being
It helps regulate body temperature, transport nutrients, and remove waste
Drinking water, consuming fruits and vegetables, and electrolyte-rich beverages are ways to stay hydrated
I applied via LinkedIn and was interviewed before Aug 2023. There was 1 interview round.
Seeking new challenges and opportunities for growth in my career.
Looking to expand my skill set and knowledge in a new environment
Interested in working on different projects and gaining diverse experience
Seeking a more collaborative and innovative work culture
Want to take on more responsibilities and advance my career
Environmental Impact Assessment (EIA) is a process to identify, predict, evaluate, and mitigate the environmental effects of a proposed project.
EIA is a systematic process that helps in decision-making by evaluating the potential impacts of a project on the environment.
It involves identifying potential environmental impacts, assessing their significance, and proposing measures to mitigate or eliminate them.
EIA consider...
based on 1 review
Rating in categories
Quantity Surveyor
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Quantity Surveyor
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Quantity Surveyor
21
salaries
| ₹0 L/yr - ₹0 L/yr |
MEP Quantity Surveyor
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate
7
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
ARCADIS
Gleeds
Hill International