I applied via Approached by Company and was interviewed in Jan 2024. There were 2 interview rounds.
The shape of project progress curve is typically an S-curve.
The project progress curve starts off slow as the project is initiated and planned.
It then accelerates as work is being executed and completed.
Finally, the curve levels off as the project nears completion and final tasks are finished.
The S-curve represents the typical pattern of project progress over time.
The expected salary for a Planning Manager position varies depending on factors such as location, company size, and level of experience.
Research typical salaries for Planning Managers in your area to determine a reasonable range
Consider your level of experience and qualifications when negotiating salary
Factor in benefits, bonuses, and other perks when evaluating a job offer
Yes, I have extensive experience using MS Project for project planning and management.
I have used MS Project to create project schedules, track progress, and allocate resources.
I am proficient in setting up dependencies, milestones, and critical paths in MS Project.
I have experience generating reports and analyzing data in MS Project.
I have used MS Project to collaborate with team members and stakeholders on project ti
Top trending discussions
I applied via Naukri.com and was interviewed in Dec 2021. There were 2 interview rounds.
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 3 interview rounds.
I was interviewed in Aug 2017.
Variation procedure involves documenting and managing changes to the scope of work in a construction project.
Variations should be documented in writing with clear details of the change.
Cost implications of variations should be assessed and agreed upon by all parties involved.
Variation procedure should be outlined in the contract to avoid disputes.
Regular communication and collaboration between the quantity surveyor, cl...
PC adjustment refers to the adjustment of the Preliminary Costs in a construction project.
PC adjustment involves reviewing and updating the initial cost estimates for items such as site preparation, temporary works, and design fees.
Changes in project scope, design modifications, or unforeseen site conditions may necessitate PC adjustments.
PC adjustments are typically made during the pre-construction phase to ensure acc...
posted on 30 Jul 2022
I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
The project life cycle is the series of phases a project goes through from initiation to closure.
Initiation: Define the project, identify stakeholders, and create a business case.
Planning: Develop a project plan, schedule, budget, and resource plan.
Execution: Implement the project plan, manage resources, and deliver the project.
Monitoring and Control: Track progress, manage changes, and ensure quality.
Closure: Close ou...
I interact with virtual teams on a daily basis and can join immediately.
I have experience working with virtual teams and understand the challenges and dynamics involved.
I use various communication tools and platforms to interact with virtual team members.
I prioritize regular check-ins and meetings to ensure effective collaboration and progress tracking.
I am comfortable with remote work and can adapt quickly to differen...
A Bill of Material (BOM) is a comprehensive list of raw materials, components, and assemblies required to manufacture a product.
Identify all the components required for the product
Determine the quantity of each component needed
List the components in a hierarchical order
Include part numbers, descriptions, and vendor information
Update the BOM as changes are made to the product design
Battery sizing involves determining the appropriate battery capacity for a given application. IEEE 1188 is the applicable standard.
Determine the power requirements of the application
Calculate the energy required over a given time period
Select a battery with sufficient capacity to meet the energy requirements
Consider factors such as temperature, discharge rate, and cycle life
IEEE 1188 provides guidelines for battery siz
Smart motorways help improve traffic flow, increase capacity, and enhance safety on highways.
Smart motorways use technology to monitor traffic flow and adjust speed limits to optimize traffic flow.
They can convert the hard shoulder into a running lane during peak traffic times to increase capacity.
Emergency refuge areas are strategically placed for drivers to use in case of breakdowns or emergencies, enhancing safety.
V...
Different types of crossing include level crossings, pedestrian crossings, and wildlife crossings.
Level crossings: where a railway line crosses a road at the same level, requiring barriers and warning signals for safety.
Pedestrian crossings: designated areas for pedestrians to safely cross roads, such as zebra crossings, pelican crossings, and pedestrian bridges.
Wildlife crossings: structures built over or under roads ...
based on 1 interview
Interview experience
Quantity Surveyor
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Quantity Surveyor
40
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Quantity Surveyor
21
salaries
| ₹0 L/yr - ₹0 L/yr |
MEP Quantity Surveyor
12
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate
7
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
ARCADIS
Gleeds
Hill International