Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by AtkinsRealis Team. If you also belong to the team, you can get access from here

AtkinsRealis Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

AtkinsRealis Project Manager Interview Questions and Answers

Updated 29 Mar 2024

AtkinsRealis Project Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. 1. What is your current role 2. Industry details

Project Manager Jobs at AtkinsRealis

View all

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Please explain the process/ project life cycle?
  • Ans. 

    The project life cycle is the series of phases a project goes through from initiation to closure.

    • Initiation: Define the project, identify stakeholders, and create a business case.

    • Planning: Develop a project plan, schedule, budget, and resource plan.

    • Execution: Implement the project plan, manage resources, and deliver the project.

    • Monitoring and Control: Track progress, manage changes, and ensure quality.

    • Closure: Close ou...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. How often you interact with virtual team and how soon you can join?
  • Ans. 

    I interact with virtual teams on a daily basis and can join immediately.

    • I have experience working with virtual teams and understand the challenges and dynamics involved.

    • I use various communication tools and platforms to interact with virtual team members.

    • I prioritize regular check-ins and meetings to ensure effective collaboration and progress tracking.

    • I am comfortable with remote work and can adapt quickly to differen...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - All study the process and practice followed in a project project initiation to closing of the project. Understand everyone expect that the concept is clear to candidate so that they can move forward with high level question and make mind on your candidature.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Major difference between Hrg and Lrg?
  • Ans. 

    HRG stands for Human Resource Group while LRG stands for Large Retail Group.

    • HRG focuses on managing human resources within an organization

    • LRG focuses on managing a large retail business

    • HRG deals with employee relations, recruitment, training, and development

    • LRG deals with sales, inventory management, customer service, and marketing

  • Answered by AI
  • Q2. How to perform transformer sizing
  • Ans. 

    Transformer sizing involves calculating the appropriate size of a transformer based on load requirements.

    • Determine the total load requirements in kVA

    • Consider the load factor and diversity factor

    • Calculate the transformer size based on the total load requirements

    • Ensure the transformer is rated for the appropriate voltage and frequency

    • Consult with a professional engineer if needed

  • Answered by AI
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me about yourself
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Only design related queries
Round 3 - HR 

(1 Question)

  • Q1. Only salary package discussed

Interview Preparation Tips

Interview preparation tips for other job seekers - Just stick to basic and you can crack the interview
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. How to design floating head assembly From pds
  • Ans. 

    Designing a floating head assembly involves considering various factors such as material selection, sealing mechanisms, and thermal expansion.

    • Select appropriate materials for the floating head assembly based on the application requirements.

    • Design effective sealing mechanisms to prevent leakage and ensure proper functioning.

    • Consider thermal expansion and contraction to accommodate temperature variations.

    • Ensure proper al...

  • Answered by AI
  • Q2. H2s service for pressure vessel
  • Ans. 

    H2S service for pressure vessel refers to the use of hydrogen sulfide in a pressure vessel.

    • H2S service involves the handling and containment of hydrogen sulfide gas in a pressure vessel.

    • Pressure vessels used in H2S service must be designed and constructed to withstand the corrosive effects of hydrogen sulfide.

    • Special materials and coatings may be required to prevent hydrogen sulfide from corroding the pressure vessel.

    • R...

  • Answered by AI
  • Q3. Different types of gasket
  • Ans. 

    Gaskets are mechanical seals used to prevent leakage between two surfaces. There are various types of gaskets available.

    • Sheet gaskets

    • Spiral wound gaskets

    • Ring gaskets

    • Metallic gaskets

    • Rubber gaskets

    • Cork gaskets

    • Non-asbestos gaskets

  • Answered by AI
  • Q4. Kamprofile and SpWd as per Asme

Interview Preparation Tips

Interview preparation tips for other job seekers - 4 people taking interview in worley Parsons including Hod and department manager

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Elaborate VT pump installation process step by step.. How many valves & types used in Raising main? Explain about Cooling Lubrication system.
  • Ans. 

    The VT pump installation process involves several steps. The raising main has multiple valves of different types. The cooling lubrication system is also important.

    • The VT pump installation process involves selecting the right location for the pump, preparing the foundation, and installing the pump.

    • The raising main typically has gate valves, check valves, and air release valves.

    • The cooling lubrication system is responsib...

  • Answered by AI
  • Q2. Why are you going to quit the current job?
  • Ans. 

    I am looking for new challenges and opportunities for growth.

    • Seeking new challenges and opportunities for growth

    • Wanting to expand my skill set and knowledge

    • Desire for a higher level of responsibility

    • Seeking a better work-life balance

    • Unsatisfied with the current work environment or company culture

  • Answered by AI
  • Q3. What is your salary expectation?
  • Ans. 

    I expect a competitive salary that reflects my experience and the responsibilities of the Assistant Manager role.

    • I am looking for a salary that is in line with industry standards and the level of responsibility associated with the Assistant Manager position.

    • I have researched the average salary range for Assistant Managers in this industry and location, and I believe my skills and experience warrant a salary within that...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Confident..
Be Genuine..
Listen each & every Qustion or case study & Explain properly as per practical conditions.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Related to field and years of experience
  • Q2. Salary,expectations,company requirements and commitment to work
  • Q3. They test your patience and response capability
Round 3 - Technical 

(2 Questions)

  • Q1. Cable laying and jointing knowledge
  • Q2. Related to field inspection and site acceptance

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well in advance irrespective of field too,they make ask different questions to check your capable to give better position other than applied.

I applied via Recruitment Consulltant and was interviewed in Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Aluminium formwork slab cycle, components, sqm work for per carpenters
  • Q2. How much sqm plastering done by Mason per day, concrete blocks sizes, workability, painting, gypsum work
  • Ans. 

    The amount of sqm plastering done by a Mason per day depends on various factors such as the size of concrete blocks, workability, painting, and gypsum work.

    • The size of concrete blocks can affect the amount of plastering done per day.

    • Workability of the plastering material can also affect the speed of work.

    • Painting and gypsum work can add to the time required for plastering.

    • It is difficult to give an exact number for the...

  • Answered by AI
  • Q3. Conventional shuttering, BBS, steel weight per metre, field test for steel
  • Q4. Field concrete tests, cement, grade of concrete
Round 3 - HR 

(1 Question)

  • Q1. Reason for job change, why should we hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil basics and site execution work to be have good knowledge

AtkinsRealis Interview FAQs

How many rounds are there in AtkinsRealis Project Manager interview?
AtkinsRealis interview process usually has 1 rounds. The most common rounds in the AtkinsRealis interview process are Technical.
How to prepare for AtkinsRealis Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at AtkinsRealis. The most common topics and skills that interviewers at AtkinsRealis expect are Project Management, Budgeting, Cash Flow, Civil Engineering and Monitoring.

Tell us how to improve this page.

AtkinsRealis Project Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
AtkinsRealis Project Manager Salary
based on 22 salaries
₹18 L/yr - ₹47 L/yr
55% more than the average Project Manager Salary in India
View more details

AtkinsRealis Project Manager Reviews and Ratings

based on 5 reviews

3.3/5

Rating in categories

3.1

Skill development

3.3

Work-life balance

3.5

Salary

2.8

Job security

3.1

Company culture

3.5

Promotions

2.8

Work satisfaction

Explore 5 Reviews and Ratings
Delivery Manager - Project Control

Bangalore / Bengaluru

15-20 Yrs

₹ 24-45 LPA

Delivery Manager - Project Information Management Systems

Bangalore / Bengaluru

15-20 Yrs

Not Disclosed

Explore more jobs
Assistant Engineer
258 salaries
unlock blur

₹4.6 L/yr - ₹12 L/yr

Graduate Engineer
215 salaries
unlock blur

₹3 L/yr - ₹8.5 L/yr

HR Analyst
111 salaries
unlock blur

₹3.6 L/yr - ₹7.8 L/yr

Design Engineer
100 salaries
unlock blur

₹6.3 L/yr - ₹24 L/yr

Assistant Lead Designer
97 salaries
unlock blur

₹6.2 L/yr - ₹14 L/yr

Explore more salaries
Compare AtkinsRealis with

L&T Construction

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Saint-Gobain

4.0
Compare

AECOM

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview