Delay analysis methods are used to determine the causes and impacts of project delays.
There are various methods of delay analysis such as Critical Path Method (CPM), Time Impact Analysis (TIA), Impacted As-Planned, and As-Built.
Each method has its own advantages and limitations, and the choice of method depends on the specific circumstances of the project.
CPM is a commonly used method that analyzes the project schedule...
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
Through a job posting on LinkedIn
Found job posting on LinkedIn
Researched company after seeing job posting
Connected with current employees on LinkedIn
Received referral from a friend or colleague
I have 8 years of experience working on high rise projects with contractor companies.
I have worked on multiple high rise projects ranging from 20 to 50 stories.
Managed structural design and construction of high rise buildings.
Collaborated with architects, contractors, and clients to ensure project success.
Asking about Experience like structure, finishing.
What is testing of Steel IS CODE
BILLING OF IS CODE
BBS IS CODE.
CMD IS CODE.
SAFETY HAZARD ANALYSIS.
CONSTRUCTION METHOD STATEMENT.
TYPES OF PLASTER
OUTER PLASTER THICKNESS.
INNER PLASTER THICKNESS.
Primavera P6 is a project management software used for planning, scheduling, and controlling projects.
Primavera P6 is widely used in industries such as construction, engineering, and manufacturing.
It allows users to create project schedules, allocate resources, track progress, and analyze project performance.
The software helps in optimizing project plans, identifying critical paths, and managing project risks.
Users can...
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
based on 3 reviews
Rating in categories
Quantity Surveyor
36
salaries
| ₹4 L/yr - ₹8.4 L/yr |
Civil Engineer
28
salaries
| ₹4.6 L/yr - ₹11.7 L/yr |
Manager Costing
26
salaries
| ₹8.4 L/yr - ₹14 L/yr |
Senior Quantity Surveyor
25
salaries
| ₹6.7 L/yr - ₹10.5 L/yr |
Assistant Costing Manager
18
salaries
| ₹7.6 L/yr - ₹12.1 L/yr |
Nasser S. Al Hajri Corporation
Bahwan Engineering
Tractebel
Leighton Contractors