BBS stands for Bill of Bills, which is a detailed list of materials needed for a project. It is prepared by estimating quantities and costs of materials.
Start by identifying all the materials required for the project
Estimate the quantities needed for each material based on project specifications
Determine the unit cost of each material and calculate the total cost for each item
Sum up the total costs to get the overall p...
Top trending discussions
posted on 23 Jul 2023
I applied via Walk-in and was interviewed in Jun 2023. There were 3 interview rounds.
based on 3 reviews
Rating in categories
Quantity Surveyor
34
salaries
| ₹4 L/yr - ₹8.4 L/yr |
Manager Costing
24
salaries
| ₹8.4 L/yr - ₹14 L/yr |
Senior Quantity Surveyor
23
salaries
| ₹6.2 L/yr - ₹10.5 L/yr |
Civil Engineer
20
salaries
| ₹5.2 L/yr - ₹9.6 L/yr |
Section Engineer
15
salaries
| ₹7.5 L/yr - ₹11.5 L/yr |
AECOM
Jacobs Engineering Group
Bechtel
Fluor Corporation