Upload Button Icon Add office photos

Turner Construction

Compare button icon Compare button icon Compare

Filter interviews by

Turner Construction Manager Costing Interview Questions and Answers

Updated 23 Jul 2023

Turner Construction Manager Costing Interview Experiences

1 interview found

Manager Costing Interview Questions & Answers

user image rajganesan p

posted on 23 Jul 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed in Jun 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About contracts related qtns
  • Q2. Cost related qtns and cost per sqft
Round 3 - HR 

(2 Questions)

  • Q1. Why want to shift or change the job
  • Q2. Where you see u I’m next 5 years

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Project related questions.
  • Q2. Scenario based technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview was technical . There were overall 3 rounds of interview , 2 technical and 1 hr.
The first technical was conducted by offshore lead and lasted around an hour
The second one involved manager ,senior manager from onshore along with lead and was completely technical.

I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. What do you want to do in 5 years
  • Q2. What is glass
  • Ans. 

    Glass is a solid, transparent material made by heating a mixture of silica and other materials.

    • Glass is a non-crystalline, amorphous solid

    • It is made by heating a mixture of silica, soda ash, and lime

    • It can be molded into various shapes and sizes

    • It is used in windows, mirrors, lenses, and containers

    • Different types of glass include tempered, laminated, and stained glass

  • Answered by AI
  • Q3. What is graphene
  • Ans. 

    Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.

    • It is the thinnest material known to man

    • It is a good conductor of electricity and heat

    • It is incredibly strong and flexible

    • It has potential applications in electronics, energy, and medicine

  • Answered by AI
  • Q4. What is your expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - Talk about the topic wher you are good at

I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.

Round 1 - Aptitude Test 

I received a video call link and in that link will get the accounting basic questions for that we have to answer after a beep.

Round 2 - Technical 

(1 Question)

  • Q1. It was all basic accounting question.mostly related to 12th standard c v raman book Friendly interviewers
Round 3 - HR 

(1 Question)

  • Q1. 5 min telephonic call with recruiter

Interview Preparation Tips

Interview preparation tips for other job seekers - Get yourself prepared with basic accounting questions and be confident
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Coding Test 

DSA questions mainly focusing on dynamic programming and Graphs

Round 2 - HR 

(2 Questions)

  • Q1. Tell me about yourself?
  • Ans. 

    I am a passionate software developer with experience in Java, Python, and web development.

    • Graduated with a degree in Computer Science

    • Worked on multiple projects using Java and Python

    • Familiar with web development technologies like HTML, CSS, and JavaScript

    • Strong problem-solving skills and ability to work in a team

  • Answered by AI
  • Q2. What are your strengths and weaknesses?
  • Ans. 

    My strengths include problem-solving skills and attention to detail. My weaknesses include a tendency to overthink and difficulty delegating tasks.

    • Strengths: problem-solving skills, attention to detail

    • Weaknesses: tendency to overthink, difficulty delegating tasks

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Jacobs Engineering Group Software Developer interview:
  • DSA
Interview preparation tips for other job seekers - Be confident and thats all
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. How to design floating head assembly From pds
  • Ans. 

    Designing a floating head assembly involves considering various factors such as material selection, sealing mechanisms, and thermal expansion.

    • Select appropriate materials for the floating head assembly based on the application requirements.

    • Design effective sealing mechanisms to prevent leakage and ensure proper functioning.

    • Consider thermal expansion and contraction to accommodate temperature variations.

    • Ensure proper al...

  • Answered by AI
  • Q2. H2s service for pressure vessel
  • Ans. 

    H2S service for pressure vessel refers to the use of hydrogen sulfide in a pressure vessel.

    • H2S service involves the handling and containment of hydrogen sulfide gas in a pressure vessel.

    • Pressure vessels used in H2S service must be designed and constructed to withstand the corrosive effects of hydrogen sulfide.

    • Special materials and coatings may be required to prevent hydrogen sulfide from corroding the pressure vessel.

    • R...

  • Answered by AI
  • Q3. Different types of gasket
  • Ans. 

    Gaskets are mechanical seals used to prevent leakage between two surfaces. There are various types of gaskets available.

    • Sheet gaskets

    • Spiral wound gaskets

    • Ring gaskets

    • Metallic gaskets

    • Rubber gaskets

    • Cork gaskets

    • Non-asbestos gaskets

  • Answered by AI
  • Q4. Kamprofile and SpWd as per Asme

Interview Preparation Tips

Interview preparation tips for other job seekers - 4 people taking interview in worley Parsons including Hod and department manager

Skills evaluated in this interview

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Only design related queries
Round 3 - HR 

(1 Question)

  • Q1. Only salary package discussed

Interview Preparation Tips

Interview preparation tips for other job seekers - Just stick to basic and you can crack the interview
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Major difference between Hrg and Lrg?
  • Ans. 

    HRG stands for Human Resource Group while LRG stands for Large Retail Group.

    • HRG focuses on managing human resources within an organization

    • LRG focuses on managing a large retail business

    • HRG deals with employee relations, recruitment, training, and development

    • LRG deals with sales, inventory management, customer service, and marketing

  • Answered by AI
  • Q2. How to perform transformer sizing
  • Ans. 

    Transformer sizing involves calculating the appropriate size of a transformer based on load requirements.

    • Determine the total load requirements in kVA

    • Consider the load factor and diversity factor

    • Calculate the transformer size based on the total load requirements

    • Ensure the transformer is rated for the appropriate voltage and frequency

    • Consult with a professional engineer if needed

  • Answered by AI

Interview Questionnaire 

5 Questions

  • Q1. Seismic design of building, criteria, type of checks in building with respect to seismic, analysis approach
  • Q2. Pile and foundation detail, structural system in building, shear wall, dual system implications
  • Q3. Steel structure- Class of section, connection detail, slender member design criteria
  • Q4. Building irregularities type
  • Q5. Nature of scope of work performed, understanding of coordination approach, software knowledge

Turner Construction Interview FAQs

How many rounds are there in Turner Construction Manager Costing interview?
Turner Construction interview process usually has 3 rounds. The most common rounds in the Turner Construction interview process are Resume Shortlist, Technical and HR.
How to prepare for Turner Construction Manager Costing interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Turner Construction. The most common topics and skills that interviewers at Turner Construction expect are Bar Bending Schedule, Client Billing, Medical Billing, PMC and Quantity Surveying.
What are the top questions asked in Turner Construction Manager Costing interview?

Some of the top questions asked at the Turner Construction Manager Costing interview -

  1. Cost related qtns and cost per s...read more
  2. About contracts related q...read more

Tell us how to improve this page.

Turner Construction Manager Costing Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 117 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
View all
Turner Construction Manager Costing Salary
based on 4 salaries
₹10 L/yr - ₹13 L/yr
At par with the average Manager Costing Salary in India
View more details

Turner Construction Manager Costing Reviews and Ratings

based on 4 reviews

4.3/5

Rating in categories

4.3

Skill development

4.6

Work-life balance

3.9

Salary

4.6

Job security

4.3

Company culture

3.9

Promotions

4.3

Work satisfaction

Explore 4 Reviews and Ratings
Quantity Surveyor
52 salaries
unlock blur

₹3 L/yr - ₹10.9 L/yr

MEP Manager
24 salaries
unlock blur

₹15 L/yr - ₹30 L/yr

Project Coordinator
24 salaries
unlock blur

₹6.2 L/yr - ₹14 L/yr

MEP Engineer
18 salaries
unlock blur

₹8.5 L/yr - ₹14 L/yr

Construction Management
15 salaries
unlock blur

₹11.9 L/yr - ₹25 L/yr

Explore more salaries
Compare Turner Construction with

Alstom Transportation

3.7
Compare

Saint-Gobain

4.0
Compare

AECOM

4.2
Compare

AtkinsRealis

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview