I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Excavation soil mass can be calculated by determining the volume of the soil and its density.
Calculate the volume of the excavation area by multiplying the length, width, and depth of the area.
Determine the density of the soil being excavated.
Multiply the volume of the excavation area by the density of the soil to get the excavation soil mass.
For example, if the excavation area is 10m x 5m x 2m and the soil density is ...
Top trending discussions
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
posted on 22 Feb 2022
I applied via Referral and was interviewed in Dec 2023. There was 1 interview round.
Hydration is the process of providing adequate fluids to the body to maintain proper function.
Hydration is essential for overall health and well-being
It helps regulate body temperature, transport nutrients, and remove waste
Drinking water, consuming fruits and vegetables, and electrolyte-rich beverages are ways to stay hydrated
posted on 23 Aug 2023
Response Surface Methodology (RSM) is a statistical technique used to model and analyze the relationship between a response variable and multiple input variables.
Design a set of experiments based on a factorial design
Collect data from the experiments
Fit a regression model to the data
Analyze the model to determine optimal input settings for the response variable
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Quantity Surveyor
52
salaries
| ₹3 L/yr - ₹10.9 L/yr |
MEP Manager
24
salaries
| ₹15 L/yr - ₹30 L/yr |
Project Coordinator
24
salaries
| ₹6.2 L/yr - ₹14 L/yr |
MEP Engineer
18
salaries
| ₹8.5 L/yr - ₹14 L/yr |
Construction Management
15
salaries
| ₹11.9 L/yr - ₹25 L/yr |
Alstom Transportation
Saint-Gobain
AECOM
AtkinsRealis