Turner Construction Document Controller Interview Questions and Answers

Updated 31 Jan 2025

Turner Construction Document Controller Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jan 2024.

Round 1 - HR 

(2 Questions)

  • Q1. General discussion for HR
  • Q2. General discussion regarding current salarie.
Round 2 - Technical 

(2 Questions)

  • Q1. It was related to EDMS
  • Q2. It was related to sharepoint documentation.

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Jun 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. What was your previous organization Which project you HV complete in your experience Why u want to change job

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confidence in interview

I applied via Naukri.com and was interviewed in Dec 2018. There were 6 interview rounds.

Interview Questionnaire 

6 Questions

  • Q1. Provide all the details to the HR which is mentioned on your resume exactly in the same way.
  • Q2. If you are a experienced candidate then the team whom will take your interview will ask most of the questions from your previous work. So answer them correctly.
  • Q3. Don't try to explain those questions which you don't know and didn't done in your previous company.
  • Q4. Don't try to be over smart in front of the recruiters..Whatever you don't know tell them frankly that I don't know.
  • Q5. Don't be hesitate and don't tell your weakness to them.. Tell your weakness in a way that it will not affect the company environment. E.g ...It is difficult for me to say no when somebody ask for help or ...
  • Q6. Don't criticize your previous job or previous Boss in front of them..

Interview Preparation Tips

Round: Resume Shortlist
Experience: First of all make your resume in a very simple and easy to understand by recruiters.The headline of your resume should be unique because there are millions of resume are available on the website and a recruiter is spending on an average 7 to 10 second on every resumes while they are going to shortlist resumes for interview. And post your resumes on genuine websites and always update it on a regular basis.

Round: Test
Experience: Be calm and answer all the questions perfectly.. Take your time. Don't get nervous. Be confident

General Tips: My manager took my interview two times. The first one was telephonic round for 40 minutes long in which he asked me everything which was mentioned on my resume about my job responsibilities in the previous companies. And the second on was 50 minutes long through webex invitation in which he gave me the access of his computer through internet and asked me sixteen questions to test my technical skills. I was able to solve 14 questions and in the rest two questions I told his that I had never done this ever in my life..if I will get the opportunity to work with your company I will learn how to do this.... Don't be frustrate...Keep patience.. Surely a company will hire you one day.
Skills: Autocad, Adobe Acrobat, MS office , Communication, Problem Solving, Presentation Skills, Time Management, Decision Making Skills
Duration: <1 week

I applied via Naukri.com and was interviewed in Jun 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What is the role and responsibilities of previous company
  • Q2. Detail description of project what you HV done in your job experience
  • Q3. How can you handle the project in precious time

Interview Preparation Tips

Interview preparation tips for other job seekers - Plz make confidence about your project experience
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Only design related queries
Round 3 - HR 

(1 Question)

  • Q1. Only salary package discussed

Interview Preparation Tips

Interview preparation tips for other job seekers - Just stick to basic and you can crack the interview
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Tell me about yourself
  • Q2. What you do daily
  • Q3. What is your package
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. How to design floating head assembly From pds
  • Ans. 

    Designing a floating head assembly involves considering various factors such as material selection, sealing mechanisms, and thermal expansion.

    • Select appropriate materials for the floating head assembly based on the application requirements.

    • Design effective sealing mechanisms to prevent leakage and ensure proper functioning.

    • Consider thermal expansion and contraction to accommodate temperature variations.

    • Ensure proper al...

  • Answered by AI
  • Q2. H2s service for pressure vessel
  • Ans. 

    H2S service for pressure vessel refers to the use of hydrogen sulfide in a pressure vessel.

    • H2S service involves the handling and containment of hydrogen sulfide gas in a pressure vessel.

    • Pressure vessels used in H2S service must be designed and constructed to withstand the corrosive effects of hydrogen sulfide.

    • Special materials and coatings may be required to prevent hydrogen sulfide from corroding the pressure vessel.

    • R...

  • Answered by AI
  • Q3. Different types of gasket
  • Ans. 

    Gaskets are mechanical seals used to prevent leakage between two surfaces. There are various types of gaskets available.

    • Sheet gaskets

    • Spiral wound gaskets

    • Ring gaskets

    • Metallic gaskets

    • Rubber gaskets

    • Cork gaskets

    • Non-asbestos gaskets

  • Answered by AI
  • Q4. Kamprofile and SpWd as per Asme

Interview Preparation Tips

Interview preparation tips for other job seekers - 4 people taking interview in worley Parsons including Hod and department manager

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. 1) Give your Introduction 2) Pre PO & Post PO 3) IDC 4) Redlining 6) Vender process 7) Engineering process 8) Role of Document Controller 9) Supplier Document Index 10) Master Document Index
  • Ans. 

    The document controller is responsible for managing and organizing documents throughout their lifecycle.

    • Introduction: Provide a brief overview of your background, experience, and skills relevant to the document controller role.

    • Pre PO & Post PO: Explain the processes and procedures involved in managing documents before and after purchase orders are issued.

    • IDC: Describe the importance of an Information and Document Contr...

  • Answered by AI
  • Q2. Difference between engineering and Vendor document
  • Ans. 

    Engineering documents are created by the engineering team while vendor documents are created by the vendor.

    • Engineering documents are created by the in-house engineering team while vendor documents are created by the vendor supplying the equipment or materials.

    • Engineering documents are used for design, construction, and operation of a project while vendor documents are used for procurement and quality control purposes.

    • E...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Major difference between Hrg and Lrg?
  • Ans. 

    HRG stands for Human Resource Group while LRG stands for Large Retail Group.

    • HRG focuses on managing human resources within an organization

    • LRG focuses on managing a large retail business

    • HRG deals with employee relations, recruitment, training, and development

    • LRG deals with sales, inventory management, customer service, and marketing

  • Answered by AI
  • Q2. How to perform transformer sizing
  • Ans. 

    Transformer sizing involves calculating the appropriate size of a transformer based on load requirements.

    • Determine the total load requirements in kVA

    • Consider the load factor and diversity factor

    • Calculate the transformer size based on the total load requirements

    • Ensure the transformer is rated for the appropriate voltage and frequency

    • Consult with a professional engineer if needed

  • Answered by AI

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Document controller work
  • Ans. 

    Document controllers manage the storage, organization, and retrieval of company documents.

    • Maintain document control procedures

    • Ensure documents are up-to-date and accurate

    • Manage document storage and retrieval systems

    • Coordinate with other departments to ensure document flow

    • Maintain confidentiality and security of documents

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Exeal ms office & other work in leptop any software working only 1St time hint give me

Turner Construction Interview FAQs

How many rounds are there in Turner Construction Document Controller interview?
Turner Construction interview process usually has 2 rounds. The most common rounds in the Turner Construction interview process are HR and Technical.
How to prepare for Turner Construction Document Controller interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Turner Construction. The most common topics and skills that interviewers at Turner Construction expect are Document Control, Document Management, EDMS and PMC.
What are the top questions asked in Turner Construction Document Controller interview?

Some of the top questions asked at the Turner Construction Document Controller interview -

  1. It was related to sharepoint documentati...read more
  2. General discussion regarding current salar...read more
  3. It was related to E...read more

Tell us how to improve this page.

Turner Construction Document Controller Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Saint-Gobain Interview Questions
4.0
 • 173 Interviews
AECOM Interview Questions
4.2
 • 117 Interviews
Worley Interview Questions
4.1
 • 113 Interviews
AtkinsRealis Interview Questions
3.9
 • 88 Interviews
View all
Turner Construction Document Controller Salary
based on 13 salaries
₹5.4 L/yr - ₹10.3 L/yr
43% more than the average Document Controller Salary in India
View more details

Turner Construction Document Controller Reviews and Ratings

based on 7 reviews

3.9/5

Rating in categories

3.0

Skill development

3.5

Work-life balance

3.5

Salary

3.0

Job security

3.0

Company culture

3.5

Promotions

3.0

Work satisfaction

Explore 7 Reviews and Ratings
Quantity Surveyor
52 salaries
unlock blur

₹3 L/yr - ₹10.9 L/yr

MEP Manager
24 salaries
unlock blur

₹15 L/yr - ₹30 L/yr

Project Coordinator
24 salaries
unlock blur

₹6.2 L/yr - ₹14 L/yr

MEP Engineer
18 salaries
unlock blur

₹8.5 L/yr - ₹14 L/yr

Construction Management
15 salaries
unlock blur

₹11.9 L/yr - ₹25 L/yr

Explore more salaries
Compare Turner Construction with

Alstom Transportation

3.7
Compare

Saint-Gobain

4.0
Compare

AECOM

4.2
Compare

AtkinsRealis

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview