Design Costing Engineer
Design Costing Engineer Interview Questions and Answers
Q1. What’s the target for Stamping cost for minimum tonnage?
The target for stamping cost for minimum tonnage is typically set based on the material, complexity of the part, and production volume.
Consider the material cost and type of material being used for stamping.
Evaluate the complexity of the part being stamped, as more complex parts may require higher tonnage and therefore higher costs.
Take into account the production volume, as higher volumes may allow for economies of scale and lower costs per part.
Utilize cost estimation tools...read more
Q2. What factors need to consider for Costing
Factors to consider for costing include materials, labor, overhead, profit margin, and market demand.
Materials cost - consider the cost of raw materials needed for production
Labor cost - factor in the cost of labor required to manufacture the product
Overhead cost - include overhead expenses such as utilities, rent, and equipment maintenance
Profit margin - determine the desired profit margin for the product
Market demand - assess the demand for the product to set pricing accord...read more
Q3. What’s costing how do you define?
Costing is the process of estimating the expenses involved in the design and production of a product.
Costing involves analyzing all the components and processes required to manufacture a product
It includes materials, labor, overhead costs, and any other expenses
Costing helps in determining the selling price of a product and ensuring profitability
Costing can vary based on the complexity of the design and the quantity of products being produced
Q4. What is a other cost, which of these
Other costs are indirect costs that cannot be directly traced to a specific product or service.
Other costs include overhead expenses such as rent, utilities, and administrative salaries.
These costs are necessary for the overall operation of the business but are not directly tied to a specific product.
Other costs are typically allocated to products or services based on a predetermined allocation method.
Examples of other costs include depreciation, insurance, and advertising ex...read more
Q5. How to calculate material cost
Material cost can be calculated by multiplying the quantity of material needed by its unit cost.
Determine the quantity of material needed for the project
Identify the unit cost of the material
Multiply the quantity by the unit cost to get the material cost
Consider any additional costs such as shipping or taxes
Q6. Calculate process cost
Process cost can be calculated by summing up all the costs incurred during the production process.
Identify all costs incurred during the production process, including direct materials, direct labor, and overhead costs.
Sum up the costs to get the total process cost.
For example, if direct materials cost $500, direct labor cost $300, and overhead cost $200, the process cost would be $1000.
Share interview questions and help millions of jobseekers 🌟
Design Costing Engineer Jobs
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month