Variation procedure involves documenting and managing changes to the scope of work in a construction project.
Variations should be documented in writing with clear details of the change.
Cost implications of variations should be assessed and agreed upon by all parties involved.
Variation procedure should be outlined in the contract to avoid disputes.
Regular communication and collaboration between the quantity surveyor, cl...
PC adjustment refers to the adjustment of the Preliminary Costs in a construction project.
PC adjustment involves reviewing and updating the initial cost estimates for items such as site preparation, temporary works, and design fees.
Changes in project scope, design modifications, or unforeseen site conditions may necessitate PC adjustments.
PC adjustments are typically made during the pre-construction phase to ensure acc...
Top trending discussions
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
posted on 22 Feb 2022
I applied via Approached by Company and was interviewed in Nov 2022. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
Through a job posting on LinkedIn
Found job posting on LinkedIn
Researched company after seeing job posting
Connected with current employees on LinkedIn
Received referral from a friend or colleague
I have 8 years of experience working on high rise projects with contractor companies.
I have worked on multiple high rise projects ranging from 20 to 50 stories.
Managed structural design and construction of high rise buildings.
Collaborated with architects, contractors, and clients to ensure project success.
Asking about Experience like structure, finishing.
What is testing of Steel IS CODE
BILLING OF IS CODE
BBS IS CODE.
CMD IS CODE.
SAFETY HAZARD ANALYSIS.
CONSTRUCTION METHOD STATEMENT.
TYPES OF PLASTER
OUTER PLASTER THICKNESS.
INNER PLASTER THICKNESS.
posted on 3 May 2023
I applied via Approached by Company and was interviewed before Jul 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.
Yes, I have extensive inspection experience in previous roles.
I have conducted regular inspections of equipment and facilities to ensure compliance with safety regulations.
I have experience in documenting inspection findings and recommending corrective actions.
I have trained team members on inspection procedures and standards.
I have worked closely with regulatory agencies during inspections.
I have experience in develop
I have worked in the CGD sector for 8 years, gaining experience in various roles and responsibilities.
I have 8 years of experience in the CGD sector
Started as a junior executive and progressed to higher positions
Managed teams and projects related to CGD operations
Implemented strategies to improve efficiency and customer satisfaction
Attended industry conferences and training programs to stay updated on latest trends
I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed in Feb 2022. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Quantity Surveyor
36
salaries
| ₹4 L/yr - ₹8.4 L/yr |
Civil Engineer
28
salaries
| ₹4.6 L/yr - ₹11.7 L/yr |
Manager Costing
26
salaries
| ₹8.4 L/yr - ₹14 L/yr |
Senior Quantity Surveyor
25
salaries
| ₹6.7 L/yr - ₹10.5 L/yr |
Assistant Costing Manager
18
salaries
| ₹7.6 L/yr - ₹12.1 L/yr |
Nasser S. Al Hajri Corporation
Bahwan Engineering
Tractebel
Leighton Contractors