PT slab refers to a post-tensioned slab, which is a type of reinforced concrete slab that uses high-strength steel tendons to provide additional strength and reduce cracking.
PT slab is a structural system commonly used in buildings and bridges.
It involves the use of steel tendons that are tensioned after the concrete has hardened.
The tendons are typically placed in a grid pattern and anchored at the ends of the slab.
Th...
Steel density is the measure of how much mass is contained in a given volume of steel.
Steel density is typically measured in kilograms per cubic meter (kg/m³).
The density of steel can vary depending on its composition and specific type.
For example, the density of carbon steel is around 7850 kg/m³.
Stainless steel, on the other hand, has a density of about 8000 kg/m³.
Density is an important property to consider in struct
Top trending discussions
I applied via Walk-in and was interviewed before Sep 2023. There were 2 interview rounds.
Through a job posting on LinkedIn
Found job posting on LinkedIn
Researched company after seeing job posting
Connected with current employees on LinkedIn
Received referral from a friend or colleague
I have 8 years of experience working on high rise projects with contractor companies.
I have worked on multiple high rise projects ranging from 20 to 50 stories.
Managed structural design and construction of high rise buildings.
Collaborated with architects, contractors, and clients to ensure project success.
Asking about Experience like structure, finishing.
What is testing of Steel IS CODE
BILLING OF IS CODE
BBS IS CODE.
CMD IS CODE.
SAFETY HAZARD ANALYSIS.
CONSTRUCTION METHOD STATEMENT.
TYPES OF PLASTER
OUTER PLASTER THICKNESS.
INNER PLASTER THICKNESS.
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
posted on 22 Feb 2022
posted on 8 Feb 2025
I have extensive experience in implementing QC procedures and conducting inspections as a Quality Control Inspector.
Developing and implementing QC procedures to ensure product quality
Conducting inspections and tests to identify defects or non-conformities
Documenting findings and reporting on quality issues
Collaborating with production teams to address quality concerns
Continuous improvement of QC processes based on feed
posted on 27 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down
The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.
Lapping length is usually 60 times the diameter of the steel rod
For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm
Lapping is done to ensure continuity and strength in the reinforcement
In Oman, commonly used footings include spread footings, strip footings, and raft footings.
Spread footings are used for individual columns or walls and distribute the load over a larger area.
Strip footings are continuous footings that support a line of columns or walls.
Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.
In Oman, due to the sandy soil conditions, de...
To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.
Use concrete mix to fill in the broken areas and level the floor.
Apply epoxy resin to seal cracks and strengthen the floor.
Consider using self-leveling compound for a smooth and even surface.
Ensure proper preparation and cleaning of the floor before applying any material.
Consult with a structural engineer
Concrete setting times can vary depending on factors like temperature and mix design.
Concrete typically sets within 24-48 hours, but continues to harden over time.
Factors affecting setting time include temperature, humidity, and mix design.
For example, in hot weather, concrete may set faster, while in cold weather it may take longer.
Accelerators or retarders can be added to the mix to adjust setting times as needed.
posted on 3 May 2023
based on 1 interview
Interview experience
based on 12 reviews
Rating in categories
Quantity Surveyor
36
salaries
| ₹4 L/yr - ₹8.4 L/yr |
Civil Engineer
28
salaries
| ₹4.6 L/yr - ₹11.7 L/yr |
Manager Costing
26
salaries
| ₹8.4 L/yr - ₹14 L/yr |
Senior Quantity Surveyor
25
salaries
| ₹6.7 L/yr - ₹10.5 L/yr |
Assistant Costing Manager
18
salaries
| ₹7.6 L/yr - ₹12.1 L/yr |
Nasser S. Al Hajri Corporation
Bahwan Engineering
Tractebel
Leighton Contractors