Filter interviews by
I applied via LinkedIn and was interviewed in Jun 2024. There were 2 interview rounds.
Yes, I have experience working on international projects in various countries.
Managed cost control and budgeting for a construction project in Dubai
Collaborated with international contractors and suppliers on a project in Singapore
Navigated different regulations and standards while working on a project in the UK
POMI stands for Principles of Measurement International, a standard method of measurement used in the construction industry.
POMI is a standard method of measurement used in the construction industry to measure quantities of building works.
It provides a consistent and transparent way of measuring construction works, aiding in accurate cost estimation and project planning.
POMI is often used in conjunction with other meas...
Current CTC is $50,000 and expected CTC is $60,000.
Current CTC: $50,000
Expected CTC: $60,000
Reason for increase in expected CTC: Additional qualifications and experience gained since current CTC was set
I applied via Company Website and was interviewed in Jan 2021. There was 1 interview round.
Top trending discussions
posted on 3 May 2024
I applied via Indeed and was interviewed in Apr 2024. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Mar 2022. There were 3 interview rounds.
Drawing study, output BOQ etc.
Face to face interview
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
Compressor troubleshooting involves identifying and resolving issues with the compressor in a system.
Check for leaks in the system
Inspect the compressor for damage or wear
Check the electrical connections and wiring
Monitor the pressure and temperature readings
Clean or replace air filters
Check the oil level and quality
Inspect the belts and pulleys for wear or damage
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
posted on 13 Sep 2022
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed in Apr 2024. There was 1 interview round.
I am from a small town in the Midwest and I am passionate about environmental conservation.
I grew up in a close-knit community in the Midwest
I have always been interested in protecting the environment
I enjoy outdoor activities like hiking and gardening
I have a Bachelor's degree in Computer Science from XYZ University.
Bachelor's degree in Computer Science
Graduated from XYZ University
Specialized in software development
posted on 15 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
posted on 12 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Senior Quantity Surveyor
42
salaries
| ₹5.4 L/yr - ₹10.5 L/yr |
Quantity Surveyor
41
salaries
| ₹3.9 L/yr - ₹8 L/yr |
Assistant Quantity Surveyor
21
salaries
| ₹2 L/yr - ₹5 L/yr |
MEP Quantity Surveyor
11
salaries
| ₹3.2 L/yr - ₹7.7 L/yr |
Associate
7
salaries
| ₹15.6 L/yr - ₹24.7 L/yr |
The Louis Berger Group
Nesma & Partners
El Seif Engineering Contracting
Perkins