Upload Button Icon Add office photos

Filter interviews by

Som Projects (S.P.L) Interview Questions, Process, and Tips

Updated 5 Jul 2024

Top Som Projects (S.P.L) Interview Questions and Answers

View all 6 questions

Som Projects (S.P.L) Interview Experiences

Popular Designations

9 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. She asked about my qualifications,experience, resion to company leave and CTC.
Round 2 - Technical 

(1 Question)

  • Q1. About Billing and Site execution
Round 3 - Technical 

(1 Question)

  • Q1. How to prepare Bill and ask more questions from measurement.
  • Ans. 

    To prepare a bill and ask more questions from measurement, one must accurately measure quantities, apply appropriate rates, and ensure all work is accounted for.

    • Accurately measure quantities of work done

    • Apply appropriate rates for each item of work

    • Ensure all work done is accounted for in the bill

    • Ask detailed questions about the measurements to clarify any discrepancies or uncertainties

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep patience and Believe your skills.

Civil Billing Engineer Interview Questions asked at other Companies

Q1. Why reinforcement is provided to concrete
View answer (2)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. What is your current job in your present company?
Round 2 - Technical 

(2 Questions)

  • Q1. What is plaster measurement deduction criteria?
  • Ans. 

    Plaster measurement deduction criteria refers to the standard guidelines used to calculate the deduction for plastering work in construction projects.

    • Deductions are made for openings such as doors, windows, and ducts in the plastered area.

    • The deduction criteria may vary based on the type of plastering material used and the specifications of the project.

    • Common deduction percentages range from 5% to 10% for openings in p...

  • Answered by AI
  • Q2. What if the quantity executed excess the BOQ quantity?
  • Ans. 

    The excess quantity executed beyond the BOQ quantity needs to be documented and approved by the client before billing.

    • Document the excess quantity separately from the original BOQ quantity

    • Seek approval from the client for the excess quantity before including it in the billing

    • Adjust the billing amount accordingly based on the approved excess quantity

    • Maintain clear communication with the client regarding the excess quant

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical knowledge related to your job profile and english communication skill should be good.

Billing Engineer Interview Questions asked at other Companies

Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.
View answer (9)

MEP Engineer Interview Questions & Answers

user image Anonymous

posted on 4 Mar 2024

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I was interviewed in Mar 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Electrical engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - MEP engineer construction company

MEP Engineer Interview Questions asked at other Companies

Q1. Work method statement of slab conduiting, Plumbing pipe installation, Fire Fighting pipe installation.
View answer (4)
Interview experience
3
Average
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about Yourself & Way of Work
  • Q2. Why would be Hire You

Interview Preparation Tips

Interview preparation tips for other job seekers - Should be knowledge of Account & Trial Balance & Balance Sheet

Senior Accountant Interview Questions asked at other Companies

Q1. Tell me about your self tax,
View answer (22)

Som Projects (S.P.L) interview questions for popular designations

 Billing Engineer

 (2)

 Civil Billing Engineer

 (1)

 Civil Engineer

 (1)

 Civil Foreman

 (1)

 Estimation & Billing Engineer

 (1)

 MEP Engineer

 (1)

 Project Engineer - Civil

 (1)

 Senior Accountant

 (1)

Civil Foreman Interview Questions & Answers

user image Anonymous

posted on 18 Jul 2022

I applied via Approached by Company and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. Steel binding, measurement, quantity, Finishing
  • Q2. Finishing work, Shuttering
  • Q3. Shuttering, steel binding
  • Q4. Steel binding, shuttering
  • Q5. Steel binding shuttering
Round 3 - One-on-one 

(3 Questions)

  • Q1. Steel binding, shuttering, Finishing
  • Q2. Shuttering, finishing
  • Q3. Finishing, Shuttering, Steel binding

Interview Preparation Tips

Interview preparation tips for other job seekers - My attitude is positive, I am hardworking too, I keep good behavior with people.

Civil Foreman Interview Questions asked at other Companies

Q1. How do prepare bbs. Shuttering work prosses , RCC and pqc work, lay out, DPR, and quantity .
View answer (1)

I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. 1. Which code follows for measurements as per cpwd specifications.?
  • Ans. 

    The code that follows for measurements as per CPWD specifications is CPWD-6.

    • CPWD-6 is the code used for measurements as per CPWD (Central Public Works Department) specifications.

    • It provides guidelines for measurement and billing of various construction activities.

    • CPWD-6 includes detailed instructions on how to measure and quantify different items of work in construction projects.

    • It helps in ensuring uniformity and stan...

  • Answered by AI
  • Q2. 2. How to measure centering and shuttering after 3.5m slab level?
  • Ans. 

    Centering and shuttering can be measured after 3.5m slab level using various methods.

    • Use measuring tape to measure the distance between the slab level and the centering or shuttering

    • Check the alignment and levelness of the centering and shuttering using a spirit level

    • Inspect the quality of the materials used for centering and shuttering

    • Ensure proper bracing and support for the centering and shuttering

    • Consider any addit...

  • Answered by AI
  • Q3. 3. Unit of granite measurements
  • Ans. 

    The unit of granite measurements is typically square feet or square meters.

    • The most common unit of measurement for granite is square feet.

    • In some countries, square meters may be used as the unit of measurement.

    • Granite slabs are often sold by the square foot or square meter.

    • When estimating or billing for granite, it is important to accurately measure the area to determine the quantity needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - During the interview don't panic if you are confident you are definately selected.

Estimation & Billing Engineer Interview Questions asked at other Companies

Q1. 1. Which IS codes followed for Mode of Measurement ? 2. What is BOQ ? 3. What is Escalation ? 4. What is Extra Item ? 5. Document submitted with Client Bill ? 6. BBS Calculaion of a Stair Case.
View answer (3)

Jobs at Som Projects (S.P.L)

View all

I applied via Walk-in and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Im interested civil work mentions
  • Q2. I will do my best i intrested in civil work Site mentions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company i will joining i have a experienc civil Engineer department

Civil Engineer Interview Questions asked at other Companies

Q1. What is the curing formalities for our precast segment???
View answer (20)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. All civil work structural QUALITY CONTROL, PLUMBING WORK ETC.
  • Q2. Fire fighting and mechnical erection and fabrication work
Round 3 - Group Discussion 

Departmental work labor programing and planning etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - My knowledge of BBS, TREMIX, FINISHING WORK, PLUMBING WORK, QUALITY CONTROL WORK ETC.

Project Engineer - Civil Interview Questions asked at other Companies

Q1. 15 days Program sheet for Steel qty of 850 sqft, slab area, 60 columns of size 600×300 mm and 3.0 m height, 30 Mt steel & Steel shuttering.
View answer (2)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. What are your salary expectations?
  • Q2. Why are you looking for a change?
  • Q3. What are your strengths and weaknesses?
  • Q4. Tell me about yourself.
Round 3 - Technical 

Billing Engineer Interview Questions asked at other Companies

Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.
View answer (9)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Aptitude Test 

Quantitative reasoning

Round 2 - One-on-one 

(5 Questions)

  • Q1. About yourself and past experiences.
  • Q2. Managerial round
  • Q3. About company information
  • Q4. About yourself and extracurricular activities
  • Q5. See yourself in the next 5 yrs

Interview Preparation Tips

Interview preparation tips for other job seekers - be prepared for questions.

Som Projects (S.P.L) Interview FAQs

How many rounds are there in Som Projects (S.P.L) interview?
Som Projects (S.P.L) interview process usually has 2-3 rounds. The most common rounds in the Som Projects (S.P.L) interview process are Technical, Resume Shortlist and HR.
How to prepare for Som Projects (S.P.L) interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Som Projects (S.P.L). The most common topics and skills that interviewers at Som Projects (S.P.L) expect are Accounting, Estimation, Construction, Planning and Project Management.
What are the top questions asked in Som Projects (S.P.L) interview?

Some of the top questions asked at the Som Projects (S.P.L) interview -

  1. 2. How to measure centering and shuttering after 3.5m slab lev...read more
  2. 1. Which code follows for measurements as per cpwd specification...read more
  3. What if the quantity executed excess the BOQ quanti...read more

Tell us how to improve this page.

Som Projects (S.P.L) Interview Process

based on 3 interviews in last 1 year

Interview experience

4.3
  
Good

People are getting interviews through

based on 6 Som Projects (S.P.L) interviews
Job Portal
WalkIn
Referral
50%
17%
17%
16% candidates got the interview through other sources.
Moderate Confidence
?
Moderate Confidence means the data is based on a sufficient number of responses received from the candidates

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.2k Interviews
Infosys Interview Questions
3.7
 • 7.5k Interviews
Wipro Interview Questions
3.7
 • 5.5k Interviews
Tech Mahindra Interview Questions
3.6
 • 3.8k Interviews
Adani Group Interview Questions
3.9
 • 177 Interviews
BHEL Interview Questions
4.2
 • 103 Interviews
View all

Som Projects (S.P.L) Reviews and Ratings

based on 108 reviews

3.6/5

Rating in categories

3.7

Skill development

3.5

Work-Life balance

3.5

Salary & Benefits

3.3

Job Security

3.5

Company culture

3.4

Promotions/Appraisal

3.5

Work Satisfaction

Explore 108 Reviews and Ratings
Billing Engineer

Pune

8-10 Yrs

₹ 5-7 LPA

Quality Engineer

Pune

8-10 Yrs

₹ 5-7 LPA

Safety Officer

Bhubaneshwar,

Cuttack

3-7 Yrs

₹ 2-3.5 LPA

Explore more jobs
Civil Site Engineer
36 salaries
unlock blur

₹2 L/yr - ₹5.5 L/yr

Site Engineer
16 salaries
unlock blur

₹2.4 L/yr - ₹5.5 L/yr

Senior Accountant
14 salaries
unlock blur

₹3.5 L/yr - ₹9.6 L/yr

Accountant
14 salaries
unlock blur

₹3 L/yr - ₹8.4 L/yr

Civil Foreman
14 salaries
unlock blur

₹2.8 L/yr - ₹4.2 L/yr

Explore more salaries
Compare Som Projects (S.P.L) with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

Hindustan Construction Company

4.2
Compare

Adani Group

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview