Q1. 2. How to measure centering and shuttering after 3.5m slab level?

Ans.

Centering and shuttering can be measured after 3.5m slab level using various methods.

  • Use measuring tape to measure the distance between the slab level and the centering or shuttering

  • Check the alignment and levelness of the centering and shuttering using a spirit level

  • Inspect the quality of the materials used for centering and shuttering

  • Ensure proper bracing and support for the centering and shuttering

  • Consider any additional factors such as load-bearing capacity and safety mea...read more

View 4 more answers

Q2. 1. Which code follows for measurements as per cpwd specifications.?

Ans.

The code that follows for measurements as per CPWD specifications is CPWD-6.

  • CPWD-6 is the code used for measurements as per CPWD (Central Public Works Department) specifications.

  • It provides guidelines for measurement and billing of various construction activities.

  • CPWD-6 includes detailed instructions on how to measure and quantify different items of work in construction projects.

  • It helps in ensuring uniformity and standardization in measurement and billing processes.

  • For examp...read more

View 2 more answers

Q3. 3. Unit of granite measurements

Ans.

The unit of granite measurements is typically square feet or square meters.

  • The most common unit of measurement for granite is square feet.

  • In some countries, square meters may be used as the unit of measurement.

  • Granite slabs are often sold by the square foot or square meter.

  • When estimating or billing for granite, it is important to accurately measure the area to determine the quantity needed.

View 3 more answers

Q4. What if the quantity executed excess the BOQ quantity?

Ans.

The excess quantity executed beyond the BOQ quantity needs to be documented and approved by the client before billing.

  • Document the excess quantity separately from the original BOQ quantity

  • Seek approval from the client for the excess quantity before including it in the billing

  • Adjust the billing amount accordingly based on the approved excess quantity

  • Maintain clear communication with the client regarding the excess quantity and billing process

Add your answer
Discover ATC Telecom Infrastructure interview dos and don'ts from real experiences

Q5. How to prepare Bill and ask more questions from measurement.

Ans.

To prepare a bill and ask more questions from measurement, one must accurately measure quantities, apply appropriate rates, and ensure all work is accounted for.

  • Accurately measure quantities of work done

  • Apply appropriate rates for each item of work

  • Ensure all work done is accounted for in the bill

  • Ask detailed questions about the measurements to clarify any discrepancies or uncertainties

Add your answer

Q6. What is plaster measurement deduction criteria?

Ans.

Plaster measurement deduction criteria refers to the standard guidelines used to calculate the deduction for plastering work in construction projects.

  • Deductions are made for openings such as doors, windows, and ducts in the plastered area.

  • The deduction criteria may vary based on the type of plastering material used and the specifications of the project.

  • Common deduction percentages range from 5% to 10% for openings in plastered surfaces.

  • Accurate measurement and calculation of ...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at ATC Telecom Infrastructure

based on 3 interviews in the last 1 year
Interview experience
4.3
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Interview Questions from Similar Companies

4.0
 • 689 Interview Questions
3.9
 • 201 Interview Questions
4.0
 • 174 Interview Questions
3.5
 • 167 Interview Questions
4.1
 • 132 Interview Questions
View all
Top Som Projects (S.P.L) Interview Questions And Answers
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter