Q1. 2. How to measure centering and shuttering after 3.5m slab level?
Centering and shuttering can be measured after 3.5m slab level using various methods.
Use measuring tape to measure the distance between the slab level and the centering or shuttering
Check the alignment and levelness of the centering and shuttering using a spirit level
Inspect the quality of the materials used for centering and shuttering
Ensure proper bracing and support for the centering and shuttering
Consider any additional factors such as load-bearing capacity and safety mea...read more
Q2. 1. Which code follows for measurements as per cpwd specifications.?
The code that follows for measurements as per CPWD specifications is CPWD-6.
CPWD-6 is the code used for measurements as per CPWD (Central Public Works Department) specifications.
It provides guidelines for measurement and billing of various construction activities.
CPWD-6 includes detailed instructions on how to measure and quantify different items of work in construction projects.
It helps in ensuring uniformity and standardization in measurement and billing processes.
For examp...read more
Q3. 3. Unit of granite measurements
The unit of granite measurements is typically square feet or square meters.
The most common unit of measurement for granite is square feet.
In some countries, square meters may be used as the unit of measurement.
Granite slabs are often sold by the square foot or square meter.
When estimating or billing for granite, it is important to accurately measure the area to determine the quantity needed.
Q4. What if the quantity executed excess the BOQ quantity?
The excess quantity executed beyond the BOQ quantity needs to be documented and approved by the client before billing.
Document the excess quantity separately from the original BOQ quantity
Seek approval from the client for the excess quantity before including it in the billing
Adjust the billing amount accordingly based on the approved excess quantity
Maintain clear communication with the client regarding the excess quantity and billing process
Q5. How to prepare Bill and ask more questions from measurement.
To prepare a bill and ask more questions from measurement, one must accurately measure quantities, apply appropriate rates, and ensure all work is accounted for.
Accurately measure quantities of work done
Apply appropriate rates for each item of work
Ensure all work done is accounted for in the bill
Ask detailed questions about the measurements to clarify any discrepancies or uncertainties
Q6. What is plaster measurement deduction criteria?
Plaster measurement deduction criteria refers to the standard guidelines used to calculate the deduction for plastering work in construction projects.
Deductions are made for openings such as doors, windows, and ducts in the plastered area.
The deduction criteria may vary based on the type of plastering material used and the specifications of the project.
Common deduction percentages range from 5% to 10% for openings in plastered surfaces.
Accurate measurement and calculation of ...read more
Top HR Questions asked in ATC Telecom Infrastructure
Interview Process at ATC Telecom Infrastructure
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month