Upload Button Icon Add office photos

URC Construction

Compare button icon Compare button icon Compare

Filter interviews by

URC Construction Assistant General Manager Execution Interview Questions and Answers

Updated 30 Aug 2024

URC Construction Assistant General Manager Execution Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. About work procedures
  • Q2. Resources arrangements.
Round 2 - Assignment 

Site administrative.

Round 3 - Assignment 

Cost and budget and agreed timeline.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company. But working style very hard.

Interview questions from similar companies

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention

I applied via Naukri.com and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality checking methods
  • Q2. Design reviews checking.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and answers only technically.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. RCC & Steel design related questions.
Round 3 - HR 

(1 Question)

  • Q1. CTC RELATED . Tall me about your self.

Interview Preparation Tips

Interview preparation tips for other job seekers - It a good organisation .
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. About blasting process
  • Q2. About painting quantity
  • Q3. Material management
  • Q4. About Working skills
  • Q5. Technical question related painting and blasting work

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Will ask all related questions.
  • Q2. Do u know Piping engineering?
  • Ans. 

    Yes, I have knowledge in Piping engineering.

    • I have a degree in Mechanical Engineering which includes coursework in Piping design and analysis.

    • I have practical experience working on piping projects in my previous roles.

    • I am familiar with industry standards and codes related to piping engineering such as ASME B31.3 and API 570.

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Expectation of salary, why job switch.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Introduction about yourself
  • Ans. I'm answering Smoothly about my self
  • Answered Anonymously
Round 2 - Technical 

(1 Question)

  • Q1. Technical Questions Like 1- Estimation and Costing 2- Rate Analysis 3- Planning and Praposal 4- Vendor Selection and Database 6- What do you mean by Hydrocarbon
Round 3 - Assignment 

1- Material Calculation
2- Bar bending Schedule
3- Planning and Chart
4- Making Praposal

Interview Preparation Tips

Interview preparation tips for other job seekers - 1- Special thing is that you should speak in English and be Confident.
2- Learn that before you to interview about which post you choose etc.
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical profile related questions working experience wise quality
Round 3 - HR 

(1 Question)

  • Q1. Document verification sallary bank statement sallary discussion
Round 4 - Behavioral 

(1 Question)

  • Q1. Know about you and work education femily and other
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. Difference between Extra Dose and cable stay bridge.
  • Ans. 

    Extra Dose bridge has additional support structures while cable stay bridge uses cables to support the bridge deck.

    • Extra Dose bridge has additional piers or columns for support.

    • Cable stay bridge uses cables attached to towers to support the bridge deck.

    • Extra Dose bridge is more common for shorter spans while cable stay bridge is used for longer spans.

    • Cable stay bridges have a more modern and sleek appearance compared t

  • Answered by AI
  • Q2. Why u want to leave your current company
  • Q3. Types of contract.
  • Ans. 

    Types of contracts include express, implied, unilateral, bilateral, and voidable contracts.

    • Express contract: Clearly stated terms and conditions, either written or verbal.

    • Implied contract: Terms inferred from the actions or conduct of the parties involved.

    • Unilateral contract: One party makes a promise in exchange for the performance of an act by the other party.

    • Bilateral contract: Both parties exchange promises to perf...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Apco Infratech Assistant Manager interview:
  • Detail structure
  • Highways
  • SAP
  • Primavera
  • MSP
  • Client Billing
  • Sub Contractor Billing
Interview preparation tips for other job seekers - Overall APCO INFRASTRUCTURE is a good growing company. Slary is credited in time. Only staff welfare are not good.

I applied via Company Website and was interviewed in Mar 2021. There were 5 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Realted work
  • Q2. IS code amendments
  • Q3. Lab tests And relevant is codes
  • Q4. Feild tests and relevant IS codes
  • Q5. QMS - Breifing

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well and go through your resume prior to interview.Fake it but atleast have technical knowledge

URC Construction Interview FAQs

How many rounds are there in URC Construction Assistant General Manager Execution interview?
URC Construction interview process usually has 3 rounds. The most common rounds in the URC Construction interview process are Assignment and Technical.
What are the top questions asked in URC Construction Assistant General Manager Execution interview?

Some of the top questions asked at the URC Construction Assistant General Manager Execution interview -

  1. Resources arrangemen...read more
  2. About work procedu...read more

Tell us how to improve this page.

URC Construction Assistant General Manager Execution Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 120 Interviews
Apco Infratech Interview Questions
3.7
 • 117 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 61 Interviews
Psp Projects Interview Questions
3.9
 • 53 Interviews
View all
Assistant Engineer
196 salaries
unlock blur

₹1.8 L/yr - ₹5.5 L/yr

Senior Engineer
131 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Assistant Engineer - Civil
61 salaries
unlock blur

₹2.4 L/yr - ₹5.7 L/yr

Assistant Manager
48 salaries
unlock blur

₹4.6 L/yr - ₹9.9 L/yr

Planning Engineer
40 salaries
unlock blur

₹1.1 L/yr - ₹7 L/yr

Explore more salaries
Compare URC Construction with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Apco Infratech

3.7
Compare

Saipem

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview