Upload Button Icon Add office photos

URC Construction

Compare button icon Compare button icon Compare

Filter interviews by

URC Construction Site Engineer Interview Questions and Answers

Updated 20 Aug 2024

URC Construction Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 20 Aug 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. About u r self
  • Q2. What is cement and explain about it
  • Ans. 

    Cement is a binding material used in construction to hold together bricks, stones, and other materials.

    • Cement is a fine powder made from limestone, clay, and other minerals.

    • When mixed with water, cement forms a paste that hardens and binds materials together.

    • Common types of cement include Portland cement, which is used in most construction projects.

    • Cement is a key ingredient in concrete, mortar, and grout.

    • Proper curing...

  • Answered by AI

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Why are you looking for a change?
  • Q2. What are your salary expectations?
  • Q3. Why should we hire you?
Round 3 - One-on-one 

(1 Question)

  • Q1. What you know about core?
  • Ans. 

    Core is the central part of a structure or object that provides strength and stability.

    • Core is commonly used in construction and engineering.

    • It is the central part of a building or structure that provides support and stability.

    • In fitness, core refers to the muscles in the abdomen, back, and pelvis that support the spine.

    • Examples of core materials include concrete, steel, and wood.

    • A strong core is important for maintain

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident on what you know.

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. What is production?
  • Ans. 

    Production refers to the process of creating goods or services using resources and labor.

    • Production involves transforming raw materials into finished products or providing services to customers.

    • It includes activities such as manufacturing, assembly, packaging, and distribution.

    • Examples of production include car manufacturing, food processing, and software development.

    • Efficient production is essential for businesses to

  • Answered by AI

Interview Questionnaire 

3 Questions

  • Q1. Coke oven and blast furnace technical lining questions
  • Q2. Site management cost control
  • Q3. How to Time saving
  • Ans. 

    Time saving can be achieved by optimizing processes, using technology, delegating tasks, and setting priorities.

    • Optimize processes to eliminate inefficiencies and reduce wasted time

    • Utilize technology tools to automate repetitive tasks and streamline workflows

    • Delegate tasks to team members to distribute workload and free up time for higher priority tasks

    • Set clear priorities and focus on important tasks to avoid wasting

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. He just asked how much will you take?

Interview Preparation Tips

Round: HR Interview
Experience: Nothing much, they are all concerned about money.
Tips: Just tell them as per company standard.

I applied via Walk-in and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Asked me my work experience and my education.
Round 2 - HR 

(1 Question)

  • Q1. About My work experince and my education and my knowledge.
Round 3 - One-on-one 

(2 Questions)

  • Q1. About my work experience and my education and my knowledge.
  • Q2. My Interoduction and my

Interview Preparation Tips

Interview preparation tips for other job seekers - I am very honesty and hord working person.

Interview Questionnaire 

1 Question

  • Q1.  Floor Tile thickness, types of tile, company of tile,

Interview Questionnaire 

1 Question

  • Q1. Site related

Interview Questionnaire 

1 Question

  • Q1. How many techniques you often use to do your work?

Interview Preparation Tips

Interview preparation tips for other job seekers - Dedicated time on work will helps you to gain pure knowledge, which is remember for life time and helps to gain confidence to do that work perfectly. This confidence reflect by your voice and face, which is recognised by interviewer.

I applied via Company Website and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What a term of Rolling margin on a steel?
  • Ans. Rolling margin is a difference weight of steel actual weight and theoretical weight.
  • Answered by Arvind Devrani
  • Q2. Initial setting time of cement
  • Ans. 

    Initial setting time of cement is the time taken by cement to harden and attain a particular strength.

    • Initial setting time is determined by Vicat apparatus

    • It is the time taken for the cement to lose its plasticity and become hard

    • The standard initial setting time for ordinary Portland cement is 30 minutes

    • Factors affecting initial setting time include temperature, water-cement ratio, and type of cement

  • Answered by AI
  • Q3. Elongation % of steel fy 500
  • Ans. 

    The elongation % of steel fy 500 is approximately 12%.

    • Elongation % is the measure of ductility of a material.

    • It is the percentage increase in length of a material before it fractures under tension.

    • For steel fy 500, the elongation % is approximately 12%.

    • This means that the steel can stretch up to 12% of its original length before it breaks.

  • Answered by AI
  • Q4. How much bag of cement in 1 cubic meter
  • Ans. 

    The amount of cement required for 1 cubic meter varies depending on the concrete mix design.

    • The amount of cement needed for 1 cubic meter of concrete varies from 250kg to 600kg depending on the mix design.

    • The mix design specifies the ratio of cement to other materials like sand and aggregates.

    • For example, a mix design of 1:2:4 requires 400kg of cement per cubic meter of concrete.

    • It is important to accurately calculate ...

  • Answered by AI
  • Q5. How much density of material Steel Concrete Sand
  • Ans. 

    Density of materials: Steel - 7850 kg/m3, Concrete - 2400 kg/m3, Sand - 1600 kg/m3

    • Density of steel is higher than that of concrete and sand

    • Density of concrete varies depending on the mix design

    • Density of sand can vary depending on the source and moisture content

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technically sound interview, like sagging hogging loads moment shear, all about steel, concrete and formwork such as qty calculation and fixing procedures.

URC Construction Interview FAQs

How many rounds are there in URC Construction Site Engineer interview?
URC Construction interview process usually has 1 rounds. The most common rounds in the URC Construction interview process are HR.

Tell us how to improve this page.

URC Construction Site Engineer Interview Process

based on 2 interviews

Interview experience

3
  
Average
View more
URC Construction Site Engineer Salary
based on 39 salaries
₹1.1 L/yr - ₹5.4 L/yr
16% less than the average Site Engineer Salary in India
View more details

URC Construction Site Engineer Reviews and Ratings

based on 6 reviews

4.6/5

Rating in categories

4.9

Skill development

4.6

Work-life balance

4.6

Salary

4.3

Job security

4.9

Company culture

4.6

Promotions

4.6

Work satisfaction

Explore 6 Reviews and Ratings
Assistant Engineer
182 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
132 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer - Civil
61 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
49 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
43 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare URC Construction with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview