  • Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
  • Q2. How much of quantity of piping done at ur location and the total duration for the completion of the same.
  • Q3. Viscosity of polymer before starting the pile boring, what is the pH value should be before boring, water test details,
View all 7 questions

L&T Construction Construction Management Interview Experiences

7 interviews found

Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Jan 2025.

Round 1 - Technical 

(2 Questions)

  • Q1. Mech engineering
  • Q2. All about rotatory parts

Interview Preparation Tips

Interview preparation tips for other job seekers - Go with all preparation
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Group Discussion 

Past Projects details to explain,

Round 3 - Technical 

(5 Questions)

  • Q1. Past Projects Technical
  • Q2. What type of Piling Mech your using previous project
  • Ans. 

    We used bored pile foundation method in our previous project.

    • Bored pile foundation method was used for piling in the previous project.

    • The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.

    • Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.

  • Answered by AI
  • Q3. What is the pile rig tark of Rig Mech
  • Ans. 

    The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.

    • Operating pile driving equipment efficiently

    • Maintaining and repairing equipment as needed

    • Ensuring safety protocols are followed during pile driving operations

  • Answered by AI
  • Q4. What is density of polymer,
  • Ans. 

    The density of a polymer refers to its mass per unit volume.

    • Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).

    • The density of a polymer can vary depending on factors such as its chemical composition and structure.

    • For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.

    • Higher density polymers tend to be more rigid and have higher melting points.

  • Answered by AI
  • Q5. Viscosity of polymer before starting the pile boring, what is the pH value should be before boring, water test details,
  • Ans. 

    The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.

    • Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.

    • The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.

    • Water test details should include para...

  • Answered by AI

Skills evaluated in this interview

Construction Management Interview Questions Asked at Other Companies

Q1. What are the different issues(technical & administrative) fac ... read more
Q2. What types of activities have you engaged in, including planning, ... read more
Q3. How much of quantity of piping done at ur location and the total ... read more
asked in HCC-VCCL JV
Q4. What is Top Down method and what is tha complete procedure of con ... read more
asked in HCC-VCCL JV
Q5. What is soldier pile and where is it required to construct?

I applied via Approached by Company and was interviewed in Nov 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Prepare your self as per your CV.
  • Q2. They required deep answer of every questions.
  • Q3. Time Cycle plan also discussed for every activities done in last projects.
Round 3 - HR 

(3 Questions)

  • Q1. Salary, reason of leaving, location
  • Q2. Documents Verification
  • Q3. Medical tests done at your nearest location by company expense.

Interview Preparation Tips

Topics to prepare for L&T Construction Construction Management interview:
  • As per CV
  • Work done in last projects
Interview preparation tips for other job seekers - Keep your self ready & up to date in technical as well managerial skills also, be honest & dedicated in your every project, prepare CV as per your knowledge & interest.

Interview Questionnaire 

3 Questions

  • Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
  • Ans. 

    Technical and administrative issues during construction execution and their solutions

    • Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders

    • Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting

    • Effective project...

  • Answered by AI
  • Q2. How much of quantity of piping done at ur location and the total duration for the completion of the same.
  • Ans. 

    The quantity of piping done at our location and the total duration for completion varied depending on the project.

    • The quantity of piping done at our location ranged from project to project.

    • The total duration for completion also varied based on the size and complexity of the project.

    • For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.

    • In another project...

  • Answered by AI
  • Q3. Types of valves, hydrotesting pressure in pipe lines, Units of pressure and their conversions
  • Ans. 

    Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.

    • Types of valves include gate, globe, ball, butterfly, and check valves.

    • Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.

    • Units of pressure include psi, bar, kPa, and MPa.

    • Conversions between units of pressure can be done using conversion factors.

    • For example, 1

  • Answered by AI

L&T Construction interview questions for designations

 Construction Engineer

 (2)

 Assistant Construction Manager

 (10)

 Senior Construction Manager

 (3)

 Construction Manager Civil

 (2)

 Senior Engineer Construction

 (1)

 Construction Manager - Mechanical

 (1)

 Mechanical Construction Engineer

 (1)

 Construction Engineer - Civil

 (1)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Structural engineering
  • Q2. Experience and expertise

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident

Get interview-ready with Top L&T Construction Interview Questions

I applied via Walk-in and was interviewed before Jan 2021. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. All about done and mentioned in your CV.
Round 3 - Technical 

(1 Question)

  • Q1. All about mentioned in cv.
Round 4 - HR 

(5 Questions)

  • Q1. Why are you looking for a change?
  • Q2. Tell me about yourself.
  • Q3. What are your strengths and weaknesses?
  • Q4. What are your salary expectations?
  • Q5. Share details of your previous job.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be sound in technical and confident.
Present yourself politely and with confidence.

Interview Questionnaire 

1 Question

  • Q1. Tell me about your self

Interview questions from similar companies

Interview Questionnaire 

1 Question

  • Q1. Sequence of toilets finishes
  • Ans. 

    The sequence of toilet finishes refers to the order in which different materials and fixtures are installed in a toilet during construction or renovation.

    • The first step is usually to install the plumbing and drainage system for the toilet.

    • Next, the walls and floors are prepared and waterproofed.

    • After that, the fixtures such as toilets, sinks, and urinals are installed.

    • Following the installation of fixtures, the walls a...

  • Answered by AI

I applied via Naukri.com and was interviewed in Apr 2022. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Tell me the best thing you have done in your previous project.
  • Q2. Tell me your achievement.
Round 2 - HR 

(1 Question)

  • Q1. Salary expectation and notice period required to join the organization.

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through the profile properly. Some profile needs efforts. They will give good salary also. You need to show your competency while working in TPL.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Express yourself
Round 2 - HR 

(1 Question)

  • Q1. Location of work

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Construction Management interview?
L&T Construction interview process usually has 2-3 rounds. The most common rounds in the L&T Construction interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Construction Construction Management interview?

Some of the top questions asked at the L&T Construction Construction Management interview -

  1. What are the different issues(technical & administrative) faced during the exec...read more
  2. How much of quantity of piping done at ur location and the total duration for t...read more
  3. Viscosity of polymer before starting the pile boring, what is the pH value shou...read more

Tell us how to improve this page.

L&T Construction Construction Management Interview Process

based on 7 interviews

2 Interview rounds

  • Resume Shortlist Round
  • Technical Round
View more
L&T Construction Construction Management Salary
based on 230 salaries
₹7.8 L/yr - ₹29.8 L/yr
9% more than the average Construction Management Salary in India
View more details

L&T Construction Construction Management Reviews and Ratings

based on 84 reviews

3.8/5

Rating in categories

4.0

Skill development

2.5

Work-life balance

3.7

Salary

4.0

Job security

3.3

Company culture

3.3

Promotions

3.2

Work satisfaction

Explore 84 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
703 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Construction Manager
504 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Site Engineer
393 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineering Manager
323 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview