Filter interviews by
I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.
Past Projects details to explain,
We used bored pile foundation method in our previous project.
Bored pile foundation method was used for piling in the previous project.
The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.
Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.
The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.
Operating pile driving equipment efficiently
Maintaining and repairing equipment as needed
Ensuring safety protocols are followed during pile driving operations
The density of a polymer refers to its mass per unit volume.
Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).
The density of a polymer can vary depending on factors such as its chemical composition and structure.
For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.
Higher density polymers tend to be more rigid and have higher melting points.
The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.
Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.
The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.
Water test details should include para...
I applied via Approached by Company and was interviewed in Nov 2021. There were 3 interview rounds.
Technical and administrative issues during construction execution and their solutions
Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders
Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting
Effective project...
The quantity of piping done at our location and the total duration for completion varied depending on the project.
The quantity of piping done at our location ranged from project to project.
The total duration for completion also varied based on the size and complexity of the project.
For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.
In another project...
Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.
Types of valves include gate, globe, ball, butterfly, and check valves.
Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.
Units of pressure include psi, bar, kPa, and MPa.
Conversions between units of pressure can be done using conversion factors.
For example, 1
I applied via Newspaper Ad and was interviewed before Sep 2022. There were 2 interview rounds.
L&T Construction interview questions for designations
I applied via Walk-in and was interviewed before Jan 2021. There were 4 interview rounds.
Get interview-ready with Top L&T Construction Interview Questions
Top trending discussions
posted on 18 Sep 2024
I have over 10 years of experience in construction management, overseeing various projects from start to finish.
Managed multiple construction projects simultaneously
Coordinated with architects, engineers, and subcontractors
Ensured projects were completed on time and within budget
Implemented safety protocols and quality control measures
Handled project documentation and reporting
Led a team of construction professionals
My project in M.Tech focused on sustainable construction practices using recycled materials.
Researched various recycled materials suitable for construction
Conducted experiments to test the strength and durability of these materials
Developed guidelines for incorporating recycled materials in construction projects
Collaborated with industry professionals to implement sustainable practices
Presented findings at conferences
posted on 28 Apr 2024
I was interviewed in Oct 2023.
There are typically two chambers in an overhead tank (OHT).
Most OHTs have two chambers - one for storing water and one for controlling the water level.
The water storage chamber holds the water supply, while the control chamber manages the flow of water into the tank.
Having two chambers helps in maintaining a consistent water supply and pressure in the tank.
The concrete and reinforcement quantity in an OHT depends on the design specifications and dimensions of the overhead tank.
Concrete quantity is calculated based on the volume of the tank and the required thickness of the walls and base.
Reinforcement quantity is determined by the structural design requirements for strength and durability.
Factors such as load capacity, water pressure, and seismic considerations also impa...
My expected CTC is negotiable based on the responsibilities and opportunities offered by the position.
My expected CTC is based on industry standards and my level of experience.
I am open to discussing the compensation package during the interview process.
I am looking for a competitive salary that reflects my skills and contributions to the company.
posted on 22 Mar 2024
I applied via Company Website and was interviewed in Feb 2024. There was 1 interview round.
posted on 18 Apr 2024
based on 75 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
662
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
528
salaries
| ₹5.4 L/yr - ₹17.5 L/yr |
Assistant Engineering Manager
321
salaries
| ₹6 L/yr - ₹17 L/yr |
Civil Site Engineer
320
salaries
| ₹1.2 L/yr - ₹7.5 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA