Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
Technical and administrative issues during construction execution and their solutions
Technical issues: delays due to weather, equipment breakdowns, design changes. Solutions: contingency plans, regular maintenance, clear communication with stakeholders
Administrative issues: budget constraints, permit delays, labor shortages. Solutions: cost-saving measures, proactive permit applications, subcontracting
Effective project management is key to identifying and addressing issues in...read more
Q2. What types of activities have you engaged in, including planning, managing piping material issues for contracts, fabrication, welding, inspection work, erection, mechanical completion, inspection clearance, hyd...
read moreI have extensive experience in planning, managing, and executing various activities related to piping material issues for contracts, fabrication, welding, inspection work, and mechanical completion in the construction industry.
Engaged in planning and managing piping material issues for contracts
Worked with materials such as carbon steel, alloy steel, stainless steel, and cast iron water pipelines
Provided services involving oil, gas, water, firewater lines, nitrogen, oily wate...read more
Construction Management Interview Questions and Answers for Freshers
Q3. How much of quantity of piping done at ur location and the total duration for the completion of the same.
The quantity of piping done at our location and the total duration for completion varied depending on the project.
The quantity of piping done at our location ranged from project to project.
The total duration for completion also varied based on the size and complexity of the project.
For example, in one project, we installed approximately 10,000 feet of piping, which took us around 6 months to complete.
In another project, the quantity of piping was much higher, around 50,000 fe...read more
Q4. What is Top Down method and what is tha complete procedure of construction of underground metro station by Top Down method?
Top Down method is a construction technique used for building underground structures starting from the top surface.
Excavation of the top-down shaft
Installation of temporary support system
Construction of the basement slab
Construction of the underground levels
Installation of permanent support system
Backfilling of the excavated area
Completion of the superstructure
Examples: London Underground's Jubilee Line Extension, Delhi Metro's Green Line
Q5. What is soldier pile and where is it required to construct?
Soldier pile is a type of retaining wall system used in construction to provide temporary or permanent support to excavations.
Soldier pile is a vertical structural member, typically made of steel or concrete, that is installed into the ground to support the excavation.
It is commonly used in situations where deep excavations are required, such as for basements or underground parking structures.
Soldier piles are spaced at regular intervals along the excavation perimeter and are...read more
Q6. HOWMANY TYPES OF SUPPORT TYPES ARE USED FOR PIPING FIXING ?
There are several types of support types used for piping fixing, including clamps, hangers, and anchors.
Clamps are used to hold pipes in place and prevent movement.
Hangers are used to support the weight of the pipes from above.
Anchors are used to secure pipes to a structure to prevent movement.
Other types of support types include guides, shoes, and struts.
Share interview questions and help millions of jobseekers 🌟
Q7. Viscosity of polymer before starting the pile boring, what is the pH value should be before boring, water test details,
The viscosity of polymer before pile boring, pH value before boring, and water test details are important factors in construction management.
Viscosity of polymer should be within specified range to ensure proper drilling and stability of the pile.
The pH value of the water should be neutral (around 7) to prevent corrosion of the equipment and ensure the effectiveness of the polymer.
Water test details should include parameters such as turbidity, conductivity, and presence of an...read more
Q8. Types of valves, hydrotesting pressure in pipe lines, Units of pressure and their conversions
Answering questions on types of valves, hydrotesting pressure in pipe lines, and units of pressure and their conversions.
Types of valves include gate, globe, ball, butterfly, and check valves.
Hydrotesting pressure is the pressure used to test the strength and integrity of a pipeline.
Units of pressure include psi, bar, kPa, and MPa.
Conversions between units of pressure can be done using conversion factors.
For example, 1 bar is equal to 100 kPa or 0.1 MPa.
Construction Management Jobs
Q9. What is your current cost to company (CTC) and what is your expected cost to company (CTC)?
My current CTC is $70,000 and my expected CTC is $80,000.
Current CTC is $70,000
Expected CTC is $80,000
The increase in CTC is due to additional responsibilities and experience gained
Q10. How would you handle a situation if any labor payment issues arise?
Addressing labor payment issues requires clear communication, investigation, and prompt resolution to maintain trust and productivity.
Communicate with the affected laborers to understand their concerns and gather details about the payment issue.
Investigate the root cause of the payment issue, whether it's a clerical error, miscommunication, or a delay in processing.
Collaborate with the finance department to expedite the payment process and ensure that laborers receive their d...read more
Q11. Offshore oil and gas structure piping material. Types of oil exploration ex. Fpso, fsru jacket well heads.
Offshore oil and gas structures use various piping materials such as carbon steel, stainless steel, and duplex stainless steel.
Common piping materials include carbon steel, stainless steel, and duplex stainless steel.
Carbon steel is often used for general applications, while stainless steel is preferred for corrosive environments.
Duplex stainless steel offers a combination of strength and corrosion resistance, making it suitable for offshore structures.
Examples of offshore oi...read more
Q12. What strategies can be implemented to reduce project costs?
Implementing cost-reduction strategies in construction can enhance efficiency and profitability while maintaining quality.
Conduct thorough project planning to identify potential cost overruns early.
Utilize value engineering to optimize project design and materials, such as using alternative materials that meet specifications but are less expensive.
Implement lean construction techniques to minimize waste and improve workflow efficiency.
Negotiate bulk purchasing agreements with...read more
Q13. What is the role of construction Manager of mechanical
The role of a construction manager of mechanical is to oversee the planning, design, and implementation of mechanical systems in a construction project.
Coordinate with architects and engineers to ensure mechanical systems are integrated into the overall design
Manage the installation and maintenance of HVAC, plumbing, and other mechanical systems
Ensure compliance with building codes and safety regulations
Collaborate with other construction managers to ensure timely completion ...read more
Q14. What type of Piling Mech your using previous project
We used bored pile foundation method in our previous project.
Bored pile foundation method was used for piling in the previous project.
The method involved drilling a hole into the ground and filling it with concrete and steel reinforcement.
Bored pile foundation is commonly used for high-rise buildings and structures requiring deep foundations.
Q15. What is the process for estimation and cost analysis?
Estimation and cost analysis in construction involves assessing project costs and resources for effective budgeting and planning.
Define project scope: Clearly outline the project's objectives and deliverables.
Gather historical data: Use past project costs as a benchmark for estimation.
Break down tasks: Divide the project into smaller tasks for detailed cost analysis.
Estimate costs: Calculate direct and indirect costs, including labor, materials, and overhead.
Use estimation te...read more
Q16. What is the concrete and reinforcement quantity in an OHT
The concrete and reinforcement quantity in an OHT depends on the design specifications and dimensions of the overhead tank.
Concrete quantity is calculated based on the volume of the tank and the required thickness of the walls and base.
Reinforcement quantity is determined by the structural design requirements for strength and durability.
Factors such as load capacity, water pressure, and seismic considerations also impact the quantity of concrete and reinforcement.
Example: A 1...read more
Q17. Do you have prepared project package plan? How you deal with clients and there complaints?
Yes, I have a prepared project package plan and I address client complaints by actively listening and finding solutions.
I always have a detailed project package plan outlining timelines, budget, resources, and milestones.
I prioritize open communication with clients to address any concerns or complaints promptly.
I actively listen to clients to understand their perspective and work towards finding mutually beneficial solutions.
I strive to maintain a positive relationship with c...read more
Q18. What is a construction site management system?
A construction site management system coordinates resources, schedules, and safety protocols to ensure efficient project execution.
Facilitates project planning and scheduling, e.g., Gantt charts for timeline management.
Tracks resource allocation, such as labor, materials, and equipment.
Enhances communication among stakeholders, including contractors, subcontractors, and clients.
Implements safety management protocols to minimize accidents on site.
Utilizes software tools for re...read more
Q19. What is the responsibility of construction manager
Construction managers are responsible for overseeing construction projects from start to finish, ensuring they are completed on time and within budget.
Planning and coordinating construction activities
Managing project budget and resources
Hiring and supervising subcontractors and construction workers
Ensuring compliance with building codes and regulations
Communicating with clients, architects, engineers, and other stakeholders
Resolving any issues or conflicts that may arise duri...read more
Q20. What is the Standard size of beam ?
Standard beam sizes vary by application, but common dimensions include 4x6, 6x8, and 8x10 inches.
Common residential beam sizes: 4x6 inches, 6x8 inches, and 8x10 inches.
Commercial beams may use larger dimensions, such as 10x12 inches or 12x14 inches.
Steel beams often come in standardized sizes like W8x10, where 'W' indicates a wide flange beam.
The size of the beam is determined by load requirements, span length, and material used.
Q21. what is the standard size of Column ?
Column sizes vary based on structural requirements, materials, and building codes, typically ranging from 12x12 inches to larger dimensions.
Standard sizes often range from 12x12 inches to 24x24 inches for concrete columns.
Steel columns can vary widely, with common sizes like W8x10 or W10x12.
The size is influenced by load-bearing requirements and building height.
Local building codes may dictate minimum dimensions for safety.
Q22. Explanations how to rule the Project ....
To rule a project effectively, a construction manager must establish clear goals, communicate effectively, manage resources efficiently, and adapt to changes.
Establish clear project goals and objectives
Communicate effectively with team members, stakeholders, and clients
Manage resources efficiently to stay within budget and timeline
Adapt to changes and challenges that may arise during the project
Delegate tasks appropriately to team members based on their strengths and skills
Q23. What types of chemical additives for biton?
Chemical additives for bitumen include polymers, rejuvenators, anti-stripping agents, and fibers.
Polymers improve the elasticity and durability of the bitumen.
Rejuvenators restore the aged bitumen to its original properties.
Anti-stripping agents prevent moisture damage and improve adhesion.
Fibers enhance the strength and toughness of the bitumen.
Examples of chemical additives include styrene-butadiene-styrene (SBS) polymer, crumb rubber, and hydrated lime.
Q24. Whether experience in Water Supply Project ?
Yes, I have experience in Water Supply Projects.
I have worked on multiple water supply projects in the past.
I have experience in designing and implementing water supply systems.
I have knowledge of the latest technologies and materials used in water supply projects.
I have experience in managing teams and ensuring timely completion of projects.
One of my recent projects involved designing and implementing a water supply system for a rural community.
Q25. What is the pile rig tark of Rig Mech
The pile rig task of a Rig Mech involves operating and maintaining equipment used for driving piles into the ground.
Operating pile driving equipment efficiently
Maintaining and repairing equipment as needed
Ensuring safety protocols are followed during pile driving operations
Q26. Per m3 how much numbers brick required
The number of bricks required per cubic meter varies depending on the size and type of brick used.
The number of bricks required per cubic meter can range from 400 to 700 depending on the size and type of brick.
For example, standard size bricks (190mm x 90mm x 90mm) typically require around 500 bricks per cubic meter.
Larger or smaller bricks will require more or fewer bricks per cubic meter respectively.
Q27. What is RoW n engineering ?
RoW in engineering refers to Right of Way, the legal right to pass through property owned by another.
RoW is crucial for infrastructure projects like roads, railways, and utilities.
It involves negotiations with property owners for land access.
Example: A highway project may require RoW agreements with multiple landowners.
RoW can also include easements for pipelines or power lines.
Failure to secure RoW can lead to project delays and increased costs.
Q28. What is the raft Foundation ?
A raft foundation is a large concrete slab supporting multiple columns and walls, distributing loads over a wide area.
Used in areas with weak soil to prevent settlement.
Commonly employed for high-rise buildings and heavy structures.
Example: Raft foundations are often used in skyscrapers to ensure stability.
Helps in reducing differential settlement by spreading loads evenly.
Constructed by pouring concrete over a reinforced grid.
Q29. What are the quality check for Concrete
Quality checks for concrete ensure strength, durability, and consistency.
Check the slump test to ensure proper workability
Perform compressive strength tests on samples
Inspect for air content to prevent cracking
Verify proper curing methods are being used
Check for uniformity in color and texture
Q30. Have you done any value addition?
Yes, I have implemented cost-saving measures and improved project efficiency through strategic planning and innovative solutions.
Implemented cost-saving measures such as optimizing material usage and reducing waste
Improved project efficiency through strategic planning and scheduling
Introduced innovative solutions to streamline processes and enhance productivity
Q31. How many chambers are there in an OHT
There are typically two chambers in an overhead tank (OHT).
Most OHTs have two chambers - one for storing water and one for controlling the water level.
The water storage chamber holds the water supply, while the control chamber manages the flow of water into the tank.
Having two chambers helps in maintaining a consistent water supply and pressure in the tank.
Q32. what is technology seo
Technology SEO refers to the practice of optimizing websites and online content in the construction management industry to improve search engine rankings and increase online visibility.
Technology SEO involves using various strategies and techniques to improve the visibility of construction management websites in search engine results pages (SERPs).
This includes optimizing website content, meta tags, and URLs, as well as improving website speed and mobile responsiveness.
Keywor...read more
Q33. Expected remuneration package ?
My expected remuneration package is competitive and reflective of my experience and skills.
I am looking for a salary in line with industry standards and my level of expertise
I am open to negotiation based on the specific responsibilities and benefits offered
I am also interested in opportunities for professional development and growth
Examples of benefits I value include health insurance, retirement plans, and flexible work arrangements
Q34. How do you manage logistics?
Effective logistics management in construction involves planning, coordination, and execution to ensure timely delivery of materials and resources.
Develop a detailed logistics plan that outlines the flow of materials from suppliers to the site.
Utilize project management software to track deliveries and manage schedules, ensuring timely arrival of materials.
Establish strong communication channels with suppliers and subcontractors to address any potential delays proactively.
Imp...read more
Q35. What is density of polymer,
The density of a polymer refers to its mass per unit volume.
Density of a polymer is typically measured in grams per cubic centimeter (g/cm^3).
The density of a polymer can vary depending on factors such as its chemical composition and structure.
For example, the density of polyethylene can range from 0.91 to 0.96 g/cm^3.
Higher density polymers tend to be more rigid and have higher melting points.
Q36. what is atom ?
An atom is the basic unit of matter, consisting of protons, neutrons, and electrons, forming the building blocks of all substances.
Atoms are made up of three main particles: protons (positive charge), neutrons (neutral), and electrons (negative charge).
The number of protons in an atom's nucleus determines its atomic number and identity (e.g., hydrogen has 1 proton).
Atoms can bond together to form molecules, such as water (H2O), which consists of two hydrogen atoms and one oxy...read more
Q37. What is your Expected CTC
My expected CTC is negotiable based on the responsibilities and opportunities offered by the position.
My expected CTC is based on industry standards and my level of experience.
I am open to discussing the compensation package during the interview process.
I am looking for a competitive salary that reflects my skills and contributions to the company.
Q38. no project in green field vs brown field
Greenfield projects are built on undeveloped land while brownfield projects are built on previously developed land.
Greenfield projects require more planning and infrastructure development.
Brownfield projects may require remediation of contaminated land.
Greenfield projects may face less regulatory hurdles.
Brownfield projects may have existing infrastructure that can be repurposed.
Examples of greenfield projects include new housing developments and industrial parks.
Examples of ...read more
Q39. BOQ of HT and LT lines
BOQ of HT and LT lines refers to the Bill of Quantities for High Tension and Low Tension electrical lines in a construction project.
BOQ includes detailed itemized list of materials, labor, and equipment needed for the construction of HT and LT lines.
BOQ helps in estimating the total cost of the project and ensures accurate budgeting.
Examples of items in BOQ for HT and LT lines include conductors, insulators, transformers, poles, and labor costs.
BOQ is essential for tendering,...read more
Q40. Sequence of toilets finishes
The sequence of toilet finishes refers to the order in which different materials and fixtures are installed in a toilet during construction or renovation.
The first step is usually to install the plumbing and drainage system for the toilet.
Next, the walls and floors are prepared and waterproofed.
After that, the fixtures such as toilets, sinks, and urinals are installed.
Following the installation of fixtures, the walls and floors are tiled or finished with other materials.
Final...read more
Q41. Execution of sub station
Execution of sub station involves planning, coordination, and management of construction activities for the substation.
Develop a detailed project plan outlining tasks, timelines, and resources required
Coordinate with various stakeholders including engineers, contractors, and utility companies
Ensure compliance with safety regulations and quality standards
Monitor progress and address any issues that may arise during construction
Perform regular inspections to ensure work is bein...read more
Q42. Process of wtp and stp
WTP and STP refer to water treatment plant and sewage treatment plant processes.
WTP involves processes like coagulation, flocculation, sedimentation, filtration, and disinfection to treat water for consumption.
STP involves processes like screening, primary treatment, secondary treatment, and disinfection to treat sewage before releasing it back into the environment.
Both processes are essential for maintaining clean water sources and protecting the environment.
Examples of WTP ...read more
Q43. Experience expected CTC
The expected CTC for a Construction Manager is typically based on their experience, qualifications, and the size of the projects they will be managing.
Expected CTC for a Construction Manager can range from $60,000 to $150,000 per year, depending on factors such as years of experience, level of education, and the complexity of projects.
Candidates with 1-3 years of experience may expect a CTC of around $60,000 to $80,000, while those with 5+ years of experience can aim for $100...read more
Q44. Process of steel plant
The process of a steel plant involves converting iron ore into steel through various stages of production.
Iron ore is mined and transported to the steel plant
The iron ore is then processed in a blast furnace to produce molten iron
The molten iron is further refined in a basic oxygen furnace or electric arc furnace to remove impurities and adjust the carbon content
The refined iron is then cast into various shapes or rolled into sheets
The final product is tested for quality and ...read more
Q45. Current LPA and Expected LPA.
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month