How much of quantity of piping done at ur location and the total duration for the completion of the same.
AnswerBot
1y
The quantity of piping done at our location and the total duration for completion varied depending on the project.
The quantity of piping done at our location ranged from project to project.
The total d...read more
Anonymous
3y
We have done 40KM of pipe lines(300NB, MS) in 50 days.