posted on 14 Nov 2024
I applied via Walk-in and was interviewed before Nov 2023. There was 1 interview round.
Pipe laying procedure involves planning, excavation, laying the pipe, backfilling, and testing for leaks.
Plan the layout of the pipes based on the project requirements and specifications.
Excavate the trench to the required depth and width to accommodate the pipe.
Lay the pipes carefully in the trench, ensuring proper alignment and slope for efficient flow.
Backfill the trench with suitable material to provide support and...
posted on 13 Feb 2025
I was interviewed before Feb 2024.
posted on 7 Feb 2025
I was interviewed before Feb 2024.
I was interviewed in Aug 2023.
L&T Construction interview questions for designations
I applied via LinkedIn and was interviewed in Jan 2023. There were 3 interview rounds.
Get interview-ready with Top L&T Construction Interview Questions
I applied via Company Website and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Feb 2023. There were 2 interview rounds.
Genral aptitude, technical electrical questions, mathematics
Power plants generate electricity by converting mechanical energy into electrical energy through various processes.
Power plants use fuel (such as coal, natural gas, or nuclear material) to heat water and produce steam.
The steam drives a turbine connected to a generator, which produces electricity.
There are different types of power plants including coal-fired, natural gas, nuclear, hydroelectric, and renewable energy pl...
Pipeline work involves the construction, maintenance, and repair of pipelines used for transporting fluids or gases.
Pipeline work includes excavation, welding, coating, and testing of pipelines.
Construction of pipelines involves laying pipes, installing valves, and building pump stations.
Maintenance work includes inspecting pipelines for leaks, corrosion, and other damage.
Repair work involves fixing leaks, replacing da...
Pipes are welded using various techniques such as arc welding, gas welding, and electric resistance welding.
Arc welding involves using an electric arc to melt the edges of the pipes and then joining them together.
Gas welding uses a flame produced by burning a mixture of fuel gas and oxygen to heat the pipes and create a molten pool for joining.
Electric resistance welding passes an electric current through the pipes, ge...
posted on 11 Aug 2022
I applied via Walk-in and was interviewed before Aug 2021. There were 3 interview rounds.
Just Aptitude things
My working area varied depending on the project, but typically ranged from 10,000 to 100,000 square feet.
My working area was determined by the size and scope of the construction project.
I have worked on projects ranging from small commercial buildings to large industrial facilities.
For example, one project I worked on was a 50,000 square foot warehouse.
Another project was a 100,000 square foot manufacturing plant.
I am ...
Spacing for 16mm dia rebar if 12mm dia rebar is not available.
Calculate the area of 12mm dia rebar and 16mm dia rebar.
Use the ratio of areas to find the spacing for 16mm dia rebar.
Spacing for 16mm dia rebar would be approximately 211 mm.
Ensure that the new spacing meets the required design standards.
I applied via Naukri.com and was interviewed in Oct 2020. There was 1 interview round.
Various types of structures are constructed in construction industry.
Residential buildings such as apartments, villas, and houses
Commercial buildings such as offices, shopping malls, and hotels
Industrial buildings such as factories and warehouses
Infrastructure projects such as roads, bridges, and tunnels
Specialized structures such as sports stadiums, hospitals, and airports
We follow strict safety protocols to ensure the well-being of workers and prevent accidents.
We conduct regular safety meetings to discuss potential hazards and how to avoid them.
We provide personal protective equipment (PPE) such as hard hats, safety glasses, and gloves.
We implement fall protection measures such as guardrails, safety nets, and harnesses.
We ensure that all equipment and machinery are properly maintained...
I have experience working with WTPs with capacities ranging from 5 MGD to 50 MGD.
Worked on a 5 MGD WTP project in my previous role
Managed construction of a 20 MGD WTP in my current role
Assisted in the design of a 50 MGD WTP during my internship
Top trending discussions
Some of the top questions asked at the L&T Construction Assistant Construction Manager interview -
based on 9 interviews
3 Interview rounds
based on 168 reviews
Rating in categories
Assistant Manager
1.1k
salaries
| ₹6 L/yr - ₹18.2 L/yr |
Senior Engineer
711
salaries
| ₹3 L/yr - ₹12 L/yr |
Assistant Construction Manager
504
salaries
| ₹5.4 L/yr - ₹18 L/yr |
Construction Management
332
salaries
| ₹8.2 L/yr - ₹35 L/yr |
Assistant Engineering Manager
321
salaries
| ₹6 L/yr - ₹17 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA