I applied via Naukri.com and was interviewed before Jan 2020. There were 5 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How much load is taking by adjustable props for shuttering works.
  • Ans. 

    The load taken by adjustable props for shuttering works depends on various factors.

    • The load capacity of adjustable props depends on their size and material.

    • The type of shuttering work being done also affects the load taken by adjustable props.

    • The load can vary from a few hundred kilograms to several tons.

    • Adjustable props are commonly used in construction to support formwork during concrete pouring.

    • The load taken by adj...

  • Answered by AI
  • Q2. How many types of shuttering methods & advantages for each.
  • Ans. 

    There are various types of shuttering methods used in construction, each with its own advantages.

    • Types of shuttering methods include timber, steel, aluminum, plastic, and fabric.

    • Timber shuttering is cost-effective and easy to work with, while steel shuttering is durable and reusable.

    • Aluminum shuttering is lightweight and easy to handle, while plastic shuttering is waterproof and easy to clean.

    • Fabric shuttering is flexi...

  • Answered by AI
  • Q3. Methodology for all finishing activities
  • Ans. 

    The methodology for finishing activities involves planning, coordination, and attention to detail.

    • Create a detailed schedule for finishing activities

    • Coordinate with subcontractors and suppliers to ensure timely delivery of materials

    • Ensure quality control measures are in place and followed

    • Conduct regular inspections to identify and address any issues

    • Communicate regularly with the project team to ensure everyone is on th...

  • Answered by AI
  • Q4. Brief information about self or candidate.
  • Ans. 

    Experienced construction professional with strong leadership and project management skills.

    • Over 5 years of experience in the construction industry.

    • Managed multiple construction projects from start to finish, ensuring timely completion and within budget.

    • Strong knowledge of construction methods, materials, and safety regulations.

    • Proven ability to lead and motivate teams to achieve project goals.

    • Excellent communication an...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Concentrate & give the reply very confidentially.

Interview questions from similar companies

I applied via Campus Placement and was interviewed before Mar 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is height of instrument
  • Ans. 

    Height of instrument is the vertical distance between the instrument and a reference point on the ground.

    • It is used in surveying to determine the elevation of points on the ground.

    • It is measured using a leveling instrument such as a level or a theodolite.

    • The height of instrument is calculated by subtracting the height of the reference point from the height of the instrument.

    • It is important to maintain a consistent heig...

  • Answered by AI
  • Q2. What should be the size of spacer bar
  • Ans. 

    The size of spacer bar depends on the size of the conductor and the voltage rating of the line.

    • The size of the spacer bar should be such that it maintains the required distance between the conductors.

    • The size of the spacer bar should be selected based on the voltage rating of the line.

    • The size of the spacer bar should be selected based on the size of the conductor.

    • The size of the spacer bar should be such that it can w...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Give special attention towards technical aspects and on structural analysis.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(2 Questions)

  • Q1. Tell me how road was construted
  • Ans. 

    Road construction involves several steps including planning, designing, clearing the land, laying the foundation, paving, and adding finishing touches.

    • Planning: Determine the route, traffic flow, and necessary permits.

    • Designing: Create detailed plans including width, materials, and drainage systems.

    • Clearing the land: Remove trees, rocks, and other obstacles.

    • Laying the foundation: Level the ground, add layers of gravel ...

  • Answered by AI
  • Q2. Tell me all technical specification about Sub grade to Wearing course.
  • Ans. 

    Sub grade to wearing course technical specifications include material type, thickness, compaction requirements, and drainage considerations.

    • Material type for sub grade can be natural soil, stabilized soil, or aggregate base.

    • Thickness of sub grade is typically specified based on soil conditions and traffic loads.

    • Compaction requirements ensure proper density and strength of the sub grade.

    • Wearing course materials can incl...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Job interview was not very hard.Actually they want candidates... Because everyone knows about their salary delay of 5-6 months.

I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less than 5 Meter cube.
  • Ans. 

    Only 1 set of cube sample is taken at a casting of concrete of 5 or less than 5 Meter cube to save cost and time.

    • Taking multiple samples would increase the cost of testing.

    • The strength of concrete is usually consistent within a small volume.

    • ASTM C31 allows for only 1 set of samples for small volume concrete.

    • If the first set of samples fails, additional samples can be taken for verification.

  • Answered by AI
  • Q2. How do we take slump for casting of concrete and what if when we go rise about 50 meter height ...is their any difference in slump value as we go rise or in high rise buildings
  • Ans. 

    Slump for casting of concrete is measured using a cone. Slump value may decrease as height increases in high rise buildings.

    • Slump is measured using a cone and the difference between the height of the cone and the height of the concrete after it settles is the slump value.

    • As height increases in high rise buildings, the pressure on the concrete increases, which may cause the slump value to decrease.

    • To maintain the desire...

  • Answered by AI
  • Q3. What if we r doing a casting of concrete and in the meantime rain comes and continue for 2 days what would be the right bonding agent for recasting of concrete
  • Ans. 

    The right bonding agent for recasting of concrete after rain would be a polymer-modified cementitious bonding agent.

    • The surface should be cleaned and dried before applying the bonding agent.

    • The bonding agent should be applied in a thin layer using a brush or roller.

    • The recasting of concrete should be done within the specified time frame mentioned by the bonding agent manufacturer.

    • Examples of polymer-modified cementitio...

  • Answered by AI
  • Q4. Shear force and bending moment description and calculation..
  • Ans. 

    Shear force is the force perpendicular to the beam and bending moment is the torque that causes bending of the beam.

    • Shear force is calculated by finding the algebraic sum of all the forces acting on one side of the beam.

    • Bending moment is calculated by finding the algebraic sum of all the moments acting on one side of the beam.

    • Shear force and bending moment diagrams are used to visualize the distribution of these forces...

  • Answered by AI
  • Q5. CMDI AND HDPE DIFFERENCE
  • Ans. 

    CMDI and HDPE are two different types of plastic materials used in various applications.

    • CMDI stands for Chlorinated Polyethylene Modified Polyethylene and is a thermoplastic elastomer used in wire and cable insulation, automotive parts, and roofing membranes.

    • HDPE stands for High-Density Polyethylene and is a thermoplastic polymer used in packaging, pipes, and construction materials.

    • CMDI has better resistance to chemica...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go for it u will succeed and have confidence ...confidence makes ur interview better......

Interview Questionnaire 

1 Question

  • Q1. Work experience questions first preference

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical Interview depends upon work experience,IS codes and software skills etc.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Process of Transmission line construction
  • Ans. 

    Transmission line construction involves planning, design, material procurement, site preparation, tower erection, conductor stringing, and testing.

    • Planning involves route selection, environmental impact assessment, and obtaining necessary permits.

    • Design includes determining tower locations, conductor size, and insulator type.

    • Material procurement involves sourcing towers, conductors, insulators, and hardware.

    • Site prepar...

  • Answered by AI
  • Q2. Explained right from survey to foundation to erection, Stringing and commissioning
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. In which type of structures do you work currently?
  • Q2. What is the grade of concrete you use in your project or working Structures?
Round 2 - HR 

(2 Questions)

  • Q1. What is your total experience?
  • Q2. How much salary would you expect?
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. About previous work experience
  • Q2. Difficulties in work
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(4 Questions)

  • Q1. Basics of concrete and mortars
  • Q2. What do you mean by slump test?
  • Ans. 

    Slump test is a concrete testing method to measure the consistency and workability of fresh concrete.

    • Slump test is performed by filling a mold with fresh concrete, then removing the mold and measuring how much the concrete slumps or settles.

    • The result of the slump test indicates the workability of the concrete mix - a higher slump value indicates higher workability.

    • The slump test is commonly used in construction to ens...

  • Answered by AI
  • Q3. What is segregation?
  • Ans. 

    Segregation is the separation of different components of a mixture based on their physical properties.

    • Segregation occurs when particles of different sizes, shapes, or densities separate from each other.

    • For example, in a concrete mix, larger aggregates tend to settle at the bottom while smaller particles rise to the top.

    • Segregation can also occur in granular materials like sand and gravel during handling and transportat...

  • Answered by AI
  • Q4. What is the process of brick work?
  • Ans. 

    The process of brick work involves laying bricks in a specific pattern using mortar to create walls or structures.

    • Prepare the surface by cleaning and dampening it

    • Lay a bed of mortar on the surface

    • Place the bricks in the desired pattern, ensuring they are level and aligned

    • Use a trowel to add more mortar between the bricks to secure them in place

    • Repeat the process for each layer of bricks until the desired height is reac...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Assistant Engineer interview:
  • Concrete and Quantity survey
  • Bar Bending Schedule
Interview preparation tips for other job seekers - Be confident your last previous roles and Responsibilities
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. All Civil basics knowledge as per your cv and experience.
  • Q2. Size of covering block
  • Ans. 

    The size of covering block is determined based on the type of structure and its requirements.

    • The size of covering block is usually specified in the design drawings or specifications.

    • It is important to consider the dimensions and spacing of reinforcement bars when determining the size of covering block.

    • The covering block should provide adequate protection to the reinforcement bars from fire, corrosion, and other environ...

  • Answered by AI
  • Q3. Length of development
  • Ans. 

    The length of development refers to the duration it takes to complete a project or task.

    • The length of development can vary depending on the complexity of the project.

    • Factors such as team size, resources, and scope can also impact the length of development.

    • It is important to set realistic timelines and milestones to ensure efficient development.

    • For example, a simple website development project may take a few weeks, whil...

  • Answered by AI
  • Q4. Bending moment and Soil test
  • Q5. Construction materials in details
  • Ans. 

    Construction materials are substances used for building and construction purposes.

    • Construction materials include cement, concrete, bricks, steel, wood, and glass.

    • Cement is a binding agent used in the production of concrete.

    • Concrete is a mixture of cement, sand, gravel, and water, used for construction.

    • Bricks are rectangular blocks made of clay or concrete, used for building walls.

    • Steel is a strong and durable material ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Assistant Engineer interview:
  • Structural Analysis
  • Cost Estimation
  • Quality Control
  • Bmcp
Interview preparation tips for other job seekers - Try to join through Head office.Never join through Regional office Or Site office.
Because you will get salary, increament everything good if you join directly through head office Hyderabad.
Visit website and submit Cv there.

B. G. Shirke Construction Technology Interview FAQs

What are the top questions asked in B. G. Shirke Construction Technology Assistant Construction Manager interview?

Some of the top questions asked at the B. G. Shirke Construction Technology Assistant Construction Manager interview -

  1. how much load is taking by adjustable props for shuttering work...read more
  2. How many types of shuttering methods & advantages for ea...read more
  3. Methodology for all finishing activit...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 426 Interviews
AECOM Interview Questions
4.2
 • 115 Interviews
Apco Infratech Interview Questions
3.7
 • 112 Interviews
Bechtel Interview Questions
4.0
 • 68 Interviews
View all
17% less than the average Assistant Construction Manager Salary in India
View more details

B. G. Shirke Construction Technology Assistant Construction Manager Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

4.0

Skill development

4.5

Work-life balance

3.0

Salary

5.0

Job security

4.5

Company culture

4.0

Promotions

4.5

Work satisfaction

Explore 2 Reviews and Ratings
Junior Engineer Civil
316 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
177 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
90 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer - Civil
87 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
75 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare B. G. Shirke Construction Technology with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview