I applied via Naukri.com and was interviewed before Jan 2020. There were 5 interview rounds.
The load taken by adjustable props for shuttering works depends on various factors.
The load capacity of adjustable props depends on their size and material.
The type of shuttering work being done also affects the load taken by adjustable props.
The load can vary from a few hundred kilograms to several tons.
Adjustable props are commonly used in construction to support formwork during concrete pouring.
The load taken by adj...
There are various types of shuttering methods used in construction, each with its own advantages.
Types of shuttering methods include timber, steel, aluminum, plastic, and fabric.
Timber shuttering is cost-effective and easy to work with, while steel shuttering is durable and reusable.
Aluminum shuttering is lightweight and easy to handle, while plastic shuttering is waterproof and easy to clean.
Fabric shuttering is flexi...
The methodology for finishing activities involves planning, coordination, and attention to detail.
Create a detailed schedule for finishing activities
Coordinate with subcontractors and suppliers to ensure timely delivery of materials
Ensure quality control measures are in place and followed
Conduct regular inspections to identify and address any issues
Communicate regularly with the project team to ensure everyone is on th...
Experienced construction professional with strong leadership and project management skills.
Over 5 years of experience in the construction industry.
Managed multiple construction projects from start to finish, ensuring timely completion and within budget.
Strong knowledge of construction methods, materials, and safety regulations.
Proven ability to lead and motivate teams to achieve project goals.
Excellent communication an...
posted on 15 Mar 2022
I applied via Campus Placement and was interviewed before Mar 2021. There were 2 interview rounds.
Height of instrument is the vertical distance between the instrument and a reference point on the ground.
It is used in surveying to determine the elevation of points on the ground.
It is measured using a leveling instrument such as a level or a theodolite.
The height of instrument is calculated by subtracting the height of the reference point from the height of the instrument.
It is important to maintain a consistent heig...
The size of spacer bar depends on the size of the conductor and the voltage rating of the line.
The size of the spacer bar should be such that it maintains the required distance between the conductors.
The size of the spacer bar should be selected based on the voltage rating of the line.
The size of the spacer bar should be selected based on the size of the conductor.
The size of the spacer bar should be such that it can w...
posted on 4 Aug 2024
Road construction involves several steps including planning, designing, clearing the land, laying the foundation, paving, and adding finishing touches.
Planning: Determine the route, traffic flow, and necessary permits.
Designing: Create detailed plans including width, materials, and drainage systems.
Clearing the land: Remove trees, rocks, and other obstacles.
Laying the foundation: Level the ground, add layers of gravel ...
Sub grade to wearing course technical specifications include material type, thickness, compaction requirements, and drainage considerations.
Material type for sub grade can be natural soil, stabilized soil, or aggregate base.
Thickness of sub grade is typically specified based on soil conditions and traffic loads.
Compaction requirements ensure proper density and strength of the sub grade.
Wearing course materials can incl...
posted on 17 Sep 2021
I applied via Walk-in and was interviewed in Mar 2021. There was 1 interview round.
Only 1 set of cube sample is taken at a casting of concrete of 5 or less than 5 Meter cube to save cost and time.
Taking multiple samples would increase the cost of testing.
The strength of concrete is usually consistent within a small volume.
ASTM C31 allows for only 1 set of samples for small volume concrete.
If the first set of samples fails, additional samples can be taken for verification.
Slump for casting of concrete is measured using a cone. Slump value may decrease as height increases in high rise buildings.
Slump is measured using a cone and the difference between the height of the cone and the height of the concrete after it settles is the slump value.
As height increases in high rise buildings, the pressure on the concrete increases, which may cause the slump value to decrease.
To maintain the desire...
The right bonding agent for recasting of concrete after rain would be a polymer-modified cementitious bonding agent.
The surface should be cleaned and dried before applying the bonding agent.
The bonding agent should be applied in a thin layer using a brush or roller.
The recasting of concrete should be done within the specified time frame mentioned by the bonding agent manufacturer.
Examples of polymer-modified cementitio...
Shear force is the force perpendicular to the beam and bending moment is the torque that causes bending of the beam.
Shear force is calculated by finding the algebraic sum of all the forces acting on one side of the beam.
Bending moment is calculated by finding the algebraic sum of all the moments acting on one side of the beam.
Shear force and bending moment diagrams are used to visualize the distribution of these forces...
CMDI and HDPE are two different types of plastic materials used in various applications.
CMDI stands for Chlorinated Polyethylene Modified Polyethylene and is a thermoplastic elastomer used in wire and cable insulation, automotive parts, and roofing membranes.
HDPE stands for High-Density Polyethylene and is a thermoplastic polymer used in packaging, pipes, and construction materials.
CMDI has better resistance to chemica...
posted on 21 Jul 2021
posted on 27 Sep 2023
I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.
Transmission line construction involves planning, design, material procurement, site preparation, tower erection, conductor stringing, and testing.
Planning involves route selection, environmental impact assessment, and obtaining necessary permits.
Design includes determining tower locations, conductor size, and insulator type.
Material procurement involves sourcing towers, conductors, insulators, and hardware.
Site prepar...
posted on 4 Dec 2024
I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.
posted on 17 Jul 2024
posted on 19 Feb 2024
I applied via Walk-in and was interviewed before Feb 2023. There was 1 interview round.
Slump test is a concrete testing method to measure the consistency and workability of fresh concrete.
Slump test is performed by filling a mold with fresh concrete, then removing the mold and measuring how much the concrete slumps or settles.
The result of the slump test indicates the workability of the concrete mix - a higher slump value indicates higher workability.
The slump test is commonly used in construction to ens...
Segregation is the separation of different components of a mixture based on their physical properties.
Segregation occurs when particles of different sizes, shapes, or densities separate from each other.
For example, in a concrete mix, larger aggregates tend to settle at the bottom while smaller particles rise to the top.
Segregation can also occur in granular materials like sand and gravel during handling and transportat...
The process of brick work involves laying bricks in a specific pattern using mortar to create walls or structures.
Prepare the surface by cleaning and dampening it
Lay a bed of mortar on the surface
Place the bricks in the desired pattern, ensuring they are level and aligned
Use a trowel to add more mortar between the bricks to secure them in place
Repeat the process for each layer of bricks until the desired height is reac...
posted on 11 Jan 2024
I applied via Company Website and was interviewed in Jul 2023. There was 1 interview round.
The size of covering block is determined based on the type of structure and its requirements.
The size of covering block is usually specified in the design drawings or specifications.
It is important to consider the dimensions and spacing of reinforcement bars when determining the size of covering block.
The covering block should provide adequate protection to the reinforcement bars from fire, corrosion, and other environ...
The length of development refers to the duration it takes to complete a project or task.
The length of development can vary depending on the complexity of the project.
Factors such as team size, resources, and scope can also impact the length of development.
It is important to set realistic timelines and milestones to ensure efficient development.
For example, a simple website development project may take a few weeks, whil...
Construction materials are substances used for building and construction purposes.
Construction materials include cement, concrete, bricks, steel, wood, and glass.
Cement is a binding agent used in the production of concrete.
Concrete is a mixture of cement, sand, gravel, and water, used for construction.
Bricks are rectangular blocks made of clay or concrete, used for building walls.
Steel is a strong and durable material ...
Some of the top questions asked at the B. G. Shirke Construction Technology Assistant Construction Manager interview -
based on 2 reviews
Rating in categories
Junior Engineer Civil
316
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
177
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer
90
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer - Civil
87
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
75
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company