Senior Construction Manager
Senior Construction Manager Interview Questions and Answers
Q1. What is the construction cost per sqm/sft for a commercial complex
The construction cost per sqm/sft for a commercial complex varies depending on location, materials used, and other factors.
Factors affecting cost include location, materials, labor, and design
In the US, the average cost for a commercial building is $150-$200 per sqft
In India, the cost can range from INR 1500-5000 per sqft depending on location and materials
It's important to consider long-term maintenance and operating costs when determining construction costs
Q2. MR value of which mix is more DBM with VG40 or DBM with PMB
The MR value of DBM with PMB is more than DBM with VG40.
MR value refers to the Marshall Stability value, which measures the strength and stability of an asphalt mix.
DBM stands for Dense Bituminous Macadam, VG40 and PMB are types of bitumen used in the mix.
DBM with PMB has a higher MR value compared to DBM with VG40 due to the improved properties of PMB.
PMB (Polymer Modified Bitumen) enhances the durability, flexibility, and resistance to deformation of the mix.
DBM with PMB is...read more
Q3. What is the basic role for construction manager?
Construction Manager is responsible for planning, coordinating, and supervising construction projects from start to finish.
Overseeing and managing the construction project
Ensuring the project is completed within budget and on time
Coordinating with architects, engineers, and contractors
Ensuring compliance with building codes and regulations
Managing the construction team and subcontractors
Preparing and presenting progress reports to stakeholders
Q4. Enclosure Required to start Interior Fitout or not
Enclosure is required to start interior fitout as it provides protection and security for the work area.
Enclosure helps to protect the interior fitout work from external elements such as weather and dust.
Enclosure provides security for tools and materials used in the interior fitout process.
Enclosure helps to maintain privacy and safety for workers during the fitout work.
Examples: Installing temporary walls or barriers around the work area before starting the interior fitout.
Q5. Bi drum boiler erection sequence
The erection sequence of a bi drum boiler involves several key steps to ensure proper installation and functionality.
Start by preparing the foundation for the boiler to ensure stability and support.
Next, assemble the lower drum and connect it to the foundation securely.
Then, install the upper drum and connect it to the lower drum using appropriate fittings.
After that, install the boiler tubes and headers to facilitate the flow of water and steam.
Finally, conduct thorough test...read more
Q6. Efficiency calculation of fired boilers.
Efficiency of fired boilers can be calculated by dividing the energy output by the energy input.
Efficiency = (Energy output / Energy input) * 100%
Energy output can be measured in terms of steam production or heat transfer to water
Energy input is the fuel energy input to the boiler
Efficiency can be improved by optimizing combustion, insulation, and heat recovery systems
Share interview questions and help millions of jobseekers 🌟
Q7. Safety interlock of fired boilers.
Safety interlock of fired boilers is a crucial system that ensures safe operation by preventing unsafe conditions.
Safety interlock system is designed to shut down the boiler if unsafe conditions are detected, such as low water level or high pressure.
Interlocks may include sensors, alarms, and automatic shutdown mechanisms.
Regular maintenance and testing of safety interlock systems are essential to ensure they function properly.
Examples of safety interlock devices include pres...read more
Q8. Define what is quality
Quality is meeting or exceeding customer expectations through consistent and reliable performance.
Quality is a measure of how well a product or service meets the needs and expectations of the customer.
It involves meeting or exceeding established standards and specifications.
Quality is achieved through consistent and reliable performance, attention to detail, and continuous improvement.
Examples of quality in construction include using high-quality materials, adhering to buildi...read more
Senior Construction Manager Jobs
Q9. Heat rate of turbine.
The heat rate of a turbine is a measure of how efficiently it converts fuel into electricity.
Heat rate is typically measured in British thermal units (BTUs) per kilowatt-hour (kWh).
A lower heat rate indicates higher efficiency, as less fuel is needed to generate the same amount of electricity.
Factors affecting heat rate include turbine design, operating conditions, and maintenance practices.
For example, a combined cycle power plant may have a heat rate of around 7,000 BTUs/kW...read more
Q10. TECHNICAL SKILL OF YOUR WORK
My technical skills include project management, budgeting, scheduling, and team leadership in construction.
Extensive experience in managing construction projects from start to finish
Strong understanding of budgeting and cost control in construction
Proficient in creating and managing project schedules
Skilled in leading and motivating teams to achieve project goals
Interview Questions of Similar Designations
Interview experiences of popular companies
Calculate your in-hand salary
Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Reviews
Interviews
Salaries
Users/Month